(a) Easements across lots or centered on rear or side lot lines shall be provided for utilities and drainage where necessary, and shall not be less than a total of 15 feet wide, unless otherwise approved by the Engineering Department of the specific utility. (b) Where a subdivision is traversed by an existing or proposed watercourse, drainage way, channel or stream, there shall be provided a storm drainage easement or right-of-way conforming substantially with the lines of such existing or planned drainage way. The width of such drainage easement or right-of-way shall be sufficient to contain the ultimate channel and maintenance way for the tributary area upstream. (c) Lots and easements shall be arranged in such a manner as to eliminate unnecessary easement jogs or off-sets, and to facilitate the use of easements for power distribution, telephone service, drainage, water, and sewer service.