--- title: Ware County Code of Ordinances, Sec. 18-49. Inspections collection: local-codes id: local-code:ware-county/code/18-49 cite_as: Ware County, Ga., Code of Ordinances § 18-49 canonical_url: https://georgiacommons.org/counties/ware/code/18-49 md_url: https://georgiacommons.org/counties/ware/code/18-49.md text_url: https://georgiacommons.org/counties/ware/code/18-49/text source_url: https://library.municode.com/ga/ware_county/codes/code_of_ordinances date: 2025-12-08 status: active jurisdiction: county:ware jurisdiction_name: Ware County county_fips: "13299" corpus_version: local-codes-ware-county-be2d67e245da publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/ware/code/~part-ii/~chapter-18/~article-iii.md previous: https://georgiacommons.org/counties/ware/code/18-48.md next: https://georgiacommons.org/counties/ware/code/18-50.md index: https://georgiacommons.org/counties/ware.md branch: code edition: As published by Municode, current through 2025-12-08 edition_date_kind: current_through source_publisher: Municode version_id: local-code:ware-county/code/18-49@2025-12-08-01e4cf3c17 --- # Ware County Code of Ordinances, Sec. 18-49. Inspections > As published by Municode, current through 2025-12-08 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article III - UNSAFE BUILDINGS (a) Generally. The building official shall inspect or cause to be inspected any unoccupied building, structure or portion thereof which is or may be unsafe. (b) Building and mobile home vacancy permits and inspections required. The owner/renter shall be required to obtain an electrical permit and an existing onsite sewer disposal system (septic tank) inspections for any building or mobile home that has not had power supplied to the building or mobile home for a period of six months or more before the power can be supplied to the mobile home or building. Once the septic tank inspection has been completed and the owner/renter has obtained the electric permit, the Ware County Planning and Codes Department shall, at the owner's request, schedule an inspection of the existing electrical conditions of the mobile home or building. (c) Action required. After the building official has inspected or caused to be inspected such a building, structure or portion thereof and has determined that such building, structure or portion thereof is unsafe and is vacant, he shall initiate proceedings to cause the abatement of the unsafe condition by repair or demolition or combination thereof. ## History (Code 1983, § 2-4-53)