Every applicant shall provide for on-site post-development stormwater management as required by division 3 of this article unless provisions are made to manage stormwater by an off-site or regional facility. The off-site or regional facility is required to be in place, to be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there is a legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. A stormwater management plan must be submitted to Walker County, which shows the adequacy of the off-site or regional facility. To be eligible for a modification, the applicant must demonstrate to the satisfaction of Walker County that the modification will not result in the following impacts to downstream areas: (1) Increased threat of flood damage to public health, life, and property; (2) Deterioration of existing culverts, bridges, dams, and other structures; (3) Accelerated streambank or streambed erosion or siltation; (4) Degradation of in-stream biological functions or habitat; (5) Water quality impairment in violation of State water quality standards, and/or violation of any State or Federal regulations.