All streets to be paved in a subdivision must be prepared and paved according to the following methods or by equivalent methods that are acceptable to the county commissioners and approved by the county road superintendent: (1) Base. The base shall consist either of select topsoil, sand, clay, or other approved material having a minimum thickness of six inches after being thoroughly compacted and shall be constructed on a prepared subgrade in accordance with these specifications and in conformity with the county road construction and paving ordinance. a. All materials shall be of an approved type. b. All materials shall be mixed to the extent necessary to produce a thoroughly pulverized and homogenous mixture. c. As soon as the base material has been spread and mixed, the base shall be brought to approximate line, grade and cross section and then rolled with a sheepsfoot roller until the roller walks out and finally with a pneumatic tire or general purpose roller until full thickness of the base course has been compacted thoroughly. Defects shall be remedied as soon as they are discovered. d. The base course shall be maintained under traffic and kept free from ruts, ridges and dustings, true to grade and cross section until it is primed. e. No base material shall be deposited or shaped when the subgrade is frozen or thawing or during unfavorable weather conditions. (2) Pavement. Unless otherwise approved by a department or official designated by the county commissioners, pavement shall be constructed as follows: Paving shall be provided as specified in the county road construction and paving ordinance. (3) Seals. Care and precaution shall be taken that all points between such structures as manholes and curbs and the surface mixture are well sealed.