In a subdivision, after grading is completed and approved and before any base is applied, all of the underground work within the street right-of-way (water mains, gas mains, etc.) shall be installed completely and approved throughout the length of the road and across the flat section. At the same time all service connections shall be stubbed out to each lot. All underground utilities are to be installed as per slotting arrangements by local utility providers.