(a) Construction methods are to be in accordance with the GDOT's Standard Specifications, current edition. Unsatisfactory restoration work shall be promptly corrected by the permit applicant. If necessary, unsatisfactory restoration work will be corrected by the county and its cost billed to the permit applicant. (b) Drainage. Care must be taken in utility installations to avoid disturbing existing drainage facilities. (c) Vegetative management on the ROW. Cutting and trimming of trees and shrubs growing on the highway ROW shall be held to the minimum required for installation and preservation of utilities. Generally, the maximum amount of clearance allowed for the utility is ten feet. Bush hogging will be allowed in areas where it is done on a frequent enough basis to avoid unsightly cuttings.