(a) The permit application required by section 28-255 shall contain the following information: (1) Identifying information. The name and address of the facility including the name of the operator and owners and contact information. (2) Environmental permits. A list of any environmental control wastewater discharge permits held by or for the facility. (3) Description of operations. a. A brief description of the nature, average rate of production, and SIC codes of the operation(s) carried out by such industrial user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes. b. The types of wastes generated and a list of chemicals used and materials stored at the facility which could be accidentally discharged to the POTW. c. Number of employees, hours of operation, and actual or proposed hours of discharge to the POTW. d. Type and amount of raw materials processed (average and maximum per day), and type and amount of products produced (rate of production). e. Site plans, floor plans, and plumbing plans to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge. (4) Proposed location for monitoring for all wastes covered by the permit. (5) Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 CFR, Part 403.6(e). (6) Measurement of pollutants. a. Identify the categorical pretreatment standards applicable to each regulated process. b. Submit the results of sampling and analysis identifying the nature and concentration (and/or mass, where required by the standard or by the Authority) of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum and long-term average concentrations (or mass, where required) shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in section 28-297. Where a pretreatment standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the Authority or applicable standard. c. Sampling must be performed in accordance with procedures set out in section 28-297. (7) Proposed pretreatment systems or equipment and/or operation and maintenance procedures necessary to meet applicable pretreatment standards and requirements. (8) Any request for a monitoring waiver for a pollutant neither present nor expected to be present in the discharge. (9) Any other information as may be deemed necessary by the Authority to evaluate the permit application. (b) All permit applications must be signed and certified in accordance with section 28-303.