Skip to content
Georgia Commons
Menu

Wayne County · Code of Ordinances

Wayne County Code of Ordinances

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, current through 2025-08-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Part 4 of 4. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

(11) ROW* (polygon): all existing and new road and drainage right-of-way areas, located either inside or adjacent to the subdivision (see Figure G).

(12) ROW ANNO - (annotation): all existing and new street names and right-of-way widths.

(13) SUBDIV* (polygon): subdivision boundary areas (see Figure H).

(14) SURVEY ANNO - (annotation): all survey data (bearings, distances, curve data, tie lines, etc.).

(15) WETLAND* (polygon): all existing delineated wetland areas either inside or adjacent to the subdivision (see Figure I).

*Note: In AutoCAD, island areas such as the one created by the example right-of-way in Figure G would be created by three or more polylines. Multiple polylines do not translate to one polygon in ArcGIS. In order to create a correct polygon of the right-of-way, it is necessary to make an AutoCAD block of all the associated right-of-way polylines. Any deviation from these standards will have to have prior approval from the county/city engineer or his appointee.

(Ord. of 3-1-2021(1)) Secs. 32-112—32-136. Reserved.

ARTICLE VI. REQUIRED IMPROVEMENTS

Sec. 32-137. Required improvements.

(a) Subdivider provision prior to final plat approval. A well-designed subdivision means little to a prospective lot buyer until such buyer can see actual physical transformation of raw land into lots with all necessary improvements provided. Likewise, a well-designed subdivision is not an asset to the community until the necessary improvements have been installed. In order that prospective lot purchasers may get useable products and new subdivisions may be an asset rather than a liability to the community, the subdivider shall install and/or pay for the improvements required by these regulations necessary to serve the subdivision prior to the approval of the final plat.

(b) Water supply. When a required water system is installed, water mains shall provide a minimum flow of water of 500 gallons per minute for four minutes or 250 gallons per minute for two hours at the furthermost point from the tank. Fire hydrants shall be provided at distances not greater than 1,000 feet apart. The water main may be located in the right-of-way, but may not be located under the pavement.

Water lines three-fourths-inch in size shall be stubbed-out to the property line to serve each lot before the street is surfaced. When connection to a county water system is not available, the governing authority may make an exception to this rule. The water system shall be a permitted community water system as required by the State of Georgia Safe Water Drinking Act.

An approved, signed copy from the EPD (environmental protection division) of the water system plans must be submitted prior to final plat approval. Well sites should be of sufficient size to accommodate and adequately maintain the well and storage tank provided. However, the well shall be located no closer than 50 feet to any exterior property line of the subdivision.

(c) Sanitary sewage. If a sanitary sewer is installed in a subdivision, sanitary sewers shall be installed to the plans and specifications approved by and in accordance with the rules and administrative regulations of the county health department. When the sewer line is located in a street right-of-way and it will be necessary to cut into the street surface to serve the abutting lots, a connection shall be stubbed-out to the property line to serve each lot prior to surfacing the street.

(d) Sewage disposal systems. Prior to the construction of any community sewage disposal system, such as a private septic tank, an oxidation pond or other facility, the location, size, plans and specifications of such a facility shall be approved by and be in accordance with the rules and administrative regulations of the governing authority and the county health department.

(e) Curbs and gutters. If concrete curbs or paved valley-type gutters are required, they shall be installed in accordance with plans and specifications prepared by an engineer, registered surveyor or architect, and approved by the county engineer or the local governing authority, or its designee.

(f) Street grading and surfacing. Street grading, base preparation, and surfacing shall be carried out by the subdivider according to plans and specifications approved by the county and the state department of transportation.

(g) Storm drainage. An adequate drainage system, including necessary open ditches, pipes, culverts, storm sewers, intersectional drains, drop inlets, bridges and other necessary appurtenances shall be installed by the subdivider according to plans and specifications approved by the county engineer.

(h) Street name signs. Street name signs shall be installed at all intersections within a subdivision. The location and design shall be approved by the governing authority or its designee.

(i) Topsoil. Topsoil shall not be removed from residential lots or used as spoil, but shall be redistributed so as to provide at least six inches of cover on the lots and at least four inches of cover between sidewalks and curbs, and shall be stabilized by seeding or planting.

(j) Paving. In all subdivisions, regardless of size, paving shall be required for all streets.

(k) Subdivision entrances. The building inspector shall coordinate with the county engineer with respect to entrances, driveways, or "curb cuts." Design standards on county or state roads shall be consistent with all state, federal, and local laws and applicable ordinances, including the state department of transportation rules and all amendments or revisions in effect as of the date of the preliminary plat approval. Safety as well as, available alternatives for reducing the number of entrances, driveways or "curb cuts" will be considered.

(Ord. of 3-1-2021(1)) Sec. 32-138. Final plat revisions.

If it should become necessary to revise a final plat due to a dimensional error, a revised plat shall be submitted to the county clerk of the court for final recording after the chairperson of commissioners has approved and signed the revised plat.

(Ord. of 3-1-2021(1)) Sec. 32-139. Acceptance of streets by the county.

The county shall not accept title without performance bond. Performance bonds shall comply with all statutory requirements and shall be satisfactory to the county attorney as to form, sufficiency and manner of execution as set forth in these regulations. Such bonds shall be approved by the county commission as to amount and surety and other conditions deemed satisfactory to the county commission and/or that the posted performance bond is an amount sufficient to guarantee the required improvements. The county may at any time during the period of such bond accept a substitution of principal or sureties on the bond upon recommendation of the county engineer, environmental quality director and county attorney.

(Ord. of 3-1-2021(1)) Sec. 32-140. Access.

The county commissioners shall not approve a subdivision in a location where the existing roads providing primary access are inadequate to serve the additional traffic generated by the development. If the ditches on existing county roads are to be used for drainage from the subdivision, the developer will regrade said ditches and provide an all-weather drainage outlet. All regrading and drainage outlets shall be approved by the governing authority or its authorized representatives.

(Ord. of 3-1-2021(1)) Secs. 32-141—32-163. Reserved.

ARTICLE VII. DESIGN STANDARDS

Sec. 32-164. Scope.

The design standards shall conform to the minimum requirements of the county ordinance and to the road construction typical sections, attached hereto and made a part of this article.

(Ord. of 3-1-2021(1)) Sec. 32-165. Streets.

(a) Conformity to current specifications. Streets shall conform to current county road construction and maintenance specifications.

(1) Sub-grade shall be compacted to 100 percent of the laboratory maximum dry density. Performance test results must be furnished by a county-approved test lab at any time requested by the county.

(2) Graded aggregate base should meet section 310 of the state department of transportation specifications and be no less than six inches in depth. It shall be compacted to 100 percent of the maximum dry density.

(3) Soil cement base should meet section 301 of the state department of transportation specifications. It should be compacted to 98 percent of the maximum dry density.

(4) All base courses shall be primed in accordance with section 412 of the state department of transportation specifications.

(5) Asphaltic concrete surface mixtures must be an F-mix or 9.5 mm mix, and satisfy requirements of section 400 of the state department of transportation specifications.

(6) A job mix formula for asphaltic concrete should be submitted to the county at least two weeks prior to paving. Minimum thickness shall be 1½ inches (approximately 165 pounds per square yard).

(7) All base material should extend not less than six inches beyond the edge of pavement.

(8) All driveway culverts must be reinforced concrete pipe, rubber seal and joint wrap, with a minimum of 24 feet and minimum 15-inch diameter.

(9) A minimal sub-grade of streets, 12 inches above adjacent property with elevation subject to approval by county and road engineers.

(10) Triple bituminous surface treatment stone size six, seven and 89, with a sand seal, shall meet the requirements of section 424 of the state department of transportation specifications.

(11) Shoulders must be filled to the top edge of the pavement after paving is in place (see typical section).

(12) All pavement shall be striped and traffic control signs placed in accordance with state department of transportation specifications.

(b) Conformity to existing maps or plans. The location and width of all proposed streets shall (if applicable) be in conformity with official plans and maps and with existing amended plans of the county commissioners.

(c) Continuation of adjoining street system. The proposed street layout shall be coordinated with the street system of the surrounding area. Where possible, existing major streets shall be extended.

(d) Access to adjacent properties. Where it is desirable to provide for street access to adjoining property, proposed streets shall be extended by dedication to the boundary of such property, and a temporary turn-around shall be provided. Houses fronting on minor streets shall have access from minor streets only.

(e) Street names. Proposed streets which are obviously in alignment with other existing and named streets shall bear the assigned name of the existing streets. In no case shall the name of the proposed streets duplicate or be phonetically similar to existing street names, irrespective of the use of suffix, street, avenue, boulevard, drive, place, court, etc. It shall be unlawful for any person in laying out any new street or road to name such street or road on any plat, by marking or in any deed or instrument, without first obtaining approval of the county manager or his designee.

(f) Minor streets. Minor streets shall be so laid out that their use by through-traffic will be discouraged.

(g) Street jogs. Street jogs with centerline offsets by less than 125 feet shall be prohibited.

(h) Right angle intersections. Street intersections shall be as nearly a right angle as practicable.

(i) Cul-de-sac. Short, minor-street having one end open for vehicular traffic, the opposite end being terminated with a permanent turn-around (60-foot radius right-of-way, 40-foot radius asphalt).

(j) Street right-of-way widths. Minimum street right-of-way widths shall be as follows:

(1) Major street: 80-foot right-of-way, 24-foot asphalt.

(2) Collector street: 80-foot right-of-way, 24-foot asphalt.

(3) Minor street: 60-foot right-of-way, 20-foot asphalt.

(Ord. of 3-1-2021(1)) Sec. 32-166. Lots.

(a) Minimum lot width and area requirements. Residential lots shall meet the minimum lot width and area requirements of the design standards of the county.

(b) Lots abutting public streets. Each lot shall abut upon a dedicated public street not less than 30-foot frontage.

(Ord. of 3-1-2021(1)) Secs. 32-167—32-185. Reserved.

ARTICLE VIII. APPLICATION OF REGULATIONS

Sec. 32-186. Filing and recording.

(a) Once requirements are met for a subdivision, as determined by the building inspector, the commissioners will discuss and/or grant final approval.

(b) Upon approval by commissioners, the subdivider shall file for recording the subdivision plat in the office of the clerk of the superior court of the county.

(c) No lot shall be sold nor building permits issued in a subdivision until the commissioners grant final approval of the subdivision and the plat is recorded, as set forth above.

(Ord. of 3-1-2021(1)) Secs. 32-187—32-210. Reserved.

ARTICLE IX. CONSTRUCTION SCHEDULE

Sec. 32-211. Prior approval.

No construction or land disturbing activity of any kind, including grading, installation of improvements, or building, shall begin on any land subject to these regulations without prior approval and implementation of the preliminary plat and soil erosion and sedimentation control plan where required by local, state or federal laws or regulations.

(Ord. of 3-1-2021(1)) Sec. 32-212. Grading and land disturbing activity.

Where applicable, grading and land disturbing operations may commence once approval of the preliminary plat and issuance of the land disturbing activity permit are granted. Soil erosion and sedimentation control measures prescribed in the soil erosion and sedimentation control plan must be installed prior to any land disturbing or grading activity, where applicable.

(Ord. of 3-1-2021(1)) Sec. 32-213. Utilities.

Utility installation shall not occur until the county engineer has approved the rough grade of the street and shoulder preparation.

(Ord. of 3-1-2021(1)) Sec. 32-214. Inspections.

Periodic inspections during the installation of the required improvements in a subdivision shall be made by the building inspector and county engineer to ensure conformity with the approved plans and specifications. The subdivider shall notify the building inspector when each phase of the installation is completed and ready for inspection.

(Ord. of 3-1-2021(1)) Sec. 32-215. Sale and transfer.

No lot or parcel of land shall be sold or transferred or a building permit issued until the subdivision requirements of which said lot or parcel is a part shall have been approved and recorded as provided for in these regulations.

(Ord. of 3-1-2021(1)) Secs. 32-216—32-238. Reserved.

ARTICLE X. VIOLATIONS AND PENALTIES

Sec. 32-239. Filing or recording.

The filing or recording of a final plat of a subdivision without the approval required by these regulations, or the filing and recording of any final plat as a record plat, is hereby declared to be a misdemeanor, and, upon conviction, is punishable as provided by law.

(Ord. of 3-1-2021(1)) Sec. 32-240. Recording official.

The county clerk of the court shall not accept, file, or record any final plat as a "record" plat or any final record plat involving any area subject to these regulations which has not been approved according to these regulations. Should any public official violate the provisions of this section, he shall, in each instance, be subject to the penalty provided in this article, and the governing authority shall have such rights and remedies as to enforcement or collection as provided and may enjoin any violations thereof.

(Ord. of 3-1-2021(1)) Sec. 32-241. Transfer of lots in unapproved subdivisions.

It shall be unlawful for the owner or agent of the owner of any land to be subdivided within the county to transfer or sell or agree to sell or negotiate to sell such land by reference to or exhibition of or by other use of a plat or subdivision of such land before such final plat has been duly approved and recorded in the office of the clerk of the court in and for the county. The description of metes and bounds in the instrument of transfer or other document used in the process of selling or transfer shall not exempt the transaction from the requirements of this subsection. The county may enjoin such transfer or sale or agreement by appropriate action.

(Ord. of 3-1-2021(1)) (Ord. of 3-1-2021(1)) Chapter 33

RESERVED

Chapter 34

TAXATION*

ARTICLE I. IN GENERAL

Secs. 34-1—34-18. Reserved.

ARTICLE II. SPECIAL TAX DISTRICT

Sec. 34-19. Created.

A special tax district is hereby created in and for the unincorporated areas of the county, and the special tax levied in the unincorporated area is specifically earmarked for fire protection, solid waste disposal and recreation for citizens of the unincorporated areas.

(Code 1992, § 32-26(1), (2); Res. of 3-28-1989) Secs. 34-20—34-41. Reserved.

ARTICLE III. EXCISE TAX ON ROOMS AND LODGING*

Sec. 34-42. Hotel/motel tax.

(a) Definitions. The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning:

County means Wayne County and the unincorporated territory of Wayne County, wherein the county government is empowered to impose this tax by O.C.G.A. § 48-13-50 et seq.

County clerk means the duly appointed county clerk or his designee.

Due date means the 20th day after the close of the monthly period for which the tax is to be computed.

Estimated tax liability means the lodging provider's prospective tax liability based upon the average monthly tax remittance in the prior fiscal year, as adjusted for change in tax rate or substantial change in circumstances due to damage to the hotel.

Folio means primary documentation produced by a hotel that demonstrates interaction between the lodging provider and the occupant, and which, at a minimum, reflects the name and address given by the occupant, the date of occupancy, the amount of rent charged for each date, together with the amounts of applicable excise tax, and the method of payment.

Guest room means accommodations occupied, or intended, arranged, or designed for transient occupancy, by one or more occupants for the purpose of living quarters or residential use.

Hotel means any facility or any portion of a facility, including any lodginghouse, roominghouse, dormitory, Turkish bath, bachelor hotel, studio hotel, motel, motor hotel, auto or trailer court, truck stop, tourist cabin, campground, lodge, inn, time-share or other condominium, apartment community, public club, or private club, containing guest rooms and which is occupied, or is intended or designed for occupancy by, paying guests, whether rent is paid in money, goods, labor, or otherwise. The term "hotel" does not include any hospital, asylum, sanitarium, orphanage, jail, prison, or other facility in which human beings are housed and detained under legal restraint.

Lodging provider means any person operating a hotel in the unincorporated limits of the county including, but not limited to, the owner or proprietor of such premises, lessee, sub-lessee, lender in possession, licensee or any other person operating such hotel, and who is subject to the taxation imposed for furnishing for value to the public any rooms, lodgings, or accommodations.

Monthly period means the calendar months of any year.

Occupancy means the use or possession, or the right to the use or possession, of any guest room in a hotel or the right to the use or possession of the furnishings or to the services and accommodations accompanying the use and possession of the guest room.

Occupant means any person who, for a consideration, uses, possesses, or has the right to use or possess any guest room in a hotel under any lease, concession, permit, right of access, license to use or other agreement, or otherwise.

Permanent resident means any occupant who, as of a given date, has or shall have occupied or has or shall have the right of occupancy of any guest room in a hotel for not less than 30 continuous days next preceding such date.

Person means any individual, firm, partnership, joint adventure, association, social club, fraternal organization, joint stock company, corporation, cooperative, estate, trust, receiver, trustee, syndicate, or any other group or combination acting as a unit, the plural as well as the singular number; excepting the United States, the state and any instrumentality of either thereof, upon which the county is without power to impose the tax.

Rent means the consideration received for occupancy valued in money, whether received in money or otherwise, including all receipts, cash, credits, and property or services of any kind or nature, and also the amount for which credit is allowed by the lodging provider to the occupant, without any deduction therefrom whatsoever.

Tax means the tax on occupants imposed by this article, as provided for by O.C.G.A. § 48-13-50 et seq., specifically O.C.G.A. § 48-13-51(a)(3).

(b) Tax rate. There shall be paid for every occupancy of a guest room in a hotel in the unincorporated limits of the county a tax at the rate of eight percent of the amount of rent, unless an exemption is provided under subsection (d) of this section.

(c) Collection of tax by lodging provider. Every lodging provider furnishing guest rooms in a hotel in the unincorporated limits of the county shall collect a tax of five percent on the amount of rent from the occupant, unless an exception is provided under subsection (d) of this section. The lodging provider shall provide a receipt to each occupant, which receipt shall reflect both the amount of rent and the amounts of this and other tax applicable. This tax shall be due from the occupant, and shall be collected by the lodging provider at the same time that the rent is collected. The lodging provider shall be liable for any amount of tax that he fails to collect appropriately, and must remit to the county any amount of tax collected in excess of that which should have been collected.

(d) Exceptions. No tax shall be collected from an occupant after becoming a permanent resident; or from an occupant who certifies in writing that he is staying in such accommodations as a result of his residence having been destroyed by fire or other casualty; or from the United States and the state, or any instrumentality of either thereof; or from any official or employee of the state, its units of local government, or any other instrumentality of the state, when traveling on official business and presenting written substantiation thereof or paying by state or local government credit or debit card; or from a foreign diplomat enjoying exemption by treaty or consular convention, when presenting substantiation issued by the United States Department of State. Occupancy provided without charge in money or otherwise is not subject to this tax.

(e) Registration of lodging provider; form and contents; execution; certificate of authority. Every person engaging or about to engage in business as a lodging provider in the unincorporated limits of the county shall immediately register with the county clerk on a form provided by said official. Persons engaged in such business must so register not later than 30 days after the date that the ordinance from which this article is derived becomes effective. Such registration shall set forth the name under which such person transacts business or intends to transact business, the location of his place of business, and such other information which would facilitate the administration of the tax as prescribed by the county clerk.

The registration shall be signed by the owner if a natural person; in case of ownership by an association or partnership, by a member or partner; and in case of ownership by a corporation, by an officer. The county clerk shall, after such registration, issue without charge a certificate of authority to each lodging provider to collect the tax from the occupant. A separate registration shall be required for each place of business of a lodging provider. Each certificate shall state the name and location of the business to which it is applicable.

(f) Determination generally; returns; payments. All required returns and remittances shall be filed with the county clerk.

(g) Deficiency determinations.

(1) Re-computation of tax; authority to make; basis of re-computation. If the county clerk is not satisfied with the returns of the tax or the amount of the tax required to be paid to the county by any lodging provider, he may compute and determine the amount required to be paid upon the basis of any information within his possession or that may come into his possession. One or more deficiency determinations may be made of the amount due for one or more monthly periods.

(2) Penalty and interest for failure to pay tax. Penalties and interest shall be assessed upon the amount of any determination.

(3) Notice of determination; service of. The county clerk shall give to the lodging provider written notice of his determination. The notice may be served personally or by mail; if by mail, such service shall be addressed to the lodging provider at his address as it appears in the records of the county. Service by mail is complete when delivered by certified mail with a receipt signed by the addressee, or when made by statutory overnight delivery.

(4) Time within which notice of deficiency determination to be mailed. Except in cases of failure to make a return or of fraud, every notice of deficiency determination shall be mailed within three years after the 20th day of the calendar month following the monthly period for which the amount is proposed to be determined, or within three years after the return is filed, whichever period should last expire.

(5) Appeal or protest of deficiency determination. The procedure for contesting a deficiency determination shall be as provided by O.C.G.A. § 48-5-380.

(h) Collection of tax by county.

(1) Action for delinquent tax; time for. At any time within three years after any tax or any amount of tax required to be collected becomes due and payable, and at any time within three years after the delinquency of any tax or any amount of tax required to be collected, the county clerk may bring an action in a court of competent jurisdiction in the name of the county to collect the amount delinquent, together with penalties, interest, court fees, filing fees, attorney's fees and other legal fees incident thereto.

(2) Credit for tax, penalty or interest paid more than once or erroneously or illegally collected.

Whenever the amount of any tax, penalty or interest has been paid more than once, or has been erroneously or illegally collected or received by the county, it may be refunded by the governing authority. If the lodging provider or person determines that he has overpaid or paid more than once, which fact has not been determined by the county clerk, such person shall have three years from the date of payment to file a claim in writing stating the specific ground upon which the claim is founded. The claimant may request a hearing before the governing authority at which the claim and any other information available will be considered. The governing authority shall approve or disapprove the claim, and notify the claimant of its action.

(i) Administration of article; recordkeeping.

(1) Authority of county clerk. The county clerk shall administer and enforce the provisions of this article for the collection of the tax.

(2) Records required from lodging providers, etc.; form. Every lodging provider renting guest rooms in the county shall preserve, for a minimum of three years, all folios, receipts, certificates of exemption and such other documents as the county clerk may prescribe, and in such form as he may require. Said records shall at all times be available for examination within the county.

(3) Examination of records; audits. The county clerk, or any person authorized in writing by him, may examine the books, papers, records, financial reports, equipment and other facilities of any lodging provider renting guest rooms and any lodging provider liable for the tax, in order to verify the accuracy of any return made, or, if no return is made by the lodging provider, to ascertain and determine the amount required to be paid. Such examination shall be conducted at the place of lodging provision, unless the county clerk shall stipulate another place within the county.

(4) Authority to require reports; contents. In administration of the provisions of this article, the county clerk may require the filing of reports by any person or class of persons having in his possession or custody information relating to the rental of guest rooms which are subject to the tax. The reports shall be filed with the county clerk when required by said official, and shall set forth the rental charged for each occupancy, the date of occupancy, the basis for exemption, or such other information as the county clerk may prescribe.

(Code 1992, § 32-46(1), (2); Res. of 3-3-1987, § I; Ord. of 9-7-1999, § I; Ord. of 2-7-2000, § I; Ord. of 9-14-2009, § I(1)—(11))

Sec. 34-43. Use of funds.

Any and all moneys collected from the levy of said tax shall be expressly and exclusively used to enhance and expand the economies of Jesup, Screven, Odum and the county through the promotion of tourism, and for any other purpose provided for in O.C.G.A. § 48-13-51(a)(3).

(Code 1992, § 32-47(1), (2); Res. of 3-3-1987, § II; Ord. of 9-7-1999, § II; Ord. of 2-7-2000; Ord. of 9-14-2009, § II)

Sec. 34-44. Joint board of tourism.

(a) Short title. This section will be known and may be cited as the Joint Board of Tourism for the Cities of Jesup, Odum and Screven and Wayne County Act.

(b) Definitions and references. As used in this section, the term:

Cities means the cities of Jesup, Odum and Screven, which are bodies public and politic in the county.

Conventions means that term as defined in O.C.G.A. § 48-13-50 et seq.

Joint board means the new joint board of tourism for the cities of Jesup, Screven, and Odum and the county that is created hereunder.

Special events means events which, in the judgment of the joint board, will promote tourism in the cities of Jesup, Odum and Screven and the county.

Tourism means that term as defined in O.C.G.A. § 48-13-50 et seq.

Trade show means that term as defined in O.C.G.A. § 48-13-50 et seq.

(c) Creation of joint board; status, tax exemption, and sovereign immunity.

(1) There is hereby created a new body public and politic to be known as the joint board of tourism for the cities of Jesup, Odum and Screven and the county (hereinafter in this section also referred to as the "joint board"). The joint board is intended to be an agency and instrumentality of the City of Jesup and the county and a governmental unit for purposes of sections 103, 141 and 150 of the Internal Revenue Code of 1986, as amended, and, is intended to be a subordinate entity to the City of Jesup and the county to the extent necessary under section 265(b)(3)(E)(ii) of the Internal Revenue Code of 1986, as amended.

(2) The joint board shall have its principal office in the geographical limits of the City of Jesup, as amended from time to time, and its legal situs or domiciliary for the purposes of this article shall be the said geographical limits of the City of Jesup.

(3) The exercise of the powers conferred upon the joint board in this section shall constitute essential governmental functions for public purposes. The properties of the joint board, both real and personal, and the income of the joint board are declared to be public properties and income used for the benefit and welfare of the people of the cities of Jesup, Odum and Screven and the county, and not for the purpose of private or corporate benefit, and such properties, to the extent of the joint board's ownership thereof or other interest therein, and all income and obligations of the joint board, shall be exempt from all taxes and special assessments of the state or any city, county, or other political subdivision thereof. The joint board shall have all of the exemptions and exclusions from taxes as are now granted to cities and counties in the state for the operation of properties or facilities similar to the properties and facilities to be owned or operated, or both, by the joint board.

(4) Any action to protect or enforce any rights under the provisions of this section or any suit or action against the joint board shall be brought in the superior court of the county.

(5) The property of the joint board shall not be subject to levy and sale under legal process.

(6) The records of the joint board shall be public records which are subject to O.C.G.A. § 50-18-70 et seq.

(7) Nothing in this section shall be construed to abridge or change the powers and duties of other authorities, departments, boards, and like agencies of the county or the cities of Jesup, Odum or Screven.

(d) Members and meetings.

(1) The joint board shall consist of eight appointed members, who shall serve terms of four years.

a. Three members shall be appointed by the county board of commissioners.

b. Three members shall be appointed by the board of commissioners of the City of Jesup.

c. One member shall be appointed by the board of commissioners of the City of Odum, which such member shall be a resident of the City of Odum.

d. One member shall be appointed by the board of commissioners of the City of Screven, which such member shall be a resident of the City of Screven.

e. The city manager of the City of Jesup and the county administrator of the county shall be ex officio, non-voting members of the joint board.

(2) Appointments for succeeding terms shall be made in January of the calendar year following expiration of terms with said appointments before effective thereupon.

(3) Any member may resign at any time by filing a written notice of resignation with the joint board.

(4) The joint board shall meet at such times as may be necessary to transact the business coming before it. Meetings shall be conducted in accordance with Robert's Rules of Order.

(5) At the first meeting of the joint board, the members shall elect a chairperson, a vicechairperson, and a secretary-treasurer from its membership. Thereafter, commencing in the year 2014, at the first meeting of the joint board, and each calendar year thereafter, the members shall elect a chairperson, a vice-chairperson, and a secretary-treasurer from its membership for that calendar year. The chairperson shall preside at meetings of the joint board. The vicechairperson shall preside at meetings in the absence of the chairperson. In the absence of both the chairperson and vice-chairperson, the members present at a meeting shall elect a temporary chairperson to preside at that meeting, so long as the chairperson and vice-chairperson both remain absent from the meeting.

(6) The joint board shall have the right to elect or hire the chief executive officer or program coordinator of the joint board, to set the salary or wages of such person, to pay a salary or wages to such person, and to otherwise set the terms and conditions of the employment of such person.

(7) Four members shall constitute a quorum. Official action may be taken by majority vote of those members voting on a matter if a quorum is present and voting on such matter, except that the bylaws of the joint board may only be initially adopted or subsequently amended by majority vote of all members. All members present at a meeting, including the chairperson, vicechairperson or any other member presiding at such meeting, shall be entitled to vote on all matters that come before the meeting. No vacancy on the joint board shall impair the right of the quorum to exercise all the rights and perform all the duties of the joint board.

(8) Members shall receive no compensation for their services as members of the joint board, but may be reimbursed for their proper and reasonable expenses incurred in the performance of their duties, subject to any limitations imposed by general law of the state on the reimbursement of public officials, and subject to any limitations which may be contained from time to time in the bylaws of the joint board.

(e) Purpose. The purpose of the joint board is to plan, coordinate, and administer an effective tourism program for the county and the cities of Jesup, Odum and Screven in such manner as the joint board shall determine to be appropriate. All proceeds of the hotel/motel excise tax collected by the cities of Jesup, Odum and Screven and the county which are provided to the joint board shall be expended in compliance with the applicable provisions of state law, inclusive of O.C.G.A. § 48-13-51, as amended.

(f) Powers.

(1) The joint board shall have all powers allowed by law and consistent with the provisions of this section as are necessary or convenient to carry out its corporate purpose, including, without limitation, the power to:

a. Adopt and alter a corporate seal.

b. Purchase advertising promoting tourism, conventions, trade shows, and special events.

c. Encourage, solicit, promote, procure, sponsor, co-sponsor, and service conventions, trade shows and special events.

d. Conduct activities to foster better public understanding on the part of individuals and businesses of the importance of tourism and the convention and visitors industry to the economy of the county and the cities of Jesup, Odum and Screven.

e. Conduct activities to encourage and assist the cooperation between the businesses and industries servicing tourists, conventions, and special events.

f. Engage in fundraising activities in furtherance of its corporate purpose.

g. Acquire by purchase, lease, or otherwise and hold, lease, and dispose of real and personal property of every kind and character for its corporate purposes.

h. Acquire in its own name by purchase, on such terms and conditions and in such manner as it may deem proper, real property or rights of easements therein or franchises necessary or convenient for its corporate purpose, to use the same so long as its corporate existence shall continue, to lease or make contracts with respect to the use of the same, or to dispose of the same in any manner it deems to the best advantage of the joint board.

i. Appoint, select, and employ a chief executive officer, program director, officers, agents, and employees, and independent consultants including, but not limited to, engineering, architectural, and construction experts, fiscal agents, economists, and attorneys, and fix their respective compensations; and to delegate to the chief executive officer the authority and responsibility necessary to administer properly the day-to-day business of the joint board within policies set by the joint board, and subject to its review. The powers delegated to the chief executive officer may, at the election of the joint board, include the making of recommendations as to the hiring and termination of other employees and their compensation, the management of the joint board's offices and properties, the making of budget recommendations, and the hiring of independent consultants.

j. Appoint an advisory committee and other committees of persons from the public and private sectors without regard to their places of residence.

k. Make contracts of every kind and character, and without limitation, and without limiting the generality of the above, the joint board shall be permitted to enter into the following:

1. Contracts under which hotel/motel taxes collected by the cities of Jesup, Odum and Screven and the county are paid to and expended by the joint board as contemplated by O.C.G.A. § 48-13-51(b).

2. Contracts under which the joint board purchases administrative and financial management services from the cities of Jesup, Odum and Screven and the county to be performed by personnel at the cost of such governmental entity, which shall include the costs of payroll, employee benefits, supplies, and overhead reasonably allocable to the performance of such services.

3. Lease contracts relating to leases of real property, personal property, or both real and personal property.

l. Accept loans and grants of money or materials or property of any kind from the United States of America or any agency or instrumentality thereof, upon such terms and conditions as the United States of America or such agency or instrumentality may impose.

m. Accept loans and grants of money or materials or property of any kind from the state or any agency or instrumentality or political division thereof, upon such terms and conditions as the state or such agency or instrumentality or political subdivision may impose.

n. Sell, lease, grant, exchange, or otherwise dispose of any property, both real and personal, or interest therein.

o. Sue and be sued in contract and in tort and complain and defend in all courts.

p. Advise and recommend plans to other public and private sector entities for the promotion of tourism, conventions, and trade shows.

q. Conduct studies and develop plans for improving tourism in the county and the cities of Jesup, Odum and Screven.

r. Receive and disburse public funds appropriated by the county and the cities of Jesup, Odum and Screven, including, but not limited to, revenues derived from the hotel/motel excise tax collected by them; and receive and disburse funds from private sources and other revenues which may be received from time to time which would assist in the accomplishment of its corporate purpose.

s. Do all things necessary or convenient to accomplish its corporate purpose and to exercise any power permitted by the laws of the state to be exercised by private corporations which will further the joint board's ability to accomplish such purpose, so long as the exercise of such power is not in conflict with the constitution or laws of the state.

(2) The powers enumerated in each paragraph of subsection (f)(1) of this section are cumulative of and in addition to those powers enumerated in the other paragraphs of subsection (f)(1) of this section and any other powers elsewhere in this section or which may reasonably be inferred from the provisions of this section. This section shall be liberally construed to effect the described purposes, and in interpreting this section, the courts are not to apply Dillon's Rule.

(g) Finances. The joint board shall submit quarterly financial statements to the county board of commissioners and the board of commissioners of the City of Jesup.

(h) Bylaws. The joint board may, by affirmative vote of a majority of all members, adopt bylaws to govern the joint board, its employees, and operation, and may, by affirmative vote of all members, repeal, replace, or amend such bylaws.

(i) Liability limited. Neither the members of the joint board nor any person executing bonds, notes, leases, or other agreements or obligations on behalf of the joint board shall be personally liable thereon by reason of such execution.

(j) Cities and the county not bound. The joint board shall have no power or authority to bind the county or the cities of Jesup, Odum and Screven by any contract, agreement, financial obligation, indebtedness, or otherwise; and no contract, agreement, financial obligation, or indebtedness incurred by the joint board shall ever be a claim or charge against the county or the cities of Jesup, Odum and Screven, provided that both the joint board and the county or the cities of Jesup, Odum and Screven shall be bound to each other by contracts, agreements, financial obligations or indebtedness between themselves.

(k) Dissolution. Should the joint board, for any reason, be dissolved, title to all property of any kind and nature, real and personal, held by the joint board at the time of such dissolution shall be conveyed to the county and the City of Jesup jointly; or title to any such property may be conveyed prior to such dissolution in accordance with provisions which may be made therefor in any resolution or trust instrument relating to such property, subject to any liens, leases, or other encumbrances outstanding against or in respect to such property at the time of such conveyance.

(Code 1992, § 32-48(1), (2); Ord. of 11-4-1996, §§ 1, 2; Ord. of 9-7-1999, § III; Ord. of 2-7-2000, § III; Ord.

of 1-16-2013, §§ 1—11) Sec. 34-45. Tourism program; funding.

The City of Jesup, City of Odum, City of Screven, and the county shall contract with the board of tourism to carry out an aggressive tourism program, and shall commit all proceeds from the levy of the hotel and motel tax and other designated funds for this express and exclusive purpose.

(Code 1992, § 32-49; Res. of 3-3-1987, § IV; Ord. of 9-7-1999, § IV; Ord. of 2-7-2000, § IV) Sec. 34-46. Collection by county administrator.

The county administrator shall collect the proceeds from the levy of the hotel and motel tax for all unincorporated areas within the county and remit same to the board of tourism on behalf of the county.

(Code 1992, § 32-50; Res. of 3-3-1987, § V; Ord. of 9-7-1999, § V; Ord. of 2-7-2000, § V) Sec. 34-47. Monthly collection.

Proceeds from the levy of the hotel/motel tax shall be due and collected monthly, no later than the 20th day of the month following the month of collection. All such taxes which have not been remitted to the county on or before the due date shall bear interest at the same rate as ad valorem taxes for the county.

(Code 1992, § 32-51; Res. of 3-3-1987, § VI; Ord. of 9-7-1999, § VI; Ord. of 2-7-2000, § VI) Sec. 34-48. Budget.

On or before January 1 of each year, the board of tourism shall prepare and submit to the county a budget for expenditures to be made in the upcoming year.

(Code 1992, § 32-52; Res. of 3-3-1987, § VII; Ord. of 9-7-1999, § VII; Ord. of 2-7-2000, § VII) Sec. 34-49. Board meetings; accounting; audits.

The executive director of the board of tourism shall publish the minutes of all meetings, maintain a full accounting of funds, publish not less than quarterly a report of activities and financial statement to the members of the boards of the City of Jesup, City of Odum, City of Screven, and the county. The members of the board of tourism shall cause an annual audit of the funds of the board by a certified public accountant licensed to perform said services in the state. The board of tourism shall furnish a copy of such audit to the county on or before February 1 of each year.

(Code 1992, § 32-53; Ord. of 2-7-2000, § VIII) Secs. 34-50—34-73. Reserved.

ARTICLE IV. SALES AND USE TAX*

Sec. 34-74. Levy.

Pursuant to the authority contained in O.C.G.A. § 48-8-80 et seq., the county commissioners and the governing authority of Jesup, Georgia, do hereby levy a joint county and municipal sales and use tax at the rate of one percent within the special district whose boundaries are conterminous with the boundaries of the county.

(Code 1992, § 32-76; Res. of 9-2-1986) Secs. 34-75—34-91. Reserved.

ARTICLE V. FINANCIAL INSTITUTIONS BUSINESS LICENSE TAX†

Sec. 34-92. Levy.

In accordance with O.C.G.A. § 48-6-93, there is hereby levied an annual business license tax upon all depository financial institutions located within the county at a rate of 0.25 percent of the gross receipts of the depository financial institutions. The term "gross receipts" means gross receipts as defined in O.C.G.A. § 48-6-93. The term "depository financial institutions" means state and national banks, state building and loan associations, and federal savings and loan associations.

(Code 1992, § 32-96; Res. of 11-1-1983, § 1) Sec. 34-93. Minimum tax.

The minimum annual amount of business license tax due from any depository financial institution pursuant to this article shall be $1,000.00.

(Code 1992, § 32-97; Res. of 11-1-1983, § 2) Sec. 34-94. Due date.

Taxes levied pursuant to this article shall be due no later than 30 days after filing of the return, unless extended by the board of commissioners.

(Code 1992, § 32-99; Res. of 11-1-1983, § 4) Sec. 34-95. Distribution of copies of article.

The clerk of the county is hereby directed to forward a copy of this article to each depository financial institution in the county and to the home office of each such depository financial institution, if located outside the county.

(Code 1992, § 32-100; Res. of 11-1-1983, § 5) Secs. 34-96—34-118. Reserved.

ARTICLE VI. GROSS PREMIUMS TAX ON PROPERTY AND CASUALTY INSURERS*

Sec. 34-119. Levy.

In accordance with O.C.G.A. § 33-8-8.2, there is hereby levied an annual tax upon each insurer doing insurance business within the unincorporated area of the county, in an amount equal to 2½ percent of the gross direct premiums received during the calendar year on all insurance other than life insurance, as defined in O.C.G.A. § 33-3-5(2), (3), (4) and (5). The term "gross direct premiums" means gross direct premiums as used in O.C.G.A. § 33-8-8.2(a).

(Code 1992, § 32-121; Res. of 9-6-1983, § 1) Secs. 34-120—34-136. Reserved.

ARTICLE VII. OCCUPATION TAX†

Sec. 34-137. Required.

For the year 2006 and succeeding years thereafter, each person engaged in any business, trade, profession or occupation in the county, whether with a location in the county or in the case of an out-of-state business with no location in the state exerting substantial efforts within the state pursuant to O.C.G.A. § 48-13-7, shall pay an occupation tax for such business, trade, profession or occupation; which tax and any applicable registration shall be displayed in a conspicuous place in the place of business, if the taxpayer has a permanent business location in the county. If the taxpayer has no permanent business location in the county, such business tax registration shall be shown to the county building inspector or his deputies or to any officer of such county, upon request.

(Code 1992, § 32-151; Ord. of 6-5-2006(3), § 1) Sec. 34-138. Construction of terms; definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Administrative fees means a component of an occupation tax which approximates the reasonable cost of handling and processing the occupation tax.

Dominant line means the type of business, within a multiple-line business, that the greatest amount of income is derived from.

Location of office shall not include a temporary work site which serves a single customer or project.

Occupation tax means a tax levied on persons, partnerships, corporations or other entities for engaging in an occupation, profession or business for revenue-raising purposes.

Person shall be held to include sole proprietors, corporations, partnerships, nonprofits or any other form of business organization, but specifically excludes charitable nonprofit organizations which utilize 50 percent of their proceeds for charitable purposes.

Practitioner of profession or occupation means one who, by state law, requires a state license regulating such profession or occupation. The term "practitioner of profession and occupation" shall not include a practitioner who is an employee of a business, if the business pays an occupation tax.

Regulatory fees means payments, whether designated as license fees, permit fees or by another name, which are required by a local government as an exercise of its police power and as a part of or an aid to regulation of an occupation, profession or business. The amount of a regulatory fee shall approximate the reasonable cost of the actual regulatory activity performed by the county. A regulatory fee my not include an administrative fee. Development impact fees, as defined by O.C.G.A. § 36-71-2(8), or other costs or conditions of zoning or land development are not regulatory fees.

(Code 1992, § 32-152; Ord. of 6-5-2006(3), § 2) Sec. 34-139. Administrative fee structure.

(a) For the year 2006 and succeeding years thereafter, a non-prorated, nonrefundable administrative fee as determined from time to time by the board of commissioners shall be required on all business and occupational tax accounts that were not registered in the county in prior years. Business and occupational tax accounts registered in the year 2006 are specifically excluded from the payment of this fee.

(b) If an applicant was required to have obtained a license pursuant to this article prior to January 15, he shall pay an administrative fee as determined from time to time by the board of commissioners for application made after the January 15 deadline.

(Code 1992, § 32-153; Ord. of 6-5-2006(3), § 3) Sec. 34-140. Levied; restrictions.

(a) An occupation tax shall be levied upon those businesses and practitioners of professions and occupations with one or more locations or offices in the unincorporated part of the county and/or upon the applicable out-of-state businesses with no location or office in the state pursuant to O.C.G.A.

§ 48-13-7 upon the following criteria: the number of employees of the business or practitioner.

(b) Occupation tax schedule. Number of employees: the tax rate determined by number of employees for each business, trade, profession, or occupation shall be as determined from time to time by the board of commissioners.

(Code 1992, § 32-154; Ord. of 6-5-2006(3), § 4) Sec. 34-141. Business with no location in state.

Registration and assessment of an occupation tax is hereby imposed on those businesses and practitioners of professions with no location or office in the state if the businesses' largest dollar volume of business in the state is in the county and the business or practitioner:

(1) Has one or more employees or agents who exert substantial efforts within the jurisdiction of the county for the purpose of soliciting business or serving customers or clients; or

(2) Owns personal or real property which generates income and which is located within the jurisdiction of the county.

(Code 1992, § 32-155; Ord. of 6-5-2006(3), § 5) Sec. 34-142. Business registration.

The business registration of each business operated in the local government's jurisdiction shall identify the line or lines of business that the business conducts. No business shall conduct any line of business without first having that line of business registered with the county building inspector's office and that line of business being noted by the county building inspector's office upon the business registration form, which is to be displayed by the business owner.

(Code 1992, § 32-156; Ord. of 6-5-2006(3), § 6) Sec. 34-143. Multiple numbers of businesses.

Where a person conducts business at more than one fixed location, each location or place shall be considered a separate business for the purpose of occupation tax.

(Code 1992, § 32-157; Ord. of 6-5-2006(3), § 7) Sec. 34-144. Practitioners exclusively employed by a government.

Any practitioner whose office is maintained by and who is employed in practice exclusively by the United States, the state, a municipality or county of the state, or instrumentalities of the United States, the state, or a municipality or county of the state, shall not be required to obtain a license or pay an occupation tax for that practice.

(Code 1992, § 32-158; Ord. of 6-5-2006(3), § 8) Sec. 34-145. Purpose of tax.

The occupation tax levied herein is for revenue purposes only and is not for regulatory purposes, nor is the payment of the tax made a condition precedent to the practice of any such profession, trade, or calling. The occupation tax only applies to those businesses and occupations which are covered by the provisions of O.C.G.A. §§ 48-13-5 through 48-13-26. All other applicable businesses and occupations are taxed by the local government pursuant to the pertinent general and/or local law and ordinance.

(Code 1992, § 32-159; Ord. of 6-5-2006(3), § 9) Sec. 34-146. When tax due and payable; penalty.

(a) Each such occupation tax shall be for the calendar year 2006 and succeeding calendar years thereafter unless otherwise specifically provided. Such registration and occupation tax shall be payable January 1 of each year and shall, if not paid by January 15 of each year, be subject to penalties for delinquency as prescribed in this article. On any new profession, trade or calling begun in the county in 2006 or succeeding years thereafter, the registration and tax shall be delinquent if not obtained immediately upon beginning business and a flat fee penalty imposed. The tax registration herein provided for shall be issued by the county building inspector and if any person, firm or corporation whose duty it is to obtain a registration shall, after such registration or occupation tax becomes delinquent, transact or offer to transact, in the county, any of the kind of profession, trade or calling subject to this article without having first obtained such registration, such offender shall, upon conviction by the county magistrate judge, be guilty of a misdemeanor.

(b) In addition to the above remedies, the county marshal may proceed to collect such delinquent occupation tax in the same manner as provided by law for tax executions.

(Code 1992, § 32-160; Ord. of 6-5-2006(3), § 10) Sec. 34-147. Exemption for charitable business.

No business on which a business registration or occupation tax is levied by this article shall be exempt from such registration or tax on the ground that such business is operated for a charitable purpose, unless 50 percent or more of the entire proceeds from such business are devoted to such purpose.

(Code 1992, § 32-161; Ord. of 6-5-2006(3), § 11) Sec. 34-148. State registration; displayed.

(a) Each person who is licensed by the secretary of state pursuant O.C.G.A. title 43 shall provide evidence of a proper and current state license before the county registration may be issued.

(b) Each person who is licensed by the state shall post the state license in a conspicuous place in the licensee's place of business and shall keep the license there at all times while the license remains valid.

(Code 1992, § 32-162; Ord. of 6-5-2006(3), § 12) Sec. 34-149. Qualifications of business.

Any business required to obtain health permits, bonds, certificates of qualification, certificates of competency or any other regulatory matter shall first, before the issuance of a county business registration, show evidence that such requirements have been met.

(Code 1992, § 32-163; Ord. of 6-5-2006(3), § 13) Sec. 34-150. Failure to register business.

All persons subject to the occupation tax levy pursuant to this article shall be required to obtain the necessary registration for such business as described in this article, and in default thereof, the officer or agent soliciting for or representing such persons shall be subject to the same penalty as other persons who fail to obtain a registration. Every person commencing business in the county after January 1 of each year shall likewise obtain the registration herein provided for before commencing the same; and any person transacting, or offering to transact in the county, any of the kinds of business, trade, profession or occupation without first having so obtained such registration, shall be subject to penalties provided thereof.

(Code 1992, § 32-164; Ord. of 6-5-2006(3), § 14) Sec. 34-151. When registration due and payable; penalty.

(a) Each such registration shall be for the calendar year in which the registration was obtained, unless otherwise specifically provided. There is hereby imposed a penalty upon each business which fails to apply for and obtain an appropriate business registration and pay all tax and fees as provided herein before July 15, 2006, and on January 15 of each year hereafter. Every person commencing business in the county after July 1, 2006, and after January 1 of each year hereafter shall obtain the registration required before commencing such business. Any person transacting or offering to transact in the county any business, trade, profession or occupation without first having obtained such registration shall be guilty of an offense. Such penalties shall be in addition to all other penalties, civil and criminal herein provided, and may be collected by the remedies herein provided for collection of the occupation tax, and shall have the same lien and priority as the occupation tax to which the penalty applies.

(b) The registration herein provided for shall be issued by the county building inspector, and if any person, firm or corporation whose duty it is to obtain a registration shall, after such occupation tax becomes delinquent, transact or offer to transact, in the county, any of the kind of business, trade, profession or occupation without having first obtained such registration, such offender shall be subject to penalties provided thereof.

(Code 1992, § 32-165; Ord. of 6-5-2006(3), § 15) Sec. 34-152. Businesses not covered by this article.

The following businesses are not covered by the provisions of this article, but may be assessed an occupation tax or other type of tax pursuant to the provisions of other general laws of the state or by local law:

(1) Those businesses regulated by the state public service commission.

(2) Those electrical service businesses organized under O.C.G.A. title 46, ch. 3.

(3) Any farm operation for the production from or on the land of agricultural products, but not including agribusiness.

(4) Cooperative marketing associations governed by O.C.G.A. § 2-10-105.

(5) Insurance companies governed by O.C.G.A. § 33-8-8 et seq.

(6) Motor common carries governed by O.C.G.A. § 46-7-15.

(7) Those businesses governed by O.C.G.A. § 48-5-355. (Businesses that purchase carload lots of guano, meats, meal, flour, bran, cottonseed or cottonseed meal and hulls.)

(8) Agricultural products and livestock raised in the state governed by O.C.G.A. § 48-5-356.

(9) Depository financial institutions governed by O.C.G.A. § 48-6-93.

(10) Facilities operated by a charitable trust governed by O.C.G.A. § 48-13-55.

(Code 1992, § 32-167; Ord. of 6-5-2006(3), § 17) Sec. 34-153. Exempted by law.

An occupation tax shall not apply to any business where such levy is prohibited or exempted by the laws of the state or of the United States.

(Code 1992, § 32-168; Ord. of 6-5-2006(3), § 18) Sec. 34-154. Registration and tax of multiple businesses.

Where a business is operated at more than one place or where the business includes more than one line, such business shall be required to obtain the necessary registration for each location and line and pay an occupation tax in accordance with the prevailing taxing method and tax rate for each location and line.

(Code 1992, § 32-170; Ord. of 6-5-2006(3), § 20) Sec. 34-155. Amendment.

This article shall be subject to amendment or repeal, in whole or in part, at any time, and no such amendment or repeal shall be construed to deny the right of the commission to assess and collect any of the taxes or other charges prescribed. Such amendment may increase or lower the amounts and tax rates of any occupation and may change the classification thereof. The payment of any occupation tax provided for shall not be construed as prohibiting the levy or collection by the jurisdiction of additional occupation taxes upon the same person, property or business.

(Code 1992, § 32-171; Ord. of 6-5-2006(3), § 21) Secs. 34-156—34-178. Reserved.

ARTICLE VIII. ENERGY EXCISE TAX

Sec. 34-179. Definitions.

As used in this article, the terms "dealer," "energy," "local sales and use tax" and "purchaser" shall have the same meanings as provided in O.C.G.A. § 48-13-110.

(Code 1992, § 32-231; Ord. of 11-15-2012, § 1) Sec. 34-180. Imposition; rate; remitting; recovery; liabilities.

In accordance with the provisions of O.C.G.A. § 48-13-110 et seq., there is imposed within the territorial limits of the county an excise tax on the sale, use, storage, or consumption of energy when such sale, use, storage, or consumption would have constituted a taxable event for purposes of sales and use tax under O.C.G.A. § 48-8-1 et seq., but for the exemption in O.C.G.A. § 48-8-3.2.

(Code 1992, § 32-232; Ord. of 11-15-2012, § 2) Sec. 34-181. Excise tax rate; phase-in.

(a) Such excise tax shall be levied and collected by the governing authority of the county pursuant to O.C.G.A. §§ 48-13-112 and 48-13-114, and as provided in this section.

(b) Except as otherwise provided in this section, the rate of such excise tax shall be phased in over a four-year period as follows:

(1) For the period commencing January 1, 2013, and concluding at the last moment of December 31, 2013, such excise tax shall be at a rate equivalent to 25 percent of the total amount of local sales and use tax in effect in such special district that would be collected on the sale, use, storage, or consumption of energy but for the exemption in O.C.G.A. § 48-8-3.2;

(2) For the period commencing January 1, 2014, and concluding at the last moment of December 31, 2014, such excise tax shall be at a rate equivalent to 50 percent of the total amount of local sales and use tax in effect in such special district that would be collected on the sale, use, storage, or consumption of energy but for the exemption in O.C.G.A. § 48-8-3.2;

(3) For the period commencing January 1, 2015, and concluding at the last moment of December 31, 2015, such excise tax shall be at a rate equivalent to 75 percent of the total amount of local sales and use tax in effect in such special district that would be collected on the sale, use, storage, or consumption of energy but for the exemption in O.C.G.A. § 48-8-3.2; and

(4) On or after January 1, 2016, such excise tax shall be at a rate equivalent to 100 percent of the total amount of local sales and use tax in effect in such special district that would be collected on the sale, use, storage, or consumption of energy but for the exemption in O.C.G.A. § 48-8-3.2.

(c) In accordance with O.C.G.A. § 48-8-3.2(c)(4), if a project of regional significance under O.C.G.A.

§ 48-8-3(92) is started in the special district, it shall not be subject to the phase-in period contained in subsections (b)(1), (b)(2), and (b)(3) of this section, and the sale, use, storage, or consumption of energy in connection therewith shall be subject to the rate specified in subsection (b)(4) of this section notwithstanding the January 1, 2016 limitation in that subsection (b)(4) of this section.

(d) (1) Following such initial imposition during the phase-in time period, on or after January 1, 2016, the rate of the excise tax levied and collected by the governing authority of the county shall be directed by O.C.G.A. § 48-13-112(d). Such rate shall be controlled by the maximum amount of local sales and use tax in effect in the special district, but in no event more than two percent (except in the case where the municipal option water and sewer tax is levied, where that rate will be three percent).

(2) In the event the total rate of local sales and use taxes in effect in the special district decreases from two percent to one percent, the rate of the excise tax under this article shall likewise be reduced at the same time such local sales and use tax rate reduction becomes effective.

(3) In the event the total rate of local sales and use taxes in effect in the special district increases from one percent to two percent, the rate of the excise tax under this article shall likewise be increased at the same time such local sales and use tax rate increase becomes effective.

(e) Except as otherwise provided in this section, the rate of such excise tax shall be phased out over a four-year period as follows:

(1) For the period commencing on March 1, 2018, and concluding at the last moment of February 28, 2019, such excise tax shall be at a rate equivalent to 75 percent of the total amount of local sales and use tax in effect in such special district that would be collected on the sale, use, storage, or consumption of energy but for the exemption in O.C.G.A. § 48-8-3.2.

(2) For the period commencing March 1, 2019, and concluding at the last moment of February 29, 2020, such excise tax shall be at a rate equivalent to 50 percent of the total amount of local sales and use tax in effect in such special district that would be collected on the sale, use, storage, or consumption of energy but for the exemption in O.C.G.A. § 48-8-3.2.

(3) For the period commencing March 1, 2020, and concluding at the last moment of February 28, 2021, such excise tax shall be at a rate equivalent to 25 percent of the total amount of local sales and use tax in effect in such special district that would be collected on the sale, use, storage, or consumption of energy but for the exemption in O.C.G.A. § 48-8-3.2.

(4) On or after March 1, 2021, such excise tax shall not be imposed or collected by Wayne County or any municipality.

(Code 1992, § 32-233; Ord. of 11-15-2012, § 3; Ord. of 2-5-2018) Sec. 34-182. Imposition; remittance; recovery.

In accordance with O.C.G.A. § 48-13-112(c), such excise tax shall be:

(1) Imposed only at the time sales and use tax on the sale or use of such energy would have been due and payable under O.C.G.A. § 48-8-30 but for the exemption under O.C.G.A. § 48-8-3.2;

(2) Due and payable in the same manner as would be required under O.C.G.A. § 48-8-1 et seq., except as otherwise provided in O.C.G.A. § 48-8-110 et seq.;

(3) A debt of the purchaser of energy until it is paid and shall be recoverable at law in the same manner as authorized for the recovery of other debts;

(4) Remitted to the governing authority of the county by the dealer collecting such excise tax; and

(5) A liability of the dealer at the applicable rate on the charges actually collected or the amount of excise taxes collected from purchasers, whichever is greater.

(Code 1992, § 32-234; Ord. of 11-15-2012, § 4) Sec. 34-183. Exemption certificates.

(a) The governing authority of the county, or the collecting officer appointed under section 34-186, shall make diligent efforts to identify all energy providers and purchasers in the special district and to ascertain whether such a purchaser has completed a uniform exemption certificate provided from the website of the state department of revenue seeking to qualify such purchaser for the exemption under O.C.G.A. § 48-8-3.2. Such certificate shall be utilized by such governing authority or collecting officer for the purpose of determining the applicability of the excise tax under this article.

(b) An energy provider shall be authorized to rely upon such uniform exemption certificates. No penalty shall attach to such provider for failure to collect the excise tax under this article when it has properly collected and remitted local sales and use taxes on such energy where the purchaser would have qualified for the uniform exemption certificate but failed to apply for such certificate, or where the purchaser received such certificate but failed to file it with the energy provider.

(Code 1992, § 32-235; Ord. of 11-15-2012, § 5) Sec. 34-184. Commencement of collections.

The excise tax imposed pursuant to this article shall become effective on January 1, 2013, and shall be due and payable to the governing authority of the county monthly on or before the 20th day of every month and each respective month in which such taxes are collected, and payment shall be accompanied by a return for the preceding monthly period showing the gross sales and purchases arising from all sales and purchases taxable under this article during the preceding calendar month.

(Code 1992, § 32-236; Ord. of 11-15-2012, § 6) Sec. 34-185. Allocation, distribution, and expenditure of proceeds.

(a) Pursuant to O.C.G.A. § 48-13-114(b), the excise tax proceeds shall be allocated and distributed by the governing authority of the county at the end of each calendar month. An amount equal to one percent of such proceeds collected by the county shall be paid into the general fund of the county to defray the costs of collection and administration.

(b) The remainder shall be distributed in accordance with the intergovernmental agreement as required under O.C.G.A. § 48-13-114(b) and (c). Within 30 days following the end of each calendar month, the remainder shall be distributed to the general fund of the county and the general fund of each participating municipality in accordance with the applicable provisions of O.C.G.A. § 48-13-114(c)(1) or

(2) as follows:

(1) If two local sales and use taxes are in effect in the special district, an amount equal to one-half of the proceeds shall be distributed to the general fund of the county and the general fund of each participating municipality located in the county according to the same proportionate share as specified under the distribution provisions of the first local sales and use tax, and an amount equal to one-half of the proceeds of the excise tax shall be distributed to the general fund of the county and the general fund of each participating municipality located in such county according to the same proportionate share as specified under the distribution provisions of the second local sales and use tax; or

(2) If only one such local sales and use tax is in effect in the special district, then the proceeds of the excise tax shall be distributed to the general fund of the county and the general fund of each participating municipality located in the county according to the same proportionate share as specified under the distribution provisions of the local sales and use tax.

(c) Except as provided in subsection (a) of this section, proceeds of the excise tax deposited in the general fund of the county may be expended for any lawful purpose as determined by the governing authority of the county.

(Code 1992, § 32-237; Ord. of 11-15-2012, § 7) Sec. 34-186. Administrative provisions; audits; examinations; collecting officer.

(a) The governing authority of the county shall be authorized to designate a collecting officer for collection and administration of the excise tax under this article.

(b) The collecting officer shall be authorized to provide for procedures necessary to the proper implementation of this article, including, but not limited to, periodic auditing of dealers collecting and remitting the excise tax. The collecting officer, or the designee of the collecting officer, is specifically authorized to examine the books, papers, records, financial reports, equipment, or other facilities of any purchaser which is required to remit the excise tax under this article.

(c) In accordance with O.C.G.A. § 48-13-118, as part of the audit report required under O.C.G.A.

§ 36-81-7, the auditor shall include, in a separate schedule, a report of the revenues pertaining to the excise tax under this article.

(Code 1992, § 32-238; Ord. of 11-15-2012, § 8) Chapter 35

RESERVED

Chapter 36

TRAFFIC AND VEHICLES*

Sec. 36-1. Uniform Rules Of the Road adopted.

(a) Pursuant to O.C.G.A. title 40, ch. 6, §§ 40-6-372 through 40-6-376, O.C.G.A. §§ 40-6-1 through 40-6-395 of that chapter known as the Uniform Rules of the Road and the definitions contained in O.C.G.A. § 40-1-1 are hereby adopted as and for the traffic regulations of the county, with like effect as if recited herein.

(b) Unless another penalty is expressly provided by law, every person convicted of a violation of any provision of this section shall be punished in accordance with section 1-11.

(Code 1992, § 34-1) Sec. 36-2. Weight restriction on Old Doctortown Road.

(a) The road described in this subsection, known as Old Doctortown Road, is hereby closed to vehicles having more than two axles, and, together with cargo, exceeding a net weight of 10,000 pounds, with the exception of such vehicles making deliveries on Old Doctortown Road. Old Doctortown Road is that segment of road shown as county road 18 beginning at state routes 23 and 38 and continuing northeasterly for a distance of 1.9 miles to the New Doctortown Road.

(b) Any person convicted of a violation of this section shall be punished as provided in section 1-11.

(Code 1992, § 34-2; Res. of 8-2-1982) Chapter 37

SOLAR ENERGY DEVELOPMENT

ARTICLE I. IN GENERAL

Secs. 37-1—37-10. Reserved.

Sec. 37-11. Purpose.

The purpose of this solar energy development ordinance is to protect public health and safety through establishing reasonable standards for the construction, installation, operation and decommissioning of commercial solar energy systems in the county. This ordinance is not intended to abridge safety, health, or environmental requirements contained in other applicable sections of this Code. This ordinance shall not be deemed to supersede any other provisions of local, state, or federal law. Current and future owners of the solar development must abide by this chapter.

However, this chapter will not apply to any electric utility, as defined by O.C.G.A. § 46-1-1, that is subject to the jurisdiction of the Georgia Public Service Commission, and such electric utilities are expressly exempt from the requirements of this chapter.

(Ord. of 11-6-2023(1)) Secs. 37-12—37-20. Reserved.

ARTICLE II. SOLAR ENERGY DEVELOPMENT

Sec. 37-21. Definitions.

The following words, terms, and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Solar energy system means the components and subsystems required to convert solar energy into electric or thermal energy, or to store such energy, including all equipment and accessory buildings.

Solar panel means a photovoltaic device capable of collecting and converting solar energy into electrical energy.

Solar project means a utility-scale, commercial solar energy system, the full size of which occupies five acres or more of land.

(Ord. of 11-6-2023(1)) Sec. 37-22. Jurisdiction and applicability.

This solar energy development ordinance shall apply where any portion of a solar project is, or is proposed to be, sited in any unincorporated area of Wayne County.

(Ord. of 11-6-2023(1)) Sec. 37-23. Standards for solar farms.

(a) The following minimum setback distances shall be required for all solar energy system components of a solar project (exclusive of fencing and vegetative screening):

(1) Three hundred feet from all dwelling units, except where the owner of a dwelling unit agrees to lessen such distance by executing a signed written waiver of this requirement;

(2) One hundred feet from all public right-of-way frontages; and

(3) Three hundred feet from all property boundaries other than right-of-way frontages, except for:

a. Property boundaries of adjacent tax parcels that are outside of 500 feet from a residential subdivision or part of a single solar project or a series of commonly owned solar projects must meet a 100 foot setback from all property boundaries other than right-of-way frontages; or

b. Property boundaries where the owner(s) of the applicable adjacent tax parcel(s) agree to lessen such distance by executing a signed written waiver of this requirement.

(b) Power inverters and other sound-producing equipment shall be sited no less than 300 feet from any dwelling unit in place at the time of construction or installation.

(c) All solar energy systems shall be completely enclosed with a minimum of six feet high chain link or security fencing, as measured from the finished grade of the fencing perimeter.

(d) Where existing visual buffers do not already exist, and at the discretion of the county, solar projects shall be constructed with evergreen vegetative screening or a privacy fence so as to help obscure solar energy system perimeters from dwelling units located within 300 feet of the solar energy system on adjacent parcels. At maturity, the vegetative screening shall not be less than 15 feet tall regardless of line-of-sight.

(e) Solar energy system height, which shall be measured from the highest finished grade below each solar panel to the top of that panel, shall not exceed and must be maintained at 18 feet.

(f) Clearing of natural vegetation shall be limited to that which is necessary for the construction, operation, and maintenance of the ground mounted solar photovoltaic installation and consistent with best practices for the preservation of natural areas or good husbandry of the land or forest.

(g) Any disturbed land shall be stabilized by a permanent seeding of perennial vegetation such as grass or other dense surface cover that will protect the soil surface from erosion, prevent sediment and runoff at the site from reaching downstream areas, and enhance the aesthetics of the site. It is recommended that a slow-growing, vegetative cover be utilized so that general maintenance of the growth can be kept to a minimum.

(h) The names of the manufacturers, installers, facility owners, and facility operators, and their addresses and phone numbers shall be posted on the required fencing at each entrance of a solar farm.

(i) Lighting of a solar farm and its accessory structures shall be limited to the minimum reasonably necessary for its safe operation and shall be reasonably shielded from abutting properties. Where feasible, lighting of a solar farm shall be directed downward and shall incorporate full cutoff fixtures to reduce light pollution.

(j) All solar farms shall comply with Wayne County ordinances including, but not limited to, setback and height requirements.

(k) All solar farms shall have a secure entry system at the primary entrance. The secure entry system shall comply with the specifications of the International Fire Code.

(l) All solar farms shall have a written emergency response plan that shall be approved by the county's code enforcement department, sheriff's office, fire department, and emergency management agency prior to start of operations. Each solar farm shall update its emergency response plan no later than January 1 of each year with a copy provided to all departments and agencies named in this subsection. The emergency response plan shall include the following:

(1) The phone number, email address, and street address for all manufacturers, installers, owners, and operators; and

(2) The phone number, email address, and mailing address for a representative of the solar farm responsible for responding to public inquiries; and

(3) The material safety data sheets that apply to any materials on the solar farm; and

(4) The clearly marked means and instructions for authorized staff to shut down the solar photovoltaic service.

(m) Any solar farm that has not been in use for a period of 180 consecutive days for its original purpose as approved by the county code enforcement department shall be deemed abandoned and shall not be authorized to recommence operations until code enforcement inspects the facility unless written notice has been provided to and accepted by code enforcement for nonoperation over 180 days. Code enforcement approval for nonuse over 180 days requires that the facility be maintained as such for future operations.

(n) Minimum acreage for solar projects. A solar project, as defined in section 37-21, shall occupy a contiguous land area of no less than 350 acres. This requirement applies exclusively to commercial solar energy systems and does not apply to solar installations designed for individual residential, agricultural, or non-commercial use.

(Ord. of 11-6-2023(1); Ord. of 1-6-2025(1), § I) Sec. 37-24. Permitting requirements.

(a) All proposals for new construction of, substantial enlargement of, and/or major alteration of solar projects shall require a development permit issued by the county (a "solar development permit"), which the county shall grant by right, subject to site plan review and decommissioning plan review.

(b) A solar project permit applicant shall submit a site plan to the county for review and approval.

The site plan shall include a map or maps prepared at a scale of not less than one inch to 100 feet and shall include:

(1) Name and address of the applicant or its authorized agent;

(2) Boundaries, exact dimensions and acreage of the tax parcel(s) to be built upon;

(3) Identification of the owners of all adjacent tax parcels;

(4) Location and dimensions of the solar energy system;

(5) A demonstration of compliance with all setback, screening and height requirements specified in section 17-23 above;

(6) Existing and proposed locations and dimensions of any utility lines, easements, drainage ways and public or private rights-of-way;

(7) Buildings and the locations of all structures, existing and proposed prior to issuance of building permit, drainage plans must meet soil erosion, sedimentation and pollution control ordinance;

(c) A solar project permit applicant shall submit a decommissioning plan to the county for review and approval. The decommissioning plan shall include, at a minimum:

(1) Defined conditions upon which decommissioning will be initiated (e.g. end of lease, condition of a potential public safety hazard, etc.);

(2) Removal of all non-utility owned equipment, conduits, structures, fencing, roads and foundations (and/or a written waiver signed by the property owner releasing the solar project developer from this requirement or a portion thereof);

(3) Restoration of the property to a condition prior to development of the solar project (and/or a written waiver signed by the property owner releasing the solar project developer from this requirement or a portion thereof);

(4) The timeframe and costs for completion of decommissioning activities; and

(5) A signed statement from the party responsible for completing the decommissioning activities acknowledging such responsibility.

(d) Within 15 business days of receiving the site plan and decommissioning plan, the county shall approve, approve with conditions (limited to those conditions necessary to ensure compliance with the setback, screening, and height requirements specified in this solar energy development ordinance), or disapprove the application due to failure to comply with the application requirements specified above.

The county shall notify the applicant in writing either that the application has been approved, approved with conditions, or disapproved, with the specific reasons for conditional or disapproval.

(Ord. of 11-6-2023(1)) Chapter 38

CRYPTOCURRENCY AND DATA MINING

Sec. 38-1. Purpose.

The purpose of this chapter is to establish definitions relating to cryptocurrency and data mining, to establish standards to protect the public health, safety, and welfare, and to avoid unintended impacts on resources and adjacent uses.

By enacting this chapter, it is the intent of Wayne County Government to enable the development of cryptocurrency mining and data centers, to the extent possible, in areas where any potential adverse effects on the community will be minimized.

(Ord. of 05-05-2025(1)) Sec. 38-2. Definitions.

Code enforcement officer means any person contracted with or employed by a state, county, or municipality who has enforcement authority for health, safety, or welfare requirements and is authorized to issue citations or file formal complaints regarding the same O.C.G.A. 36-74-21(1).

Commercial cryptocurrency mining means the commercial process by which cryptocurrency transactions are verified and added to the public ledger, known as the block chain, and also the means through which new units of cryptocurrencies are released through the use of server farms. Any equipment requiring a high-density load service, for the purposes of operating a cryptocurrency mining server farm, will constitute a commercial cryptocurrency mining operation.

Cryptocurrency means a digital currency in which encryption techniques are used to regulate the generation of units of currency and to verify the transfer of funds while operating independently of a central bank.

Cryptocurrency data center means leased or owned boundaries of floor space devoted to the operating data processing equipment for commercial cryptocurrency mining; excludes spaces for data centers not otherwise engaged in commercial cryptocurrency mining, commercial offices, storage, shipping and receiving, warehousing, or any other space that is not electronic processing.

Cryptocurrency server farm means three or more interconnected computers housed together in a single facility either air-cooled or water-cooled, whose primary function is to perform cryptocurrency mining or associated data processing.

Data mining means the commercial process by which volumes of data are analyzed to find patterns, discover trends, and gain insight into how the data can be used will constitute a commercial data mining operation.

High-density load service means any individual service at or above 600 amps in which the energy use intensity (EUI) is calculated as greater than 250 kWh/feet2 /year in total for all operating square footage.

(Ord. of 05-05-2025(1)) Sec. 38-3. Applicability.

(a) This chapter shall apply to all commercial cryptocurrency mining and data mining operations installed, constructed, or modified after the effective date of this chapter.

§ 38-3

(b) All commercial cryptocurrency and data mining operations shall be designed, erected, and installed following all applicable local, state, and federal codes, regulations, and standards.

(Ord. of 05-05-2025(1)) Sec. 38-4. Standards for commercial cryptocurrency mining operations.

(a) All principal and accessory structures used for cryptocurrency mining operations, server farms, and/or data mining centers, shall be arranged, designed, and constructed to be harmonious and compatible with the site and with the surrounding properties. If prefabricated, pre-engineered or modular structures are installed, the following standards are required:

(1) All structures shall have concrete foundations.

(2) All exterior facades shall have muted earth tone colors, and shall not be defective, decayed, or corroded.

(3) The use of cargo containers, railroad cars, semi-truck trailers and other similar storage containers for any component of the operation are prohibited.

(4) Minimum lot size: 2.0 acres

(5) Setbacks: 100 feet front, 100 feet sides, 100 feet rear

(b) The operators shall not cause, allow, or permit the operation of any source of sound which creates at an occupied residential building or defined sensitive receiver, as may exist at the time of the issuance of a certificate of completion or occupancy, a sound level that exceeds a daytime continuous sound level of 60 dBA or a nighttime continuous sound level of 50 dBA.

(c) The operators shall not cause, allow, or permit the operation of any source of sound or vibration which creates a pure tone where the one-third (1/3) octave band sound pressure level in the band of interest exceeds the arithmetic average of the sound-pressure levels for the two adjacent one-third octave bands by the corresponding decibel (dB(Flat)) values as follows:

(1) Five dB for center frequencies of 500 Hertz and above,

(2) Eight dB for center frequencies between and including 160 and 400 Hertz, and

(3) Fifteen dB for center frequencies less than or equal to 125 Hertz.

(4) A pure tone shall be deemed present by measurement.

For permitting and compliance purposes, measurements shall be performed using a calibrated type 1 sound level meter, configured to log and record one-third octave flat-weighted equivalent sound pressure levels, and A-weighted equivalent level (Leq), slow time weighting, with a 15-minute averaging interval.

Measurements shall be made proximate to, but no closer than, 100 feet from an occupied residential structure or other designated sensitive receiver. Transient background sounds must be excluded from the measurement period by post-processing or other means. Compliance is indicated if the noise solely generated by the operator cannot be discriminated from the equivalent-continuous background sound pressure level, or if the noise levels solely generated by the operator otherwise conform to the requirements of subsections (c) and (d).

(d) Prior to the issuance of a certificate of completion or occupancy, a report with noise level test results shall be submitted for approval by the applicant from a noise control engineering professional for the purpose of demonstrating compliance. The expense for testing and reporting the results, in written format, to the county will be the responsibility of the applicant.

(e) A noise reduction barrier or device may be required at the discretion of the county when it is conclusive that noise level tests do not conform to subsections (c) and (d). If this is required of the applicant or facility, the expense of compliance shall be the applicant's and not the county's.

(f) Terminology as used herein related to acoustic levels and measurements follow American National Standard ANSI S12.9: "Quantities and Procedures for Description and Measurement of Environmental Sound - Part 1: Basic Quantities and Definitions," and ANSI S12.9: "Quantities and Procedures for Description and Measurement of Environmental Sound. Part 3: Short-term measurements with an observer present".

(g) All servers, computers, processers, materials, and equipment must be enclosed within buildings.

These buildings will be subject to commercial design standards.

(h) The equipment used in any commercial cryptocurrency mining operation shall be housed in a metered (either individually or collectively in primary-metered services), electrically grounded, and pre-engineered metal-encased structure with a fire rating designed to resist an internal electrical fire for at least 30 minutes. The containment space shall contain baffles that will automatically close in the event of fire independent of a possible electric system failure.

(i) Prior to issuance of a building permit, the applicant shall provide written verification from the power provider (Georgia Power or Satilla EMC) that the applicant has calculated the maximum potential electrical consumption of the proposed use and has verified the utility supply equipment and related electrical infrastructure is sufficiently sized and can safely accommodate the proposed use during the power provider's peak consumption hours.

(j) Power shall only be provided by either Georgia Power or Satilla EMC. No use of alternative power, such as solar, wind, or hydro, is permitted, whether on-site or off-site.

(k) Any use or activity producing air, dust, smoke, glare, exhaust, heat, or humidity in any form shall be carried on in such a manner that it is not perceptible at or beyond the property line.

(l) A security fence with a minimum height of eight feet must be installed around the perimeter of the server farm building. Each commercial cryptocurrency mining and data mining operation shall provide a 24-hour emergency contact signage visible at the access entrance. Signs shall include company name if applicable, owner/representative name, telephone number, and corresponding local power company and telephone number.

(m) No facade of any commercial cryptocurrency mining operation shall have more than 20 percent of the area exposed with apparatus (e.g., vents, fans, HVAC systems, etc.).

(n) An active clean agent fire protection system must be provided and maintained in good working order within any structure which contains a server farm. High sensitivity smoke detectors should be installed and operational in order to activate the clean agent fire suppression system.

§ 38-4

(o) There shall be an emergency electrical termination switch installed outside of any containment structure which contains a server farm. The switch shall be appropriately signed so that responding public safety officials can quickly identify it. (p) The equipment used in any server farm shall be housed in an individually metered, electronically grounded structure with a fire rating designed to resist an internal electrical fire for at least 30 minutes. The containment space shall contain baffles that will automatically close in the event of fire independent of a possible electric system failure.

(q) All building requirements required by this section, including, but not limited to, heat transfer apparatuses, fire detection/suppression systems, or containment structures shall be designed by a State of Georgia licensed engineer and in accordance with all applicable codes and standards.

(r) The ambient temperature inside of a containment space which houses a server farm shall not exceed 120 degrees Fahrenheit at any time. No person shall be permitted to regularly inspect and work within the containment area which houses a server farm if the ambient temperature within the containment area exceeds 90 degrees Fahrenheit.

(s) Any server farm shall ensure that no more than 20 percent of the heat dissipated by the mining activity shall be released directly to the outside when the average daily temperature is less than 40 degrees Fahrenheit.

(t) All requirements of section 38-4 must be maintained after the issuance of a certificate of occupancy. Any violation of such will be handled in accordance with section 38-6.

(Ord. of 05-05-2025(1)) Sec. 38-5. Application and approval.

No commercial cryptocurrency or data mining operation may be developed without site plan review and verification by the planning and zoning department that all requirements within this chapter are met.

(Ord. of 05-05-2025(1)) Sec. 38-6. Violations.

(a) Any section of this chapter that is not followed constitutes a violation. Each incident is a separate violation such that multiple violations may occur on the same date and subsequent dates.

(b) The code enforcement officer has the discretion to issue a warning or a citation on a case-by-case basis.

(c) Any violation shall have a maximum punishment not to exceed a fine of $1,000.00 per each day of a continuing violation, imprisonment for 60 days, or both.

(Ord. of 05-05-2025(1)) Sec. 38-7. Effectiveness, interpretation, separability.

(a) This chapter shall become effective immediately upon its adoption.

(b) All ordinances, or parts of ordinances, in conflict herewith are replaced.

(c) If any part of this chapter conflicts with any other applicable federal, state, or local regulation, the more restrictive regulation shall control.

(d) If any section, clause, portion or provision of this chapter is found unconstitutional, such invalidity shall not affect any other portion of this chapter.

(Ord. of 05-05-2025(1)) § 38-7 Chapter 39

DATA CENTERS

Sec. 39-1. Purpose.

The purpose of this chapter is to establish definitions relating to data centers, to set standards that protect the public health, safety, and welfare, and to mitigate potential adverse impacts on natural resources, infrastructure, and adjacent land uses, including, but not limited to, water supply, electrical grid capacity, noise, and environmental quality.

By enacting this chapter, it is the intent of the Wayne County Government to facilitate the orderly development of data centers as an economic driver, providing jobs, tax revenue, and technological infrastructure, while ensuring that such facilities are sited, designed, and operated in a manner compatible with the rural and community character of Wayne County. This chapter draws upon best practices for sustainable data center operations, including energy and water efficiency metrics, and aligns with proposed Georgia Department of Community Affairs rules for Development of Regional Impact (DRI) reviews, which require disclosure of energy and water demands for facilities exceeding 300,000 square feet in urban/suburban areas or 500,000 square feet in rural areas.

(Ord. of 01-05-2026(2)) Sec. 39-2. Definitions.

Code enforcement officer means any person contracted with or employed by a state, county, or municipality who has enforcement authority for health, safety, or welfare requirements and is authorized to issue citations or file formal complaints regarding the same, per O.C.G.A. § 36-74-21(1).

Data center means a facility or group of buildings primarily devoted to the housing, operation, and maintenance of computer servers, storage devices, and related equipment for the electronic storage, processing, management, and dissemination of data, including cloud computing, artificial intelligence training, and enterprise IT operations. This excludes cryptocurrency mining operations (governed by chapter 38), residential-scale server installations, telecommunications facilities, or incidental data processing in non-data center uses such as offices or warehouses.

High-density data center means a data center requiring a high-density load service, defined as any individual electrical service at or above 600 amps where the energy use intensity (EUI) exceeds 250 kWh/square foot/year across the total operating floor area.

Water Usage Effectiveness (WUE) means the ratio of total annual water consumption (in liters) to total annual IT equipment energy consumption (in kWh), as defined by The Green Grid, with a target of less than 1.8 L/kWh (equivalence 0.476 gal/kWh) for compliance.

(Ord. of 01-05-2026(2)) Sec. 39-3. Applicability.

(a) This chapter shall apply to all data centers installed, constructed, or substantially modified (defined as an expansion increasing floor area by 50 percent or more) after the effective date of this chapter.

(b) All data centers shall be designed, erected, and installed in compliance with applicable local, state, and federal codes, regulations, and standards, including Georgia's proposed DRI rules for technological facilities requiring disclosure of projected energy and water demands.

§ 39-3

(c) Data centers exceeding DRI thresholds (175,000 square feet in non-metropolitan areas) shall undergo state-level review coordinated with the Coastal Georgia Regional Development Center.

(Ord. of 01-05-2026(2)) Sec. 39-4. Standards for data centers.

(a) Siting and design standards. All principal and accessory structures shall be arranged, designed, and constructed to harmonize with the site and surrounding properties. Prefabricated, pre-engineered, or modular structures are permitted subject to the following:

(1) All structures shall have permanent concrete foundations.

(2) Exterior facades shall use muted earth-tone colors and shall be free of defects, decay, or corrosion.

(3) Use of shipping containers, railroad cars, semi-truck trailers, or similar temporary storage units is prohibited.

(4) Data centers shall be located only on sites that meet the following criteria to ensure compatibility with surrounding land uses:

a. Minimum parcel size of 50 acres unless a variance is granted by the board of commissioners upon demonstration of no adverse impacts to infrastructure or natural resources.

b. At least 1,500 feet from the boundary of any existing residential dwelling or subdivision.

c. At least 1,000 feet from schools, places of worship, hospitals, or public parks.

d. Outside of any FEMA-designated Special Flood Hazard Area (100-year floodplain).

e. With direct access to a state or federal highway or county road capable of accommodating heavy truck traffic, as determined by the county engineer.

f. Not within one mile of a municipal boundary unless coordinated with the adjacent municipality.

(5) Setbacks. One hundred feet from front property lines; 100 feet from side and rear property lines;

200-foot vegetated buffer from any occupied residential property.

(6) Maximum building height: 80 feet, unless approved via special exception with FAA clearance.

(7) Floor area ratio (FAR): Not to exceed 0.5.

(b) Noise standards. Operators shall not cause or permit noise exceeding 60 dBA (daytime, 7:00 a.m.

to 10:00 p.m.) or 50 dBA (nighttime, 10:00 p.m. to 7:00 a.m.) at the nearest occupied residential building or sensitive receiver (e.g., schools, hospitals).

(c) Vibration and pure tone standards. No operation shall produce vibration or pure tones exceeding the thresholds in section 38-4(c) of this Code, measured per ANSI S12.9 standards at least 100 feet from sensitive receivers.

(d) Noise compliance testing. Prior to certificate of occupancy, submit a report from a licensed noise control engineer demonstrating compliance, using Type 1 sound level meters with 15-minute averaging.

Costs borne by applicant. Barriers or mitigation devices may be required at county discretion.

(e) Water usage standards.

(1) Data centers shall achieve a WUE of no more than 1.8 L/kWh, verified annually.

(2) Preference for closed-loop cooling systems or non-potable/recycled water sources, no discharge of cooling water into public sewers without treatment.

(3) Prior to permitting, provide verification from the state issue permitting (EPD) that the facility will not impair local water supply during droughts or peak demand, including projected annual consumption.

(4) Best practices. Use recycled water where available; return heated water to source; monitor usage correlated with ambient temperature and IT load.

(f) Electrical and energy standards.

(1) Prior to building permit, submit written verification from Georgia Power or Satilla EMC confirming sufficient grid capacity for peak-hour demands, including redundancy for outages.

(2) Disclose projected annual energy use and commit to renewable energy sourcing (e.g., via power purchase agreements) targeting 100 percent renewables by 2030, per industry benchmarks.

(3) All equipment shall be housed in electrically grounded structures with fire-rated enclosures (minimum 30-minute resistance) and automatic fire baffles.

(g) Environmental and sustainability standards.

(1) For facilities over 100,000 square feet, submit an environmental impact assessment (EIA) evaluating water withdrawal, energy demands, stormwater runoff, and carbon emissions, prepared by a licensed professional.

(2) No emissions (air, dust, smoke, glare, heat, humidity) perceptible beyond property lines.

(3) Encourage air-cooled systems where feasible to minimize water use; limit direct heat exhaust to 20 percent of total dissipation when ambient temperatures are below 40°F.

(h) Fire safety and emergency standards.

(1) Install active clean-agent fire suppression systems with high-sensitivity smoke detectors.

(2) Provide an exterior emergency electrical termination switch, clearly signed for public safety access.

(3) All designs by Georgia-licensed engineers, per applicable codes.

(i) Security and operations.

(1) Install an eight-foot security fence around the perimeter.

(2) Display 24-hour emergency contact signage at entrances, including owner, phone, and utility contacts.

(3) Enclose all servers and equipment within buildings; no more than 20 percent of any facade exposed to apparatus (e.g., vents, HVAC).

§ 39-4

(4) Ambient internal temperature shall not exceed 120°F; worker access is prohibited above 90°F without protection.

(j) Traffic and parking. Base parking on submitted staffing plans (typically one space per five employees); construction phasing plans required to minimize disruption.

(k) All standards in section 39-4 shall be maintained post-occupancy; non-compliance subject to section 39-6.

Sec. 39-5. Application and approval.

No data center may be developed without site plan review and approval by the planning department, verifying compliance with this chapter and State DRI requirements. Applications shall include disclosures of energy/water demands, EIA (if applicable), engineering certifications, and mitigation plans.

Public hearing required for special exceptions.

(Ord. of 01-05-2026(2)) Sec. 39-6. Violations.

(a) Violation of any provision constitutes an infraction; each day or incident is separate.

(b) Code enforcement officer may issue warnings or citations case-by-case.

(c) Penalties. Fine up to $1,000.00 per day for continuing violation, imprisonment up to 60 days, or both.

Sec. 39-7. Effectiveness, interpretation, separability.

(a) Effective immediately upon adoption.

(b) Repeals conflicting ordinances.

(c) More restrictive federal/state/local regulation controls in conflicts.

(d) Invalidity of any provision does not affect the remainder.

(Ord. of 01-05-2026(2)) Sec. 37-25 Decommissioning.

(a) No later than the end of the fifth full year of the solar project's operation, and every five years thereafter that the solar project remains in operation, the solar project permit holder shall:

(1) Reevaluate decommissioning costs for the solar project; and

(2) Provide to the county security sufficient for such decommissioning costs in the form of a new or modified guaranty to ensure the availability of funds for such costs. The guaranty shall be from an entity having (1) at the time of delivery of such guaranty, a senior unsecured long-term debt rating of BBB- or better from Standard and Poor's and Baa3 or better from Moody's; or (2) audited financial statements, prepared by a nationally-recognized firm of independent auditors and indicating a financial net worth of at least $10,000,000.

(b) Upon failure to accomplish the provisions in the decommissioning plan, the land owner must file a claim on the bond and decommission the project.

(Ord. of 11-6-2023(1)) Sec. 37-26. Severability.

Should any section or provision of this solar energy development ordinance be determined by a court of competent jurisdiction to be unconstitutional or invalid, such determination or decision shall not affect the validity of the solar energy development ordinance as a whole, or a part thereof, other than the part so declared to be unconstitutional or invalid.

(Ord. of 11-6-2023(1))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:wayne-county/code/whole@2025-08-04-92f6f7dcbe

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.