--- title: Walker County Code of Ordinances, Sec. 16-563. Education and certification collection: local-codes id: local-code:walker-county/code/16-563 cite_as: Walker County, Ga., Code of Ordinances § 16-563 canonical_url: https://georgiacommons.org/counties/walker/code/16-563 md_url: https://georgiacommons.org/counties/walker/code/16-563.md text_url: https://georgiacommons.org/counties/walker/code/16-563/text source_url: https://library.municode.com/ga/walker_county/codes/code_of_ordinances date: 2026-07-09 status: active jurisdiction: county:walker jurisdiction_name: Walker County county_fips: "13295" corpus_version: local-codes-walker-county-34d5670eb847 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/walker/code/~part-ii/~chapter-16/~article-vi.md previous: https://georgiacommons.org/counties/walker/code/16-562.md next: https://georgiacommons.org/counties/walker/code/16-564.md index: https://georgiacommons.org/counties/walker.md branch: code edition: As published by Municode, current through 2026-07-09 edition_date_kind: current_through source_publisher: Municode version_id: local-code:walker-county/code/16-563@2026-07-09-d5c29a1269 --- # Walker County Code of Ordinances, Sec. 16-563. Education and certification > As published by Municode, current through 2026-07-09 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 16 - ENVIRONMENT / Article VI - SOIL EROSION AND SEDIMENTATION CONTROL (a) Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the Commission in consultation with the Division and the Stakeholder Advisory Board created pursuant to O.C.G.A. § 12-7-20. (b) For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the State General Permit, shall have as a minimum 1 person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the Commission present on site whenever land-disturbing activities are conducted on that site. A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the State general permit. (c) Persons or entities involved in projects not requiring a State general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this article. (d) If a State general permittee who has operational control of land-disturbing activities for a site has met the certification requirements of O.C.G.A. § 12-7-19(b)(1), then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A. § 12-7-19(b)(4) and shall not be required to meet any educational requirements that exceed those specified in said subsection. ## History (Ord. of 6-24-2004(eff.), § VIII; Ord. of 12-17-2009, § VIII)