The Stormwater Management Plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of this article. This plan shall be in accordance with the criteria established in this section and must be submitted with the stamp and signature of a Georgia licensed professional engineer (PE), who will verify that the design of all stormwater management facilities and practices meet the submittal requirements outlined in the submittal checklists found in the stormwater design manual. The stormwater management plan ensures that requirements and criteria in this article are being complied with and that opportunities are being taken to minimize adverse post-development stormwater runoff impacts from the development. The plan shall consist of maps (including, but not necessarily limited to, a color copy of the USGS map of the project area), narrative, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system. The plan shall include all of the information required in the Stormwater Management Site Plan checklist found in the Stormwater Management Design Manual. This includes: (1) Common address and/or map and parcel number and legal description of site. (2) Vicinity map. (3) Existing conditions hydrologic analysis. An existing condition hydrologic analysis for stormwater runoff rates, volumes, and velocities, which includes: a topographic map of existing site conditions with the drainage basin boundaries indicated; total acreage of site; acreage of each drainage area, including off-site drainage; soil types and land cover of areas for each subbasin affected by the project; all perennial and intermittent streams and other surface water features; all existing stormwater conveyances and structural control facilities; direction of flow and exits from the site; analysis of runoff provided by off-site areas upstream of the project site; and methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. (4) Post-development hydrologic analysis. A post-development hydrologic analysis for stormwater runoff rates, volumes, and velocities, which includes: a topographic map of developed site conditions with the post-development drainage basin boundaries indicated; total acreage of site; acreage of each drainage area, including off-site; total area of post-development impervious surfaces and other land cover areas for each subbasin affected by the project; calculations for determining the runoff volumes that need to be addressed to meet the post-development stormwater management performance criteria in division 3 of this article for each subbasin; location and boundaries of proposed natural feature protection and conservation areas; documentation and calculations for any applicable site design credits that are being utilized; methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. (5) Stormwater management system. Description, drawings and design calculations for the proposed post-development stormwater management system, including: A map and/or drawing or sketch of the stormwater management facilities, including the location of nonstructural site design features and the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero to maximum head, location of inlet and outlets, location of bypass and discharge systems, and all orifice/restrictor size; narrative describing that appropriate and effective structural stormwater controls have been selected; cross section and profile drawings and design details for each of the structural stormwater controls in the system, including supporting calculations to show that the facility is designed according to the applicable design criteria; hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms (should include stagestorage or outlet rating curves, and inflow and outflow hydrographs); documentation and supporting calculations to show that the stormwater management system adequately meets the post-development stormwater management performance criteria in division 3 of this article; and drawings, design calculations, elevations and hydraulic grade lines for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales and areas of overland flow. (6) Post-development downstream analysis. Provide the assumptions, results and supporting calculations for a downstream peak flow analysis to show safe passage of post-development design flows downstream. The analysis of downstream conditions in the report shall address each and every point or area along the project site's boundaries at which runoff will exit the property. The analysis shall focus on the portion of the drainage channel or watercourse immediately downstream from the project. This area shall extend downstream from the project to a point in the drainage basin where the project area is 10 percent of the total basin area. In calculating runoff volumes and discharge rates, consideration may need to be given to any planned future upstream land use changes. The analysis shall be in accordance with the Stormwater Management Design Manual. (7) Construction-phase erosion and sedimentation control plan. An erosion and sedimentation control plan in accordance with the Georgia Erosion and Sedimentation Control Act and the Walker County Soil Erosion and Sedimentation Control Ordinance or NPDES Permit for Construction Activities shall be submitted. The plan should also include information on the sequence/phasing of construction and temporary stabilization measures and temporary structures that will be converted into permanent stormwater controls. (8) Landscaping and open space plan. A detailed landscaping and vegetation plan describing the woody and herbaceous vegetation that will be used within and adjacent to stormwater management facilities and practices. The landscaping plan must also include: the arrangement of planted areas, natural and greenspace areas and other landscaped features on the site plan; information necessary to construct the landscaping elements shown on the plan drawings; descriptions and standards for the methods, materials and vegetation that are to be used in the construction; descriptions of the stabilization and management techniques used to establish vegetation; and a description of who will be responsible for ongoing maintenance of vegetation for the stormwater management facility and what practices will be employed to ensure that adequate vegetative cover is preserved. (9) Operations and maintenance plan. Detailed description of ongoing operations and maintenance procedures for stormwater management facilities and practices to ensure their continued function as designed and constructed. These plans will identify the parts or components of a stormwater management facility or practice that need to be regularly or periodically inspected and maintained, and the equipment and skills or training necessary. The plan shall include an inspection and maintenance schedule, maintenance tasks, a list of parties responsible for maintenance, funding, access and safety issues. Provisions for the periodic review and evaluation of the effectiveness of the maintenance program and the need for revisions or additional maintenance procedures shall be included in the plan. (10) Maintenance easements. The applicant must ensure access from public right-of-way to all stormwater management facilities and practices at the site for the purpose of inspection and repair by securing all the 30-foot-wide maintenance easements needed on a permanent basis. Such access shall be sufficient for all necessary equipment for maintenance activities. These easements will be recorded with the plan and will remain in effect even with the transfer of title to the property. (11) Maintenance agreements. The applicant must execute an easement and an inspection and maintenance agreement binding on all subsequent owners of land served by an on-site stormwater management facility or practice in accordance with the specifications of this article. See section 22-730. (12) Evidence of acquisition of applicable local and non-local permits. The applicant shall provide documentation to Walker County that all other applicable environmental permits have been acquired for the site prior to approval of the stormwater management plan.