Skip to content
Georgia Commons
Menu

Ware County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 67 - SUBDIVISION REGULATIONS

Sec. 67-4. Procedure.

About this text

  • As published by Municode, current through 2025-12-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Approval for the subdivision of land may be obtained from the Waycross-Ware County Planning Commission by proceeding through these three steps.

Step 1. An accurate survey of the property to be subdivided, plus all of the surrounding area to a distance of 100 feet, shall be made by a registered land surveyor. This survey should include all the land which the owner intends to subdivide in the foreseeable future.

Prepare a reproducible drawing of the survey and make at least two white prints. The survey shall show the first 13 items of those required on a preliminary plat (see section 67-5(a)(2)). Add onto the two prints (to scale and in pencil) all additional required items to indicate how the owner would like to subdivide his land. Call the planning director for the Waycross-Ware County Planning Commission (hereinafter called the planning commission) to arrange a preliminary discussion and take the two prints to the meeting.

After the conference, the planning director shall make an investigation and arrange a second meeting, during which agreement shall be reached on how the preliminary plat is to be prepared. This will complete Step 1. Between Step 1 and Step 2, the developer should consult with the Ware County Health Department as well as each public and private utility to be involved in the proposed development. Preparations should be pursued for a registered surveyor or engineer, landscape architect or soil scientist to prepare a soil erosion sedimentation control plan and stormwater drainage plan to be submitted with preliminary plat to the planning director.

Step 2. Prepare a preliminary plat, as previously agreed upon, to the specifications described hereinafter and including all required items. Transmit the white prints of the completed drawing to the planning director. If the plat is acceptable and is submitted at least ten days before a regular meeting of the planning commission with a soil erosion and sedimentation control plan and a stormwater drainage plan, the plat shall be placed on the agenda of that meeting for a consideration. Plats received less than ten days before a regular meeting of the planning commission may be carried over to the next succeeding meeting. At the conclusion of the regular meeting, the planning commission shall either approve (fully or conditionally) or disapprove the preliminary plat as submitted. Approval of the preliminary plat completes Step 2.

Step 3. Prepare a final plat to the specifications described hereinafter and including all required items. It is not required that the final plat shall include all the area of the preliminary plat. The final plat may include only that portion of the subdivision which is needed in the immediate future. Additional portions may be submitted subsequently.

Transmit the original tracing and two white prints of the final plat to the planning director. If the plat is acceptable and is submitted at least ten days before a regular meeting of the planning commission with approvals of the soil erosion and sedimentation control plan and stormwater drainage plan, the plat shall be placed on the agenda of that meeting. All street, drainage and utilities improvements required to serve the proposed subdivision shall have been completed prior to approval of the final plat. Approval of the final plat by the planning commission shall not constitute acceptance by the county of the dedication of any streets or other public grounds. Upon approval of the final plat, the secretary of the planning commission shall submit the plat to the county commission for action upon the offers of dedication. When the dedications have been accepted, the secretary shall then file the final plat in the office of the clerk of the superior court as prescribed by law.

Before the final plat is filed, however, a reproducible positive shall be made from the original signed tracing and transmitted to the planning director. A computer disc record of the approved final plat shall be submitted to the planning director. This completes the subdivision process.

History

The history line the source prints at the end of the section.

(Res. of 10-11-2016, § IV)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:ware-county/code/67-4@2025-12-08-55ec91f09d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.