--- title: Walker County Code of Ordinances, Sec. 8-91. Discarded building materials and construction waste disposal requirements collection: local-codes id: local-code:walker-county/code/8-91 cite_as: Walker County, Ga., Code of Ordinances ยง 8-91 canonical_url: https://georgiacommons.org/counties/walker/code/8-91 md_url: https://georgiacommons.org/counties/walker/code/8-91.md text_url: https://georgiacommons.org/counties/walker/code/8-91/text source_url: https://library.municode.com/ga/walker_county/codes/code_of_ordinances date: 2026-07-09 status: active jurisdiction: county:walker jurisdiction_name: Walker County county_fips: "13295" corpus_version: local-codes-walker-county-34d5670eb847 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/walker/code/~part-ii/~chapter-8/~article-iii.md previous: https://georgiacommons.org/counties/walker/code/8-67-to-8-90.md next: https://georgiacommons.org/counties/walker/code/8-92.md index: https://georgiacommons.org/counties/walker.md branch: code edition: As published by Municode, current through 2026-07-09 edition_date_kind: current_through source_publisher: Municode version_id: local-code:walker-county/code/8-91@2026-07-09-eed7cf31f9 --- # Walker County Code of Ordinances, Sec. 8-91. Discarded building materials and construction waste disposal requirements > As published by Municode, current through 2026-07-09 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 8 - BUILDINGS AND BUILDING REGULATIONS / Article III - CONSTRUCTION AND WASTE MANAGEMENT (a) Building materials, concrete washout, paint washout, litter, sanitary waste, and other construction site wastes must be properly managed and disposed of to reduce the risk of pollution from materials such as surplus or refuse building materials or hazardous wastes. (b) Practices such as trash disposal, recycling, proper material handling, and spill prevention and clean up measures must be implemented to reduce the potential for stormwater runoff to mobilize construction site wastes and contaminate surface water or groundwater. (c) The proper management and disposal of wastes should be practiced at all construction sites to reduce stormwater runoff. (1) Waste management practices must be used to properly locate refuse piles. (2) Covered materials that may be displaced by rainfall or stormwater runoff. (3) All spills and leaks of hazardous wastes must be prevented. (d) Guidelines for proper handling, storage, and disposal of construction site wastes must be posted in storage and use areas on site. ## History (Ord. of 12-7-2006)