Owners and developers shall do the following at all times at construction sites: (1) Designate a waste collection area on site that does not receive a substantial amount of runoff from upland areas and does not drain directly to a water body. (2) Designate areas for concrete trucks and equipment to wash down that will not flow into storm drains or become surface water runoff that would lead to the storm drains. Under no circumstances should concrete wash out be conducted in the road or directly into storm drains. (3) Designate areas for paint cans and equipment to wash down that will not flow into storm drains or become surface water runoff that would lead to the storm drains or groundwater recharge areas. Under no circumstances should excess paint be washed out in the road or directly into storm drains. (4) Ensure that containers have lids so they can be covered before periods of rain. Keep containers in a covered area whenever possible. (5) Schedule waste collection to prevent containers from overfilling, which would prevent them from being able to be covered. (6) Clean up spills immediately. For hazardous materials, follow cleanup instructions on the package. Use an absorbent material such as sawdust or kitty litter to contain the spill. a. During the demolition phase of construction, provide extra containers and schedule more frequent pick-ups. b. Collect, remove, and dispose of all construction site waste at authorized disposal areas.