No building permit shall be issued for a building or use on a lot which does not: (1) Abut on an already constructed, dedicated and publicly accepted and maintained State, municipal or County street or road; (2) Abut on a street in a subdivision which has received final approval, but is not yet recorded, and for which proper bond has been posted; or (3) Abut on a private drive, or a permanent recorded easement or right-of-way which serves no more than 6 separate residential dwellings, lots or tracts and provides access to a publicly accepted and maintained road, provided that the following criteria are met: a. A private drive, easement or right-of-way utilized for access must be at least 50 feet in width. Each parcel of property that accesses the private drive, easement or right-of-way must be a minimum of 1 acre, except all property that is zoned A-1 requires a minimum of 5 acres. A maximum of 6 parcels may access the private drive, easement or right-of-way. No additional private drive, easement or right-of-way may be created from the original private drive, easement or right-of-way or any parcel that has access thereto. Each private drive, easement or right-of-way must satisfy the County: (1) Fire Department dead end road requirements; (2) setback requirements; and (3) storm water and soil erosion plan requirements. All deeds and plats are required to set forth the private drive, easement or right-of-way. All deeds and permits that provide a private drive, easement or right-ofway to be utilized for access shall include a provision that each property owner shall be responsible for the property owner's share of the cost of the maintenance of the private drive, easement or right-of-way. For example, if 4 property owners access a private drive, easement or right-of-way, then each property owner shall be responsible for ΒΌ of the cost of the maintenance of the private drive, easement or right-of-way.