Washington County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 26 - PUBLIC PROPERTIES / Article III - TIMBER OPERATIONS
Sec. 26-225. Ingress and egress route.
About this text
- As published by Municode, current through 2026-07-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) All trucks shall utilize the prescribed ingress and egress route as specified in the permit.
Such route shall be used whether trucks are loaded or unloaded, and whether coming to or leaving the harvest site/timber operation location. The permit holder must advise all truck drivers of the prescribed route. It is the responsibility of the permit holder that all truck drivers comply with this route.
(b) The prescribed route shall direct all trucks from the site to the nearest state road or county truck route. Such trucks shall then stay on state roads or county truck route until exiting the county.
§ 26-224
(c) No non-truck routes or county roads shall be utilized to cut off travel distance, or to digress from a state road or from the prescribed route outlined in the permit.
(d) If circumstances such as road work, bridge load requirements, heavily congested or populated areas, or other circumstances arise, the director of public works may designate a different route as appropriate to accommodate such circumstances.
(e) Any request for a special route, other than as prescribed, must be discussed with and approved by the director of public works prior to the application for a permit.
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.