Skip to content
Georgia Commons
Menu

Upson County · Code of Ordinances

Part II - CODE / Chapter 78 - SUBDIVISIONS / Article IV - DESIGN / Division 2 - STANDARDS

Sec. 78-423. Commercial and industrial lots.

About this text

  • As published by Municode, current through 2025-11-25
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Size, shape, and arrangements of commercial and industrial lots, where platted and classified as a subdivision, shall be subject to the approval of the planning commission. Where public water and/or sewer are not available, minimum lot size and minimum coverage shall be based on lot area needed for proper sewage disposal and/or water supply. In no case shall the building setback on all streets be closer than 15 feet from the front property line of the lot, and within such space no permanent surface structures or facilities shall be constructed.

History

The history line the source prints at the end of the section.

(Ord. No. 134, § 6-37, 5-11-2000)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:upson-county/code/78-423@2025-11-25-d4835e12fb

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.