--- title: Washington County Code of Ordinances, Sec. 8-194. Application for permit, fee, and revocation of permit collection: local-codes id: local-code:washington-county/code/8-194 cite_as: Washington County, Ga., Code of Ordinances ยง 8-194 canonical_url: https://georgiacommons.org/counties/washington/code/8-194 md_url: https://georgiacommons.org/counties/washington/code/8-194.md text_url: https://georgiacommons.org/counties/washington/code/8-194/text source_url: https://library.municode.com/ga/washington_county/codes/code_of_ordinances date: 2026-07-09 status: active jurisdiction: county:washington jurisdiction_name: Washington County county_fips: "13303" corpus_version: local-codes-washington-county-49d4ea71c96a publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/washington/code/~part-ii/~chapter-8/~article-v/~division-2.md previous: https://georgiacommons.org/counties/washington/code/8-193.md next: https://georgiacommons.org/counties/washington/code/8-195.md index: https://georgiacommons.org/counties/washington.md branch: code edition: As published by Municode, current through 2026-07-09 edition_date_kind: current_through source_publisher: Municode version_id: local-code:washington-county/code/8-194@2026-07-09-f47b724c0d --- # Washington County Code of Ordinances, Sec. 8-194. Application for permit, fee, and revocation of permit > As published by Municode, current through 2026-07-09 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 8 - BUILDINGS AND DEVELOPMENT / Article V - SOLAR FARM DEVELOPMENTS / Division 2 - SOLAR FARMS (a) Before commencing operations, all solar farms shall submit an application for a solar farm permit on the form prescribed by the Washington County Code Enforcement Department and shall provide proof of compliance with all standards for solar farms outlined in this article. No solar farm shall commence operations until it has been inspected by the Washington County Code Enforcement Office and obtained the permit required by this section. The county shall be entitled to charge a $20.00/acre permitting fee to be paid in advance. (b) An application for a solar farm permit shall be accompanied by a comprehensive site plan for the solar farm, which shall include, but not be limited to: (1) Drawings prepared by a professional engineer licensed to practice in Georgia that clearly illustrate the design of the solar farm; (2) A project summary; (3) General procedures for operation and maintenance of the installation; (4) Measures for maintaining safe access to the installation; (5) Electrical schematics; (6) Soil erosion, sediment control and delineation of all rivers, streams or wetlands; (7) Landscape plans; (8) Temporary or permanent roads or driveways; (9) Grading; (10) Vegetation clearing and planting and mitigation or screening with vegetation, structures, or fences; (11) Exterior lighting and any screening; (12) Name and address of the applicant or its authorized agent; (13) Boundaries, exact dimensions and acreage of the tax parcel(s) to be built upon; (14) Identification of the owners of all adjacent tax parcels; (15) Location and dimensions of the solar farm; (16) Existing and proposed locations and dimensions of any utility lines, easements, drainage ways and public or private rights-of-way; and (17) Buildings and the locations of alt structures, existing and proposed. (c) The applicant shall provide additional copies of the comprehensive site plan to the Washington County Sheriffs Office, Fire Department, and Emergency Management Agency. The comprehensive site plan must be approved in writing by the Washington County Code Enforcement Office before a solar farm may receive a permit or commence operations. (d) An application for a solar farm permit shall be accompanied by a decommissioning and restoration plan, as outlined in section 8-195 below. (e) At the time of application, each applicant shall pay a non-refundable permit fee in the amount established by the Washington County Commissioner's Office. (f) A permit may be revoked by the Washington County Code Enforcement Office for any solar farm which is not in full compliance with this article. Prior to revoking the permit, the Washington County Code Enforcement Office shall provide three calendar days' written notice of any deficiencies to the solar farm owner or operator via U.S. Mail, overnight delivery, or hand delivery. If the deficiencies are not corrected within those three days, the Washington County Code Enforcement Office may revoke the solar farm's permit and require the solar farm to submit a new application before recommencing operations. During the time that a solar farm permit is revoked, the solar farm shall post a sign at each entrance to the solar farm no smaller than one foot by two feet stating: "This solar farm's operations have ceased due to noncompliance with the Washington County Code of Ordinances. For more information, contact the Washington County Code Enforcement Office." ## History (Ord. No. 2025-03, 9-11-2025) ## Meetings that refer to this section Found 1: meetings of this government whose minutes or machine transcripts name this section, or an ordinance in its history line, newest first. Found by rule from those records' own words. A reference is a pointer to another record, not a statement that the section applies or was changed. - 2025-09-11: [Washington County Board of Commissioners regular meeting minutes, September 11, 2025](https://georgiacommons.org/counties/washington/meetings/washington-county-board-of-commissioners/2025-09-11.md) (minutes) names an ordinance in this section's history: "Ordinance 2025-03"