Sec. 22-64. Fees.

About this text

  • As published by Municode, current through 2025-11-25
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Schedule of building permit fees.

(1) Residential building permit fees are based on construction cost of $90.00 per square foot for heated living area, $35.00 per square foot for garage, and $30.00 per square foot for unfinished basement, porch, terrace, and carport area. Total valuation fees as follows:

a. Two thousand dollars and less: No fees, unless inspection required, in which case a $25.00 fee for each inspection shall be charged;

b. Two thousand one dollars to $50,000.00: Twenty dollars for the first $1,000.00 plus $5.00 for each additional thousand or fraction thereof, to and including $50,000.00;

c. Fifty thousand one dollars to $100,000.00: Two hundred sixty-four dollars for the first $50,000.00 plus $4.00 for each additional thousand or fraction thereof, to and including $99,000.00;

d. One hundred thousand dollars to $500,000.00: Four hundred sixty-five dollars for the first $100,000.00 plus $3.00 for each additional thousand or fraction thereof, to and including $500,000.00;

e. Five hundred thousand one dollars and up: One thousand six hundred sixty dollars for the first $500,000.00 plus $2.00 for each additional thousand or fraction thereof.

(2) Commercial/industrial building permit fees are based on construction cost of $85.00 per square foot. Total valuation fees as follows:

a. Five hundred dollars to $3,000.00: Fifty dollars;

b. Three thousand one dollars $50,000.00: Fifty dollars for the first $3,000.00 plus $6.00 for each additional thousand or fraction thereof, to and including $50,000.00;

c. Fifty thousand one dollars to $100,000.00: Three hundred thirty-two dollars for the first $50,000.00 plus $5.00 for each additional thousand or fraction thereof, to and including $100,000.00;

d. One hundred thousand one dollars to $500,000.00: Five hundred eighty-two dollars for the first $100,000.00 plus $4.00 for each additional thousand or fraction thereof, to and including $500,000.00;

e. Five hundred thousand one dollars and up: Two thousand one hundred eightytwo dollars for the first $500,000.00 plus $3.00 for each additional thousand or fraction thereof.

(b) Re-inspection fee for permitted jobs. After an inspection is requested, if the work is disapproved by the building inspector or if the building is not ready for inspection when the inspector arrives, a $35.00 re-inspection fee will be required to be paid prior to a re-inspection being made. If a second re-inspection is required, the fee will be $50.00 and the re-inspection fee will be required to be paid prior to the second re-inspection being made. If a third re-inspection is required, the fee will be $75.00 and the re-inspection fee will be required to be paid prior to the third re-inspection being made. Any further re-inspections after the third will be $100.00 each. All re-inspection fees must be paid before further inspections or new inspections are performed and before any certificate of occupancy is issued.

(c) Miscellaneous construction permit/moving fee. For the moving of any structure, the fee shall be $100.00. These fees shall be paid by property owner not the tenant.

(d) Demolition fee. Fee shall be one percent of the accessed value of the property being demolished with a minimum fee of $50.00.

(e) Penalties. Where work for which a permit is required is started or proceeded prior to obtaining said permit, the fee herein specified shall be doubled. The payment of such double fee shall not relieve any person from fully complying with the requirements of applicable codes in the execution of the work, nor from any other penalties prescribed herein.

(f) Plan-checking fee. When the valuation of construction exceeds $2,000.00, a plan is required to be submitted in compliance with chapter 105.3 of Standard Building Code (SBCCI), a plan-check fee shall be paid to the building official at the time of submitting the plan and specifications for checking. The amount of the plan-check fee shall be equal to one-half of the building permit fee as set forth herein. Such plan-check fee is in addition to the building permit fee.

(g) Calculation of electrical permit fees:

(1) Residential. Forty-five dollars for the first 200 amp service, plus $15.00 for each additional 200 amps or fraction thereof.

(2) Commercial and industrial. Fifty-five dollars for the first 200 amp service, plus $25.00 for each additional 200 amps or fraction thereof.

(h) Calculation of plumbing permit fees:

(1) Residential. Forty-five dollars for the first 12 fixtures or traps plus $5.00 for each additional fixture or trap thereafter.

(2) Commercial and industrial. Fifty-five dollars initial fee for issuing each permit, plus $5.00 for each fixture or trap.

(i) Calculation of heating and air conditioning permit fees:

(1) Residential. Forty-five dollars for the first 100,000 BTU and/or five-ton heat-pump, plus $20.00 for each additional 50,000 BTU and/or three-ton heat-pump or fraction thereof.

(2) Commercial and industrial. Fifty-five dollars initial fee for issuing each permit, plus $5.00 for each additional $1,000.00 or fraction thereof, of valuation of the installation.

(j) Contractor and subcontractor license fees. The contractor and subcontractor license fees will be established in accordance with the policies set forth in the county's occupation tax ordinance.

(k) Exceptions to fee schedule. The fees specified herein shall apply to any person, firm, or corporation, except as follows:

(1) The fees shall be waived for permits to repair or rebuild property damaged by storms, tornadoes, snow, hail, wind or other natural disasters. Such disaster must be verified by the building inspector. Applicable permits must be obtained, but at no charge.

(2) All projects financed by federal, state, county and city funds are exempt from permit fees. Applicable permits must be obtained, but at no charge.

(l) Blasting permits must be obtained in accordance with the requirements of Georgia Law and a copy of any permits obtained must be filed with the county building inspector.

(m) Residential home sale and rental inspection fee. There shall be no charge for the initial inspection and the first follow-up inspection. There shall be a $50.00 fee for the second follow-up inspection. There shall be a $75.00 fee for the third follow-up inspection. There shall be a $100.00 fee for the fourth follow-up inspection and each additional inspection thereafter.

All fees must be paid before the inspections are made. This inspection is good for two years and the property does not have to be re-inspected within said period even if the property is sold.

History

The history line the source prints at the end of the section.

(Ord. No. 187, § 2, 12-12-2006; Ord. No. 199, §§ 1—4, 12-11-2007; Ord. No. 201, § 1, 12-13-2007)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:upson-county/code/22-64@2025-11-25-6c3554b4e6

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.