Whenever open trenching is required for the installation or maintenance of utilities within the ROW, the work shall be so scheduled that not more than 500 feet of trench shall be open at any one time. More restrictive controls may be imposed where conditions warrant. Insofar as possible work shall be scheduled so that open excavations will not be left overnight. Where trenches or pits are within the clear roadside areas and cannot be backfilled before leaving the job site, they shall be cordoned off and protected by reflectorized or lighted barricades as appropriate, or by other safety means as deemed appropriate.