Skip to content
Georgia Commons
Menu

Walker County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 28 - SOLID WASTE / Article III - SEWER USE REGULATION IN UNINCORPORATED AREAS / Division 8 - INSPECTIONS, MONITORING, AND RECORDS

Sec. 28-297. Sampling and analysis.

About this text

  • As published by Municode, current through 2026-07-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) All collected samples must be of such nature that they provide a true and accurate representation of the industry's normal workday effluent quality.

(b) Chain-of-custody procedures, sample preservation techniques, and sample holding times recommended by EPA shall be followed in all self-monitoring activities.

(c) Monitoring shall be performed at the approved monitoring station on the effluent sewer. Location and design of the monitoring station shall be subject to the review and approval of the Authority. Any change in monitoring location will be subject to the approval of the Authority.

(d) All analyses shall be performed in accordance with procedures established by EPA under the provisions of section 304(h) of the Act [33 U.S.C. 1314(h)] and contained in 40 C.F.R. Part 136 and amendments thereto or with any other test procedures approved by EPA or the Authority. Sampling shall be performed in accordance with the techniques approved by EPA or the Authority.

(e) Except as indicated in subsections (f) and (g) of this section, the user must collect wastewater samples using 24-hour flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the Authority. Where time-proportional composite sampling or grab sampling is authorized, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to analysis as follows: for cyanide, total phenols, and sulfides, the samples may be composited in a laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the Authority, as appropriate.

In addition, grab samples may be required to show compliance with instantaneous limits.

(f) Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. Alternately, pH compliance may be assessed through the use of a strip-chart or a circular chart over the monitoring period from a continuous pH recorder, at the discretion of the Authority.

(g) For sampling required in support of baseline monitoring and 90-day compliance reports required in section 28-295(a) and (c) and 40 CFR 503.12(b) and (d), a minimum of 4 grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfides, and volatile organic compounds for facilities for which historical sampling data do not exist. For facilities for which historical sampling data are available, the Authority may authorize a lower minimum. For reports required by subsection 28-295(d) and 40 CFR 403.12(e) and (h), the Authority will specify the number of grab samples the industrial user is required to collect in order to assess and assure compliance with applicable pretreatment standards.

(h) The Authority shall inspect and sample the effluent from each significant industrial user at least once every 12 months, except where the Authority has authorized an industrial user subject to a categorical pretreatment standard to forego sampling of a pollutant regulated by a categorical standard, the Authority must sample for the waived pollutant at least once during the term of the user's permit or control mechanism. In the event that the Authority determines that a waived pollutant is present in the industrial user's discharge or is expected to be present due to changes in the facility's operations, the Authority must begin effluent monitoring of the user's discharge and inspections of the facility at least once every 12 months.

History

The history line the source prints at the end of the section.

(Ord. No. O-03-22, Exh. A, 11-10-2022)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:walker-county/code/28-297@2026-07-09-0836dd3ebb

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Walker County Code of Ordinances, Sec. 28-297. Sampling and analysis | Georgia Commons