A temporary emergency permit can be issued in the wetland protection district by the commissioner or his designee for the following reasons: (1) Maintenance or repair of lawfully located roads, structures and facilities used in the service of the public to provide transportation, electric, gas, water, telephone, telegraph, telecommunication or other services, provided such roads, structures or facilities are not materially changed or enlarged and, prior to the commencement of work, written notice has been given to the commissioner or his designee and, provided, the work is conducted using best management practices to ensure that flow and circulation patterns, and chemical and biological characteristics of the wetland, are not impaired, and any adverse effect on the aquatic environment will be minimized. (2) Temporary water level stabilization measures associated with silvicultural operations, provided, they are necessary to alleviate abnormally wet or dry conditions that would have an adverse impact on the conduct of silvicultural activities if not corrected. (3) Limited ditching, tilling, dredging, excavating or filling done solely for the purpose of maintaining or repairing existing drainage systems necessary for the cultivation of agricultural crops, provided, the maintenance or repair activity does not result in the impairment, alteration or loss of wetlands not previously subject to agricultural and silvicultural use under the terms and provisions of section 30-216. (4) Limited excavating and filling which is necessary for the repair and maintenance of piers, walkways, nature trails, observation decks, wildlife management shelters, boathouses or other similar water related structures, unobstructed flow of water and preserve the natural contour of the wetland.