--- title: Upson County Code of Ordinances, Sec. 90-33. Excavations in pavement collection: local-codes id: local-code:upson-county/code/90-33 cite_as: Upson County, Ga., Code of Ordinances § 90-33 canonical_url: https://georgiacommons.org/counties/upson/code/90-33 md_url: https://georgiacommons.org/counties/upson/code/90-33.md text_url: https://georgiacommons.org/counties/upson/code/90-33/text source_url: https://library.municode.com/ga/upson_county/codes/code_of_ordinances date: 2025-11-25 status: active jurisdiction: county:upson jurisdiction_name: Upson County county_fips: "13293" corpus_version: local-codes-upson-county-7c6dbb72fd6d publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/upson/code/~part-ii/~chapter-90/~article-ii.md previous: https://georgiacommons.org/counties/upson/code/90-32.md next: https://georgiacommons.org/counties/upson/code/90-34.md index: https://georgiacommons.org/counties/upson.md branch: code edition: As published by Municode, current through 2025-11-25 edition_date_kind: current_through source_publisher: Municode version_id: local-code:upson-county/code/90-33@2025-11-25-5345193ee1 --- # Upson County Code of Ordinances, Sec. 90-33. Excavations in pavement > As published by Municode, current through 2025-11-25 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE / Chapter 90 - UTILITIES / Article II - FACILITY INSTALLATIONS Where breaking of pavement has been approved under this article, a minimum eight-inch class B concrete for asphalt surface will be poured over the backfilled trench and will rest on the undisturbed soil a minimum cutback of 12 inches of pavement on each side of the trench. If the pavement is asphalt, the surface of the eight-inch concrete slab will be two inches below the surface of the abutting pavement. The two-inch section will be replaced with the same type material as the existing surface. The finished surface will be smooth and flush with the abutting pavement. Only one-half of the roadway is to be opened at one time. ## History (Ord. No. 23, § 4, 3-4-1983)