--- title: Walker County Code of Ordinances, Sec. 28-223. Plans and specifications collection: local-codes id: local-code:walker-county/code/28-223 cite_as: Walker County, Ga., Code of Ordinances ยง 28-223 canonical_url: https://georgiacommons.org/counties/walker/code/28-223 md_url: https://georgiacommons.org/counties/walker/code/28-223.md text_url: https://georgiacommons.org/counties/walker/code/28-223/text source_url: https://library.municode.com/ga/walker_county/codes/code_of_ordinances date: 2026-07-09 status: active jurisdiction: county:walker jurisdiction_name: Walker County county_fips: "13295" corpus_version: local-codes-walker-county-34d5670eb847 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/walker/code/~part-ii/~chapter-28/~article-iii/~division-6.md previous: https://georgiacommons.org/counties/walker/code/28-222.md next: https://georgiacommons.org/counties/walker/code/28-224.md index: https://georgiacommons.org/counties/walker.md branch: code edition: As published by Municode, current through 2026-07-09 edition_date_kind: current_through source_publisher: Municode version_id: local-code:walker-county/code/28-223@2026-07-09-b028bb4e18 --- # Walker County Code of Ordinances, Sec. 28-223. Plans and specifications > As published by Municode, current through 2026-07-09 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 28 - SOLID WASTE / Article III - SEWER USE REGULATION IN UNINCORPORATED AREAS / Division 6 - CONTROL OF PROHIBITED POLLUTANTS (a) Plans and specifications for wastewater monitoring and pretreatment facilities shall be prepared, signed, dated, and sealed by a registered engineer, and be submitted to the Authority for review in accordance with accepted engineering practices. The Authority shall review the plans within 45 days of receipt and recommend to the industrial user any appropriate changes. Prior to beginning construction of a monitoring or pretreatment facility, the user shall submit a set of construction plans and specifications to be maintained by the Authority. Prior to beginning construction, the industrial user shall also secure building, plumbing, and all other required permits. (b) The industrial user shall construct the pretreatment facility within the time provided in the industrial user's wastewater discharge permit. Following completion of construction, the industrial user shall provide the Authority with as-built drawings to be maintained by the Authority. The review of such plans and specifications will in no way relieve the user from the responsibility of modifying the facilities as necessary to produce an effluent complying with the provisions of this division. Any subsequent changes in the pretreatment facilities or methods of operations shall be reported to and be approved by the Authority prior to implementation. ## History (Ord. No. O-03-22, Exh. A, 11-10-2022)