--- title: Whitfield County Code of Ordinances, Sec. 14-25. Inspections collection: local-codes id: local-code:whitfield-county/code/14-25 cite_as: Whitfield County, Ga., Code of Ordinances § 14-25 canonical_url: https://georgiacommons.org/counties/whitfield/code/14-25 md_url: https://georgiacommons.org/counties/whitfield/code/14-25.md text_url: https://georgiacommons.org/counties/whitfield/code/14-25/text source_url: https://library.municode.com/ga/whitfield_county/codes/code_of_ordinances date: 2026-05-11 status: active jurisdiction: county:whitfield jurisdiction_name: Whitfield County county_fips: "13313" corpus_version: local-codes-whitfield-county-441d0d56c9e9 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/whitfield/code/~chapter-14/~article-ii.md previous: https://georgiacommons.org/counties/whitfield/code/14-24.md next: https://georgiacommons.org/counties/whitfield/code/14-26.md index: https://georgiacommons.org/counties/whitfield.md branch: code edition: As published by Municode, current through 2026-05-11 edition_date_kind: current_through source_publisher: Municode version_id: local-code:whitfield-county/code/14-25@2026-05-11-d42e01247f --- # Whitfield County Code of Ordinances, Sec. 14-25. Inspections > As published by Municode, current through 2026-05-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 14 - SITE DESIGN / Article II - PERMITS AND PROCEDURES (1) The county engineer may periodically, during working hours between 7:00 a.m. and 5:00 p.m., Monday through Friday, exclusive of holidays, inspect the sites for which permits have been issued to determine if the activities thereon are in accordance with the plan and if the measures required in the plan are effective. (2) The following types of construction are required to be inspected: a. Grading and storm drainage; b. Water and sewer line construction; c. Curb construction; d. Base and paving construction; e. Driveway construction; f. Buffers required by other ordinances; g. Initial installation of the following erosion control best management practices (BMP): 1. Construction exit; 2. Sediment basin; 3. Sediment trap; 4. Silt fence; 5. Any other BMP's as specified in the permit. h. Any construction in existing county rights-of-way, and i. Any additional inspections required at the time of permit issuance. (3) Each type of construction identified above shall be inspected at the time of its completion. In addition, each phase of construction shall be inspected before it is covered, built over, or otherwise hidden for inspection purposes by subsequent work. (4) When an inspection for approval is requested, the permit holder or his agent shall notify the building, zoning, and development department not less than 24 hours in advance of the work, during the hours of 7:30 a.m. to 4:30 p.m., Monday through Friday, exclusive of holidays. (5) The permit holder is fully responsible for any and all construction work. The county engineer may require any un-inspected work which is required to be inspected to be uncovered for inspection at the sole expense of the applicant. The county shall in no way be liable for any cost or damages arising from or in way associated with any delay or inconvenience associated with any work, delay or inconvenience caused by uncovering uninspected work. (6) After any inspection, the county engineer reserves the right to require modifications or corrections if said work does not meet the requirements of this ordinance and the permitted plans. ## History (Res. of 6-9-03, § 2-5)