(a) No public or private electrical authority, corporation, company, individual or otherwise shall provide, connect, supply or install, or cause to be provided, connected, supplied or installed, to or upon any building, mobile home or premises to contain in the future a water or sewage system or permanent connections for the supply of electrical power from an outside source until a valid sewage disposal permit and water system approval for such structures has been obtained from the county health department. For the purposes of this chapter the term "permanent connections" means any connection other than that provided solely during the immediate and continuous construction of a structure itself. (b) Electrical wiring shall be in accordance with the minimum requirements and standards of the National Electrical Code. (c) Water supply and sewage disposal shall be constructed and installed in accordance with the minimum standard of the state board of health and the department of public health under 1964 Ga. Laws, pages 499—507.