(1) (2) The applicant shall submit the required copies of the application, construction drawings and engineering studies (such as drainage analysis and traffic studies.) A certification from an engineer or surveyor certifying that the plans meet or exceed the standards and specifica- tions of Whitfield County must accompany the plans. The presence of a valid stamp and signature of an engineer or surveyor on said plans shall be prima facie evidence of such certification. (3) The county engineer will distribute copies of the construction plans to and coordinate with any reviewing personnel or departments, such as the building, zoning and development department, utility comSITE DESIGN ยง 14-31 panies, and/or the fire department. The reviewing entities shall review the plans for compliance with their regulations and standards. (4) Permit applications shall be approved or denied as soon as practicable, but in any event, not later than 30 days after receipt of a completed application and supporting plans and documentation, as set forth herein. (5) If a permit application is denied, the reasons for denial shall be stated in writing to the applicant. A re-submittal of a denied application shall constitute a new application.