Walker County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 22 - LAND DEVELOPMENT / Article VIII - POST-DEVELOPMENT STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 3 - POST-DEVELOPMENT STORMWATER MANAGEMENT PERFORMANCE CRITERIA
Sec. 22-755. Overbank flooding protection.
About this text
- As published by Municode, current through 2026-07-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the predevelopment rate for the 25-year, 24-hour return frequency storm event. If control of the 1-year, 24-hour storm under section 22-754 is exempted, then peak discharge rate attenuation of the 2-year through the 25-year return frequency storm event must be provided. This requirement may be adjusted or waived by Walker County for sites where all downstream conveyances and receiving waters have the natural capacity to handle the full build-out 25-year storm through a combination of channel capacity and overbank flood storage without causing flood damage. However, the developer must have his design engineer do a study to prove that this is truly the case.
History
(Ord. of 12-1-2004, § 4.3)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.