Utility driveways for accesses to utility sites such as power substations, water tanks, or telephone services sites are to be permitted by the county and should be treated much the same as a residential driveway for design and sight distance. The utility driveway must function in such a manner, which will allow the utility vehicle to pull completely off the roadway without stopping and backing into the drive or having to back out into roadway when exiting the driveway. The vehicle must not reduce the site distance for driveway located along the same section of roadway. A utility driveway will normally not count as one allowed access point along an applicant's frontage, depending on the length of frontage and safety considerations. A typical utility driveway layout is available from the county. The county will administer the issuance of permits and accompanying fee as set from time to time by the board of county commissioners. Relocation of an existing driveway by county, state, and federal entities, within the ROW will not require issuance of a permit.