Skip to content
Georgia Commons
Menu

White County · Code of Ordinances

White County Code of Ordinances

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, current through 2026-06-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Part 9 of 9. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

d. In addition to utility, street, grading and erosion control plans, the administrative officer and/or director of public works may require a hydrological study or other engineering studies as may be necessary, depending upon the scope and extent of the development project.

Section 509. Review and approval of development plans.

Upon receipt of the completed development plans by the administrative officer, he or she shall transmit for review and comment a copy of the development plan to the county plan review committee if required. The approval for development plan shall be per the requirements of the plan review committee and this resolution.

Section 510. Issuance of development permit.

Upon approval or conditional approval of a development plan, the administrative officer shall issue a development permit. Issuance of a development permit shall constitute authorization for the applicant to begin land-disturbing activities and the construction of improvements.

Section 511. Application for final plat approval.

In the case of a subdivision, after approval of a preliminary plat and upon completion of required improvements, the subdivider may then submit an application for final plat approval. Said application shall meet the requirements for final plat applications as specified in table 5.1, the final plat shall meet the specifications for final plats shown in table 5.2., and as required by the county development guide.

Section 512. Final plat specifications and certificates.

The final plat shall be drawn to comply with the specifications in table 5.2 for final plats.

Certificates shall be included on the final plat, as follows:

1. Final surveyor's certificate: An engineer's or surveyor's certification, directly on the final plat as follows:

"It is hereby certified that this plat is true and correct and was prepared from an actual survey of the property by me or under my supervision; that all Boundary markings shown thereon actual exist or are marked as 'future' and their location, size, type and material are correctly shown; and that all engineering requirements of the Land Subdivision Regulations of White County, Georgia, have been fully complied with.

Registered C.E. No.

or Registered Georgia Land Surveyor No.

or County Surveyor"

2. An owner's certification, directly on the final plat, as follows:

"Owner's Certificate" State of Georgia, County of White.

The owner of the land shown on this plat and whose name is subscribed hereto, in person or through a duly authorized agent, certifies under oath that this plat was made from an actual survey, that all State and County taxes or other assessments now due on this land have been paid, and that all State of Georgia statutory and regulatory requirements for water supply and sewage management have been met.

Owner _______________________________ Date _________________________________ Agent ________________________________ Date _________________________________ Subscribed and sworn to in my presence this day of ,

20 .

Notary Public Commission exp.: "

3. Certificate of approval:

FINAL PLAT APPROVAL

The administrative officer of White County, Georgia, certifies that this plat complies with the Subdivision and Land Development Regulations of White County, Georgia, and that this plat is hereby approved and released for recording purposes.

Administrative Officer, White County Date:

Section 513. Action on the final plat.

Upon receipt of a complete final plat application, the administrative officer may transmit for review and comment a copy of the plat to applicable review agencies. The administrative officer shall have ten working days to approve or disapprove of the plat. The administrative officer may grant final plat approval if the following conditions, as applicable, are met:

a. A preliminary plat of the proposed subdivision, if required, has been previously approved by the planning commission.

b. Where new improvements are involved in the subdivision, development plans have been approved by the plan review committee.

c. The final plat meets all applicable requirements of this resolution.

d. A complete final plat application has been submitted, including all supporting materials required by this resolution for final plats.

Final plats and applications that meet the above-referenced conditions shall be considered a ministerial action by the administrative officer. Denial of a final plat shall be permitted only upon specific findings that one or more of the above-referenced conditions have not been met.

If said plat is in conformance with the preliminary plat and is approved by the plan review committee, the signature of the administrative officer shall be placed on the reproducible film digital copy or original of the plat.

(Res. No. 2024-09, 6-3-24) Section 514. Recording of final plats.

Upon approval and without undue delay, the administrative officer applicant or designated representative shall have approved final plats recorded in the records of the clerk of the superior court of the county, and a time-stable reproducible film digital copy or original shall be filed in the office of the administrative officer. Recording fees shall be included in the fee charged for final plats and therefore paid by the county. Recording fees shall be paid by the applicant or designated representative at the time of plat recording to the clerk of superior court. The clerk of the superior court shall indicate on the filed copy, the book and page number in the county records where the final plat is recorded. Recordation of a final plat constitutes approval to begin the sale or transfer of subdivision lots.

In addition to the requirements of this development code for the submission of printed copies, as-built data drawings and all final plats approved for recordation shall be submitted to the planning director in a digital format as follows:

1. Digital drawing files shall be submitted in AutoCAD DWG or DXF format and shall include:

a. Final plat as approved.

b. Model space drawing of the engineering plans, reflecting any changes approved by the county.

2. The DXF or DWG file shall have data divided into the following distinct and separate layers:

a. Parcel lines (PL)

b. Right-of-way (ROW)

c. Boundary (BL)

d. Water lines (WL), when available

e. Sewer lines (SL), when available

f. Electrical lines (EL), when available

g. GPS Monuments, when required or available. A digital index spreadsheet in a Microsoft Excel compatible format must also be provided of the pipe chart.

3. In engineering plans, line and arc data must be unbroken where appropriate, such as no breaks in intersecting lot lines at corner pins and no breaks in utility lines.

4. The projection shall be in Georgia State Plane West Coordinate System North American Datum 1983.

5. Control shall be indicated.

6. Such additional information or requirements as may be established by the county GIS administrator necessary to convert the DXF or DWG file to ArcGIS format.

(Res. No. 2024-09, 6-3-24) Section 515. Lot combinations and boundary line adjustments.

Boundary line adjustments. One or more existing lot lines forming boundaries between conforming platted lots located within the same subdivision, or one or more lot lines between abutting lots may be adjusted through a final plat revision process that requires the approval of the administrative officer and recording of a plat meeting the specifications of a final plat. In the case no final plat applies to the subject lots or parcels, a boundary survey and plat of the entire lots involved in the boundary line adjustment shall be required to be approved by the administrative officer and recorded. Such plat showing said boundary line adjustment shall be titled with the same name as that of the original subdivision and shall include thereon that the replat is for the purpose of adjusting the lot lines between specific lots.

Lot combinations. An existing lot line forming the boundary between two conforming platted lots located within the same subdivision or a lot line between lots or parcels that have merged, by the developer, to form one building lot may be removed or eliminated through a final plat revision process which conforms to the final plat requirements of this resolution. Where separate parcels or lots of land are proposed to be combined, they shall be submitted to the administrative officer as a final plat for review, approval and recording. In the case where no recorded final plat applies to the subject lots or parcels, a boundary survey and plat depicting all lots involved in the lot combination shall be required to be approved by the administrative officer and recorded as a final plat. Such combination plat shall be titled with the same name as that of the original subdivision, if applicable, and shall indicate thereon that the replat is for the purpose of removing the lot lines between specific lots.

ARTICLE 6. DESIGN REQUIREMENTS FOR STREETS

Section 601. Access.

Every subdivision shall be accessed by a public street, or a previously approved access of at least a 30-foot right or way or easement. This may include the extension of previously approved subdivision streets.

The exception shall be easements for intra-family purposes, as by sworn affidavit stating the divided property shall be for family use only. If the property ceases to be occupied by family, the property shall conform to the existing subdivision regulations. In such intrafamily cases where an easement is requested, an easement with a 30-foot minimum width is required and shall not exceed access to more than 3 parcels without Planning Commission approval. The planning department may impose additional design requirements for the easement road should public safety or environmental concerns be present.

If the administrative officer finds that inadequate access exists, the subdivider's remedy is to pursue the proper access to the subdivision by upgrading the access road to the subdivision. This shall require improving the access to current county road standards. In such cases of inadequate access, street or access improvements are required. A preliminary plat for the subdivision shall be required, regardless of the number of lots. Where existing streets serving the subdivision are inadequate to serve the additional traffic, the administrative officer shall not approve the subdivision unless adequate access provisions are provided by the subdivider.

(Res. No. 2025-01, 1-27-25) Section 602. Lot frontage.

Each lot shall abut upon a public street or an approved subdivision street and at a minimum, have 60 feet of lot frontage. In the case of a lot fronting on and accessed by a cul-de-sac, the minimum lot frontage may be reduced to 35 feet. Double or reverse frontage lots are required to have proper frontage on all sides that could be used as access.

Section 603. Continuation of existing streets.

Existing streets shall be continued at the same or greater width, but in no case less than the required width, when new streets are constructed.

Section 604. Street names.

Street names shall be reviewed for correct usage and reasonable meanings consistent with the language used and are subject to the approval of the GIS/mapping department.

Section 605. Street alignment, intersections, and jogs.

Streets shall be aligned to join with planned or existing streets. Under normal conditions, streets shall be laid out so as to intersect as nearly as possible at right angles (90 degrees), but in no case shall such a street intersection be less than 75 degrees. Where street offsets or jogs cannot be avoided, offset "T" intersections shall be separated by a minimum centerline offset of 300 feet.

Section 606. Development along arterial street or limited access highway.

Where a subdivision abuts or contains an arterial street or a limited access highway, the administrative officer may require a street approximately parallel to and on each side of such right-of-way as a marginal access street, from which the lots shall be accessed instead of the arterial street or limited access highway. In such cases, the administrative officer shall require a ten-foot-wide, no-access easement planted to prohibit travel across it.

Section 607. Alleys.

Alleys may be required at the rear of all lots used for multi-family, commercial or industrial developments. Alleys may be provided in one or two-family residential developments.

Section 608. Street right-of-way and pavement widths.

Street right-of-way and pavement widths shall at minimum meet the following:

Street Right-of-Way, Pavement, and Improvement Requirements Smaller rights-of-way and roadways may be approved by the planning commission in mountain and hillside protection areas to reduce the amount of clearing and land disturbance. (Private shared Roadway with one to five lots may be graveled if grade is 12 percent or less.)

Street Type Service Standard Minimum Right-Of-Way Width (Feet) Minimum Pavement/Gravel Width (Feet) Number of Lots Pavement Type Private shared roadway Rural and residential 30 18 1—5 Gravel/triple surface Private shared roadway Rural and residential 30 18 pavement 6—9 Triple surface

PRIVATE SHARED ROADWAY TYPICAL SECTION

PAVED OR GRAVEL ROAD

Roads shall be crowned, or pitched, to promote drainage of surface water from the road into roadside ditches to minimize the detrimental effects of water.

Ditches are essential for proper drainage and shall be designed and provided to handle total volume and velocity of water for the particular road location, as approved by the director of public works.

Section 609. Turnarounds.

Streets that dead-end shall terminate in a cul-de-sac or other approved turn-around.

Type of Turnaround Required Pavement/Gravel (Feet) Required Right-of-Way (Feet) Cul-de-sac, no center island 26' radius 35' radius Section 610. Street grades.

Maximum and minimum street grades shall be as follows:

a. Local streets and dead-end streets and alleys, not in excess of 15 percent.

b. No street grade shall be less than one percent.

Section 611. Horizontal curvature.

The minimum radii of centerline curvature shall be as follows:

a. Secondary streets, 200 feet.

b. Local streets and dead-end streets and alleys, 100 feet.

Section 612. Tangents.

Between reverse curves, there shall be a tangent having a length not less than the following:

a. Minor streets and dead-end streets and alleys, 50 feet.

Section 613. Vertical alignment.

Vertical alignment shall be such as per specifications of the public works department.

Section 614. Curb-line radius.

The curb-line radius at street intersections shall be at least 30 feet. Where the angle of street intersection is less than 90 degrees, a longer radius may be required. For commercial and industrial subdivision streets, a minimum 40 foot curb-line radius shall be provided.

Section 615. Right-of-way clearance.

All trees, brush, stumps, rocks, or other debris shall be cleared from the road bed, including shoulders, or as may be required by the director of public works; provided, however, that the administrative officer may recommend preservation of trees and major rock outcroppings within the right of-way as may be appropriate to preserve the rural character of the subdivision or land development.

Section 616. Grading of streets.

All streets shall be graded to the lines, grades, and cross-sections as shown on approved the plans.

Section 617. Street paving and base.

Base and sub-base shall be installed on public and private streets and for driveways connecting to public streets in compliance with specifications of the director of public works.

All boulders, organic material, soft clay, spongy material or similar problematic material shall be removed from the street subgrade and replaced with approved material.

The base course shall consist of graded aggregate of a minimum compacted thickness of six inches compacted to 95 percent and in conformity with the lines, grades and typical cross-sections as shown on the drawings approved by the director of public works. Engineers can submit alternative pavement designs for approval by the director of public works. All base course material shall be deposited and spread by means of spreader boxes, approved mechanical equipment, or from moving vehicles equipped to distribute the material in a uniform layer as approved by the director of public works.

Rolling shall be accomplished with a smooth wheel power roller weighing seven to ten tons, or an equivalent equipment approved by the director of public works. Rolling shall progress gradually from the sides to the center, parallel with the centerline of the street and lapping uniformly each preceding track one half the width of such track, and shall continue until all the surface has been rolled. No base material shall be deposited or shaped when the subgrade is frozen or thawing or during unfavorable weather conditions.

Section 618. Street signs.

Street signs shall be furnished and installed at all street intersections on the rights-ofway by the developer and shall meet specifications of the director of public works which unless otherwise adopted shall be green "scotchlite" with white legends mounted on ten-foot round posts. Exact locations shall be approved by the director of public works prior to installation. Subdividers shall also be responsible for installing all traffic control signs required by the director of public works, including speed limits signs and stop signs.

Alternate or thematic color street signs that follow a specific subdivision theme may be allowed with the approval of the director of public works and 911 Director.

Section 619. Street right-of-way improvements.

All street rights-of-way outside of the paved portions shall be graded to conform to the approved cross section and shall be soiled and grassed with a material acceptable to the director of public works.

The director of public works may require that drainage facilities be installed to provide a stable subsurface and base for fills and base course construction over wet weather springs, soft spots, and other unstable soils. The director of public works may require the subdivider or land developer to submit a soil analysis and drainage design performed by an engineering firm.

Section 620. Deceleration lanes.

For subdivisions or land developments accessing state routes, the state department of transportation may require the installation of deceleration lanes.

The director of public works may require the installation of a deceleration lane for a distance of 100 feet and a 50-foot taper from all project entrances serving commercial and industrial subdivisions. For all commercial properties, if an acceleration/ deceleration lane is not required, the subdivider or land developer may be required to construct a wide entrance according specifications of the director of public works.

Section 621. Improvements to abutting streets.

For subdivisions and land developments that abut and access an abutting public street, the subdivider or land developer shall install road improvements according to standards and specifications of the director of public works along all abutting streets.

When a subdivision or land development uses or proposes to use an unpaved public right-of-way for access, the subdivider or land developer shall dedicate right-of-way and improve that right-of-way to right-of-way and pavement widths consistent with county street design standards.

Section 622. Residential driveways.

All entrances or exits of any driveway from or to any state or federal highway shall be subject to the approval of the state department of transportation.

Section 623. Nonresidential driveways.

All entrances or exits of any driveway from or to any state or federal highway shall be subject to the approval of the state department of transportation.

ARTICLE 7. PRIVATE STREETS

Section 701. Private streets permitted.

Private streets are permitted within subdivisions, subject to the requirements of this article. Applications for approval of private streets shall be considered by the planning commission. Following a recommendation by the administrative officer and director of public works, the planning commission shall consider the application and may impose conditions on the approval of private streets to ensure various public purposes and to mitigate potential problems with private streets. No final plat involving a private street shall be approved unless said final plat conforms to the requirements of this article.

Section 702. Engineering plans required.

It shall be unlawful for any person, firm, or corporation to construct a new private street or alter an existing private street or to cause the same to be done without first obtaining approval of development plans and securing a development permit from the administrative officer and approval by the director of public works in accordance with the requirements of this resolution.

Section 703. Standards for private streets.

All private streets shall be constructed to standards as specified in article 6 of this resolution.

Section 704. Street names and signs.

Private streets shall be named, subject to the approval of the administrative officer and 911 coordinator. The subdivider of land involving a private street shall install street signs with content containing the street name as approved by the director of public works. The sign signifying the private street may be required by the director of public works to be a different color than that of street signs provided for public streets, or designated "private" in order to distinguish maintenance responsibilities in the field.

Section 705. Rights-of-ways.

Rights-of-way for private streets shall be designated on final plats as access for purpose of public safety access and utility rights-of-ways, along with the name of said private street.

Rights-of-way for private streets shall not be included in any calculation of minimum lot size established by this resolution or any other county resolution. In the cases of private streets, the right-of-way for the private street shall be drawn as its own discrete parcel to be dedicated to a private homeowners association (i.e., not shown to be a part of any lot).

Section 706. Maintenance.

The county shall not maintain, repair, resurface, rebuild, or otherwise improve streets, signs, drainage improvements or any other appurtenances within rights-of-ways established for private streets. A private maintenance agreement shall be required to be included in the protective covenants and recorded with the county clerk of the superior court shall be required for any private street and other improvements within rights-of-ways established for private streets.

ARTICLE 8. DESIGN REQUIREMENTS FOR BLOCKS AND LOTS

Section 801. Block lengths and widths.

Intersecting streets shall be provided at such intervals so as to provide adequate cross traffic and connectivity. Blocks in residential subdivisions should not exceed 1,800 feet nor be less than 600 feet in length, except where topography or other conditions justify a departure from these standards. In blocks longer than 800 feet, pedestrian ways and/or easements through the block may be required by the administrative officer near the center of blocks.

The width of the block shall normally be sufficient to allow two tiers of lots of appropriate depth. Blocks intended for business or industrial use shall be of such width as to be considered most suitable for their respective use, including adequate space for off-street parking and deliveries.

Section 802. Lot width and size.

Residential lots shall have a minimum depth of 100 feet and minimum width of 100 feet each.

The minimum lot area for a residential lot shall be:

a. 43,560 square feet.

Provided, however, that where flood plain, water course, wetland, soil, slope and other conditions require it, and as further required by the county health department or any other applicable resolution of the county. No more than one single-family dwelling per tract with density of one dwelling per acre with planning department approval. Single-family exceptions may be allowed for intra-family dwellings with the approval of the planning department by sworn affidavit stating the dwelling shall be for family use only. If the dwelling ceases to be occupied by family, the property shall conform to the existing subdivision regulations. Residential corner lots shall have adequate width to meet building setback requirements from both abutting streets. Residential corner lots shall have adequate width to meet building setback requirements from both abutting streets.

Commercial and industrial or other nonresidential lots shall be adequate to provide service areas and off street parking suitable to use intended. The minimum lot size for such lots shall be 43,560 square feet without public sewer, or a minimum of 21,780 square feet with public sewer and public water, or greater where soil, slope or other conditions require it, and as further required by the health department. Where individual septic tanks are used, the county health department shall approve minimum lot sizes to conform to health standards of the state.

Each lot shall contain an adequate building site not subject to flooding and outside the limits of any existing easements or required yards/building setback lines.

(Res. No. 2017-02, 1-9-17; Res. No. 2025-02, 1-27-25) Section 803. Lot lines.

All lot lines shall be perpendicular or radial to street lines, unless not practicable because of topographic or other features.

Section 804. Building lines.

A building line shall be established on all lots. There shall be building setback lines for principal buildings of 15 feet from all property lines.

Section 805. Flag lots.

Intent. Flag lots, as defined in this resolution, are strongly discouraged. However, subdivisions designed with one or more flag lots may be approved

Denial if reasonable alternative exists. The administrative officer shall have due cause to deny any plat that proposes any flag lot, when a reasonable alternative to such lot pattern is possible.

a. Panhandle (flag pole) length and width restriction. If permitted, no flag lot shall be allowed to be platted that has a "panhandle" portion of less than the required frontage for that lot. (i.e., portion that does not meet the required lot width) and that is more than 400 feet in length.

Section 806. Lot remnants not permitted.

All remnants of lots below any minimum lot size which may be required, left over after subdividing of a larger tract, must be added to adjacent lots, rather than allowed to remain as unusable parcels. The administrative officer may permit a lot remnant for a specific purpose such as a detention pond, provided that access and design is appropriate and the lot remnant is restricted to specific non-building use.

Section 807. Monuments.

For all subdivisions, a state-registered land surveyor shall install permanent survey monuments at all property corners and land lot lines, prior to final plat approval. Lot corners shall be marked with metal rods not less than one-half inch in diameter and 18 inches in length and driven so as to be stabilized in the ground. Permanent survey monuments shall also be installed in accordance with the most recent edition of section 180-7-.05, monument of the Rules of State Board of Registration for Professional Engineers and Land Surveyors and the Georgia Plat Act (O.C.G.A. 15-6-67).

ARTICLE 9. STORM DRAINAGE AND UTILITIES

Please refer to county subdivision regulations.

ARTICLE 10. ADMINISTRATIVE AND LEGAL STATUS PROVISIONS

Section 1001. Administration and interpretation.

The administrative officer shall administer and interpret the provisions of this resolution.

Section 1002. Fees.

The fees for various applications required by this resolution shall be as follows:

Preliminary plat: $100.00 plus $5.00 per lot.

Final plat: $100.00 plus $5.00 per lot, plus $8.00 per page recorded.

Variance: $100.00.

Administrative appeal: $100.00.

Section 1003. Additional specifications.

The director of public works is hereby authorized to prepare and recommend standard drawings and constructions specifications for private and public improvements not specified in this resolution. Upon their adoption by the county board of commissioners, they shall become mandatory.

Section 1004. Variances.

Please refer to White County Municipal Code, appendix A, section 1204.

Section 1005. Inspection.

Please refer to White County Municipal Code, appendix A, section 1206.

Section 1006. Enforcement.

Please refer to White County Municipal Code, appendix A, section 1205.

Section 1007. Intra-family land transfer.

Division means the splitting up of property into five or less parcels, which does not involve the construction of a public street to serve the parcels created.

Family member means a child, grandchild, parent, grandparent, brother, sister, aunt, uncle, niece or nephew.

Intra-family land transfer means the division and conveyance of the ownership of land to a "family member" the purpose of which is not to sell or resell to persons not defined as a family member or to circumvent the provisions of this appendix and the applicant so states by sworn affidavit.

Section 1008. Amendment.

This resolution may be amended. Before enacting such amendment, the planning commission shall provide a recommendation on the proposed amendment. The county board of commissioners shall hold a public hearing thereon, notice of which shall be published at least 15 days prior to such hearing in a newspaper of general circulation in the county.

Section 1009. Miscellaneous provisions.

Please refer to White County Municipal Code, appendix A, section 1209.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:white-county/code/whole@2026-06-08-60b9df6365

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.