(a) The applicant must notify Walker County in advance before the commencement of construction or land development activities. Periodic inspections of the stormwater management system construction shall be conducted by the staff of Walker County or certified by a professional engineer or their designee who has been approved by Walker County. All inspections shall be documented and written reports prepared that contain the following information: (1) The date and location of the inspection; (2) Whether construction is in compliance with the approved stormwater management plan; (3) Variations from the approved construction specifications; and (4) Any violations that exist. If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions. No additional work shall proceed until any violations are corrected and all work previously completed has received approval by Walker County. (b) In addition, the person responsible for carrying out the plan may be required to provide inspection monitoring and reports to ensure compliance with the approved plan and to determine whether the measures required in the plan provide effective erosion and sedimentation control and stormwater management.