The maximum number of lots in the Conservation Subdivision shall be determined by either of the following 2 methods, at the discretion of the applicant: (1) Calculation method. The maximum number of lots is determined by dividing the area of the tract of land by the minimum lot size specified in either the underlying zoning or local Health Department standards, whichever is greater. In making this calculation, the following shall not be included in the total area of the parcel: a. The 100-year flood hazard zone. b. Bodies of open water over 5,000 square feet contiguous area. c. Wetlands that meet the definition of the U.S. Army Corps of Engineers pursuant to the Clean Water Act. d. 50 percent of land with slopes greater than 25 percent, of at least 5,000 square feet contiguous area. e. Street and utility rights-of-way. f. Land within the right-of-way of high tension electrical transmission lines 69 KV or greater. g. Any other land that is not otherwise eligible for building. (2) Yield plan method. The maximum number of lots is based on a conventional subdivision design plan, prepared by the applicant, in which the tract of land is subdivided in a manner intended to yield the highest number of lots possible. This plan need not meet formal requirements for a site design plan, but the design must be economically feasible and capable of being constructed given site features and all applicable regulations. At its discretion, the Planning Director may require applicant to submit soils samples from 10 percent of lots to verify soils suitability. Such lots shall be selected by Planning Office, as being the most questionable lots on the property.