Walker County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 22 - LAND DEVELOPMENT / Article VII - CHICKAMAUGA BATTLEFIELD CORRIDOR OVERLAY DISTRICT / Division 3 - COMMERCIAL DESIGN GUIDELINES
Sec. 22-513. Storm drainage.
About this text
- As published by Municode, current through 2026-07-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The runoff from parking and loading areas, buildings, and other impervious surfaces greater than 5,000 square feet shall be detained and treated in constructed wetlands or bio-retention areas (rain gardens) using engineered soil and aquatic grasses promoting natural filtering of pollutants and infiltration of stormwater into the ground.
Stormwater management practices shall be followed such as those recommended by the Center for Watershed Protection, Ellicott City, MD (www.cwp.org) or as described in the Georgia Stormwater Manual (www.georgiastormwater.com).
History
(Ord. of 5-19-2005, § 3.10)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.