Upson County · Code of Ordinances
Part II - CODE / Chapter 78 - SUBDIVISIONS / Article V - IMPROVEMENTS / Division 1 - GENERALLY
Sec. 78-463. Storm drainage.
About this text
- As published by Municode, current through 2025-11-25
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
An adequate drainage system, including necessary open ditches, pipes, culverts, intersectional drains, drop inlets, bridges, etc., shall be provided in a subdivision for the proper drainage of all surface water according to curb and gutter plans and specifications, as required,
and approved by a department or official designated by the county commissioners. Cross drains shall be provided to accommodate all natural water flow and shall be of sufficient length to permit a full-width roadway and the required slopes. The size of pipe to be provided shall be determined and approved by a department or official designated by the county commissioners.
History
(Ord. No. 134, § 7-3, 5-11-2000)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.