--- title: Upson County Code of Ordinances, Sec. 90-32. Performance of work collection: local-codes id: local-code:upson-county/code/90-32 cite_as: Upson County, Ga., Code of Ordinances § 90-32 canonical_url: https://georgiacommons.org/counties/upson/code/90-32 md_url: https://georgiacommons.org/counties/upson/code/90-32.md text_url: https://georgiacommons.org/counties/upson/code/90-32/text source_url: https://library.municode.com/ga/upson_county/codes/code_of_ordinances date: 2025-11-25 status: active jurisdiction: county:upson jurisdiction_name: Upson County county_fips: "13293" corpus_version: local-codes-upson-county-7c6dbb72fd6d publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/upson/code/~part-ii/~chapter-90/~article-ii.md previous: https://georgiacommons.org/counties/upson/code/90-31.md next: https://georgiacommons.org/counties/upson/code/90-33.md index: https://georgiacommons.org/counties/upson.md branch: code edition: As published by Municode, current through 2025-11-25 edition_date_kind: current_through source_publisher: Municode version_id: local-code:upson-county/code/90-32@2025-11-25-b8a131c1de --- # Upson County Code of Ordinances, Sec. 90-32. Performance of work > As published by Municode, current through 2025-11-25 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE / Chapter 90 - UTILITIES / Article II - FACILITY INSTALLATIONS The work required under this article shall be performed in a workmanlike manner, and all installations shall be done in such a way as to leave free flows in drainage ditches, pipes, culverts or other surface water drainage facilities of the roadway or its connections. No part of any installation shall be attached to any portion or a bridge, culvert or other structure of the roadway without special authorization of the superintendent of public works after detailed information is furnished as he may require. The permittee or the utility owner will be required to restore or repair any portion of a bridge or highway disturbed by utility installations or use. Note: The state department of transportation bridge engineer's approval may be required. No open cuts in pavement will be permitted except by special permission of the superintendent of public works. ## History (Ord. No. 23, § 3, 3-4-1983)