Walker County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 22 - LAND DEVELOPMENT / Article VIII - POST-DEVELOPMENT STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 1 - GENERALLY
Sec. 22-699. Definitions.
About this text
- As published by Municode, current through 2026-07-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Applicant means a person submitting a post-development stormwater management application and plan for approval.
Building means any structure, either temporary or permanent, having walls and a roof, designed for the shelter of any person, animal, or property, and occupying more than 100 square feet of area.
Channel means a natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water.
Conservation easement means a legal agreement between a landowner and a government agency or land trust that permanently protects open space or greenspace by limiting the amount and type of development that can take place, but continues to leave the land in private ownership.
Detention means the temporary storage of stormwater runoff in a stormwater management facility with the goal of controlling the peak discharge.
Detention facility means a detention basin or structure designed for the purpose of temporary storage of stormwater runoff or stream flow and gradual release of stored water at controlled rates.
Developer means a person who undertakes land disturbance activities.
Development means land development or land development project.
Drainage easement means a legal right granted by a landowner to a grantee allowing the use of private land for stormwater management purposes.
Erosion and sedimentation control plan means a plan that is designed to minimize the accelerated erosion and sediment runoff at a site during land-disturbing activities.
Extended detention means the detention of stormwater runoff for an extended period, typically 24 hours or greater.
Extreme flood protection means preventing adverse impacts from large low-frequency storm events with a return frequency of 100 years or greater. It is intended to protect the public safety and welfare.
Flooding means a volume of surface water that is too great to be confined within the banks or walls of a conveyance or stream channel and that overflows onto adjacent lands.
Greenspace or open space means permanently protected areas of the site that are preserved in a natural state.
Hotspot means an area where the land use or activities with the potential to generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater.
Hydrologic soil group (HSG) means a Natural Resource Conservation Service classification system in which soils are categorized into 4 runoff potential groups. The groups range from A soils, with high permeability and little runoff production, to D soils, which have low permeability rates and produce much more runoff.
Impervious cover means a surface composed of any material that significantly impedes or prevents the natural infiltration of water into soil. Impervious surfaces include, but are not limited to, rooftops, buildings, streets and roads, and any concrete, asphalt, or compacted soil surface.
Industrial stormwater permit means a National Pollutant Discharge Elimination System (NPDES) permit issued to a commercial industry or group of industries which regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies.
Infiltration means the process of percolating stormwater runoff into the subsoil.
Jurisdictional wetland means an area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation typically adapted for life in saturated soil conditions, commonly known as hydrophytic vegetation.
Land development orland development project means any land change, including, but not limited to, clearing or timbering, digging, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving, and any other installation of impervious cover.
Landowner means the legal or beneficial owner of land, including those holding the right to purchase or lease the land, or any other person holding proprietary rights in the land.
Linear development project means a land development project that is linear in nature, such as, but not limited to:
(1) The construction of electric and telecommunication utility lines, natural gas pipelines, water and sewer lines, and related facilities;
(2) Construction of tracks, rights-of-way, bridges, communication facilities and other related facilities of a railroad company.
Locality means County or city.
Maintenance agreement means a legally recorded document that acts as a property deed restriction, and which provides for long-term maintenance of stormwater management facilities and practices.
New development means land-disturbing activities, structural development (construction, installation or expansion of a building or other structure), and/or creation of impervious surfaces on a previously undeveloped site.
Nonpoint source pollution means a form of water pollution that does not originate from a discrete point, such as a sewage treatment plant or industrial discharge. Pollutants such as sediment, fertilizers and pesticides, heavy metals, oil and grease, bacteria, organic materials and other contaminants are delivered from land to surface water and groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollution is a byproduct of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources.
Nonstructural stormwater practice means any natural or nonstructural vegetated feature or nonstructural component of the stormwater management plan that provides stormwater quantity and/or quality control or benefits. This includes, but is not limited to, riparian buffers, open and greenspace areas, overland flow filtration areas, natural depressions, and vegetated channels.
Off-site facility means a stormwater management facility located outside the subject property boundary described in the permit application.
On-site facility means a stormwater management facility located within the subject property boundary described in the permit application necessary to control stormwater runoff for that site.
Overbank flood protection means preventing an increase in the frequency and magnitude of damaging out-of-bank flooding. It is intended to protect downstream properties from flooding for the 2-year through 25-year frequency storm events.
Overbank flooding means flow events that exceed the capacity of the channel and enter the floodplain.
Owner means the owner of the property or lesser estate therein, a mortgagee or vendee in possession, assignee of rents, receiver, executor, trustee, lessee or other person, firm or corporation in control of a property.
Person means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the State, any interstate body or any other legal entity.
Post-development refers to conditions that may reasonably be expected or anticipated to exist after completion of the land development activity on a specific site or tract of land.
Pre-development refers to the conditions that exist at the time that plans for the land development of a tract of land are approved by the plan approving authority. Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.), the existing conditions at the time prior to the first item being approved or permitted shall establish pre-development conditions.
Redevelopment means structural development, creation or addition of impervious surfaces, replacement of impervious surface not part of routine maintenance, and land-disturbing activities associated with structural or impervious development. Redevelopment does not include such activities as exterior remodeling as long as there is no additional impervious surface being added and there is no land-disturbing activity.
Regional stormwater management facility orregional facility means stormwater management facilities designed to control stormwater runoff from multiple projects and/or properties, where the individual properties may assist in the financing of the facility, and the requirement for on-site controls is either eliminated or reduced.
Runoff means stormwater runoff.
Site means the parcel of land being developed, or a designated planning area in which the land development project is located.
Stop-work order means an order issued which requires that construction activity, including, but not limited to, grading activity, building construction, etc., relevant to the subject of the violation on a site be stopped.
Stormwater better site design means nonstructural site design approaches and techniques that can reduce a site's impact on watershed and can provide for nonstructural stormwater management. Stormwater better site design includes conserving and protecting natural areas and greenspace, reducing the impact of the site design, reducing impervious cover and using natural features for stormwater management.
Stormwater management means the collection, conveyance, storage, treatment and disposal of stormwater runoff in a manner to prevent increased flood damage, streambank channel erosion and water quality degradation, and in a manner to enhance and promote the public health, safety and general welfare.
Stormwater management facility means any infrastructure that controls or conveys stormwater runoff.
Stormwater management measure means any stormwater management facility or nonstructural stormwater practice.
Stormwater management plan means a document containing material for describing how existing runoff characteristics will be affected by a land development project and methods for complying with the provisions of this article.
Stormwater retrofit means a stormwater management practice designed for an existing development site that previously had either no stormwater management practice in place or a practice inadequate to meet the stormwater management requirements of the site.
Stormwater runoff or stormwater means flow on the surface of the ground resulting from precipitation.
Structural development means construction, installation or expansion of a building or other structure.
Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff, including, but not limited to, the quantity and quality, the period of release or the velocity of flow.
Subdivision means all divisions of a tract or parcel of land into 2 or more lots, building sites, or other divisions for the purpose, whether immediate or future, of sale, legacy or building development, and includes all division of land involving a new street or a change in existing streets.
History
(Ord. of 12-1-2004, § 2)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.