Walker County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 28 - SOLID WASTE / Article III - SEWER USE REGULATION IN UNINCORPORATED AREAS / Division 5 - PROHIBITIONS AND LIMITATIONS ON DISCHARGES
Sec. 28-180. Affirmative defenses.
About this text
- As published by Municode, current through 2026-07-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Upset.
(1) For the purposes of this section, "upset" means an exceptional incident in which there is unintentional and temporary noncompliance with categorical pretreatment standards because of factors beyond the reasonable control of the industrial user. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.
(2) An upset shall constitute an affirmative defense to an action brought for noncompliance with pretreatment standards if the requirements of subsection (a)(3) of this section are met.
(3) An industrial user who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that:
a. An upset occurred and the industrial user can identify the cause(s) of the upset.
b. The facility was at the time being operated in a prudent and workmanlike manner and in compliance with applicable operation and maintenance procedures.
c. The industrial user has submitted the following information to the POTW and treatment plant operator within 24 hours of becoming aware of the upset (if this information is provided orally, a written submission must be provided within 5 days):
1. A description of the indirect discharge and cause of noncompliance.
2. The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue.
3. Steps being taken and/or planned to reduce, eliminate, and prevent recurrence of the noncompliance.
(4) In any enforcement proceeding, the industrial user seeking to establish the occurrence of an upset shall have the burden of proof.
(5) Industrial users will have the opportunity for a judicial determination on any claim of upset only in an enforcement action brought for noncompliance with categorical pretreatment standards.
(6) The industrial user shall control production or all discharges to the extent necessary to maintain compliance with categorical pretreatment standards upon reduction, loss, or failure of its treatment facility until the facility is restored or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power of the treatment facility is reduced, lost, or fails.
(b) An industrial user shall have an affirmative defense to an enforcement action brought against it for noncompliance with the general and specific prohibitions in division 5 of this article if it can prove that it did not know or have reason to know that its discharge, alone or in conjunction with discharges from other sources, would cause pass-through or interference and that either:
(1) A local limit exists for each pollutant discharged and the industrial user was in compliance with each limit directly prior to, and during, the pass-through or interference, or
(2) No local limit exists, but the discharge did not change substantially in nature or constituents from the user's prior discharge when the Authority was regularly in compliance with its NPDES permit, and in the case of interference, was in compliance with applicable sludge use or disposal requirements.
History
(Ord. No. O-03-22, Exh. A, 11-10-2022)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.