--- title: Walker County Code of Ordinances, Sec. 28-295. Reports collection: local-codes id: local-code:walker-county/code/28-295 cite_as: Walker County, Ga., Code of Ordinances § 28-295 canonical_url: https://georgiacommons.org/counties/walker/code/28-295 md_url: https://georgiacommons.org/counties/walker/code/28-295.md text_url: https://georgiacommons.org/counties/walker/code/28-295/text source_url: https://library.municode.com/ga/walker_county/codes/code_of_ordinances date: 2026-07-09 status: active jurisdiction: county:walker jurisdiction_name: Walker County county_fips: "13295" corpus_version: local-codes-walker-county-34d5670eb847 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/walker/code/~part-ii/~chapter-28/~article-iii/~division-8.md previous: https://georgiacommons.org/counties/walker/code/28-294.md next: https://georgiacommons.org/counties/walker/code/28-296.md index: https://georgiacommons.org/counties/walker.md branch: code edition: As published by Municode, current through 2026-07-09 edition_date_kind: current_through source_publisher: Municode version_id: local-code:walker-county/code/28-295@2026-07-09-62bf1571d9 --- # Walker County Code of Ordinances, Sec. 28-295. Reports > As published by Municode, current through 2026-07-09 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 28 - SOLID WASTE / Article III - SEWER USE REGULATION IN UNINCORPORATED AREAS / Division 8 - INSPECTIONS, MONITORING, AND RECORDS (a) Baseline monitoring reports. Within either 180 days after the effective date of a categorical pretreatment standard or the final administrative decision on a category determination under 40 CFR, Part 403.6(a)(4), whichever is later, existing significant industrial users subject to such categorical pretreatment standards, and currently discharging to or scheduled to discharge to the POTW shall be required to submit to the Authority a report which contains the information listed in the following subsections (a)(1) through (4) of this section. At least 90 days prior to commencement of their discharge, new sources and sources that become industrial users subsequent to the promulgation of an applicable categorical standard shall be required to submit to the Authority a report which contains the following information: (1) All information required by subsections 28-256(a)(1), (2), (3)a, and (5). (2) Information required by subsection 28-256(a)(6), based on a representative sample obtained immediately downstream from pretreatment facilities if such exist, or immediately downstream of the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment, the user should measure the flows and concentrations necessary to apply the combined waste stream formula. Sampling shall be performed in accordance with section 28-297. The report shall indicate the time, date, place of sampling, and methods of analysis and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the POTW. When an alternate concentration or mass limit has been calculated, this limit along with supporting data shall be included. (3) Compliance certification. A statement that has been reviewed by an authorized representative of the industrial user and certified by a professional engineer indicating if pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance procedures or additional pretreatment is required for the industrial user to meet the pretreatment standards and requirements. (4) Compliance schedule. If additional pretreatment and/or operation and maintenance procedures will be required to meet the pretreatment standards, the report shall contain the shortest schedule by which the industrial user will provide the additional pretreatment. The completion date in this schedule shall be no later than the compliance date established for the applicable pretreatment standard. If a pretreatment standard has been modified or adjusted, the information in subsections (a)(3) and (4) of this section shall apply to the modified or adjusted limits. (b) Compliance schedule progress reports. No later than 14 days following each date in the schedule and the final date for compliance, the industrial user shall submit a progress report to the Authority, including, as a minimum, whether it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for the delay, and steps being taken by the industrial user to return the construction to the schedule established. In no event shall more than 9 months elapse between such progress reports to the Authority. (c) 90-day compliance report. Within 90 days following the date for final compliance with applicable pretreatment standards or, in the case of a new source, following commencement of the introduction of wastewater into the POTW, any industrial user subject to categorical pretreatment standards and requirements shall submit to the Authority a report containing the information described in subsections 28-256(a)(5) and (6) and subsections (a)(3) and (4) of this section. (d) Periodic compliance. (1) All significant industrial users shall submit to the Authority once between the months of February—July and August—January, unless required more frequently in the pretreatment standard or by the Authority, a report indicating the nature and concentration of pollutants in the effluent which are limited by their permit. In addition, this report shall include a record of average and maximum daily flows. At the discretion of the Authority and in consideration of such factors as local high or low flow rates, holidays, budget cycles, etc., the Authority may agree to alter the months during which the above reports are to be submitted. In cases where the pretreatment standard requires compliance with a BMP or pollution prevention alternative, the user must submit documentation necessary to determine the compliance status of the user. (2) The Authority, as applicable, may impose mass limitations on industrial users employing dilution to meet applicable pretreatment standards or requirements or in other cases where the imposition of mass limitations is appropriate. In cases where the Authority or a pretreatment standard has imposed mass limitations, the report required by subsection (a) of this section shall indicate the mass of pollutants regulated by pretreatment standards in the effluent of the industrial user. (e) The reports required in this section shall contain the results of sampling and analysis of the discharge, including the flow and the nature and concentration or production rates and mass limits where requested by the Authority, as applicable, of pollutants contained therein which are limited by the applicable pretreatment standards or industrial permit. For industrial users subject to equivalent mass or concentration limits established by the Authority as alternative standards, the report shall contain a reasonable measure of the user's long-term production rate. For all other industrial users subject to categorical pretreatment standards expressed only in terms of allowable pollutant discharge per unit of production (or other measure of operation), the report shall include the user's actual average production rate for the reporting period. The frequency of monitoring shall be prescribed in the applicable treatment standard or permit. (f) The Authority may authorize an industrial user subject to a categorical pretreatment standard to forego sampling of a pollutant regulated by a categorical pretreatment standard if the industrial user has demonstrated through sampling and other technical factors that the pollutant is neither present nor expected to be present in the discharge, or is present only at background levels from intake water and without any increase in the pollutant due to activities of the industrial user. This authorization is subject to the following conditions: (1) The waiver may be authorized where a pollutant is determined to be present solely due to sanitary wastewater discharged from the facility, provided that the sanitary wastewater is not regulated by an applicable categorical standard and otherwise includes no process water. (2) The monitoring waiver is valid only for the duration of the effective period of the individual wastewater discharge permit, but in no case longer than 5 years. The user must submit a new request for the waiver before the waiver can be granted for a subsequent individual wastewater discharge permit. (3) In demonstrating that a pollutant is not present, the industrial user must provide data from at least 1 sampling of the facility's process wastewater prior to any treatment present at the facility that is representative of all wastewater from all processes. (4) The request for a monitoring waiver must be signed in accordance with section 28-303 and must include the certification statement in section 28-312. (5) Nondetectable sample results may be used only as a demonstration that a pollutant is not present if the EPA-approved method from 40 CFR Part 136 with the lowest minimum detection level for that pollutant was used in the analysis. (6) Any grant of the monitoring waiver by the Authority must be included as a condition in the user's permit. The reasons supporting the waiver and any information submitted by the user in its request for the waiver must be maintained by the Authority for 3 years after expiration of the waiver. (7) Upon approval of the monitoring waiver and the revision of the user's permit by the Authority, the industrial user must certify each report with the statement in section 28-312, that there has been no increase in the pollutant in its waste stream due to activities of the industrial user. (8) In the event a waived pollutant is found to be present or is expected to be present because of changes that occur in the user's operations, the user must immediately notify the Authority and comply with the monitoring requirements of subsection (d) of this section, or other more frequent monitoring requirements imposed by the Authority. (9) This provision does not supersede certification processes and requirements established in categorical pretreatment standards, except as otherwise specified in the categorical pretreatment standard. (g) Reporting requirements for industrial users not subject to categorical pretreatment standards. Significant noncategorical industrial users must submit to the Authority at least once every 6 months (on dates specified by the Authority) a description of the nature, concentration, and flow of pollutants required to be reported by the user's wastewater discharge permit. In cases where the permit requires compliance with a BMP or pollution prevention alternative, the user must submit documentation required by the Authority to determine the compliance status of the user. These reports must be based on sampling and analysis in the period covered by the report and in accordance with the techniques described in 40 CFR Part 136. (h) All monitoring and compliance reports must be signed and certified in accordance with section 28-303. ## History (Ord. No. O-03-22, Exh. A, 11-10-2022)