Easements shall be required in subdivisions for the following purposes: (1) Utility easements. When it is found to be necessary and desirable to locate public utility lines in other than street rights-of-way, easements shall be shown on the plat for such purposes. Such easements shall not be less than 12 feet in width and, where possible, shall be centered on rear or side lot lines. (2) Watercourse and drainage easements. Where a proposed subdivision is traversed by a watercourse, drainageway, or stream, appropriate provisions shall be made to accommodate stormwater and drainage through and from the proposed subdivision. Such easement shall conform substantially with the lines of the watercourse and shall be of sufficient width or construction or both as to be adequate for the purpose. (3) Ingress, egress. For the purpose of this chapter, easements will not be recognized as a means of legal ingress or egress.