--- title: Whitfield County Code of Ordinances, Sec. 14-64. Sanitary sewer collection: local-codes id: local-code:whitfield-county/code/14-64 cite_as: Whitfield County, Ga., Code of Ordinances ยง 14-64 canonical_url: https://georgiacommons.org/counties/whitfield/code/14-64 md_url: https://georgiacommons.org/counties/whitfield/code/14-64.md text_url: https://georgiacommons.org/counties/whitfield/code/14-64/text source_url: https://library.municode.com/ga/whitfield_county/codes/code_of_ordinances date: 2026-05-11 status: active jurisdiction: county:whitfield jurisdiction_name: Whitfield County county_fips: "13313" corpus_version: local-codes-whitfield-county-441d0d56c9e9 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/whitfield/code/~chapter-14/~article-v.md previous: https://georgiacommons.org/counties/whitfield/code/14-63.md next: https://georgiacommons.org/counties/whitfield/code/14-65.md index: https://georgiacommons.org/counties/whitfield.md branch: code edition: As published by Municode, current through 2026-05-11 edition_date_kind: current_through source_publisher: Municode version_id: local-code:whitfield-county/code/14-64@2026-05-11-7c340d6598 --- # Whitfield County Code of Ordinances, Sec. 14-64. Sanitary sewer > As published by Municode, current through 2026-05-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 14 - SITE DESIGN / Article V - UTILITIES (1) Sanitary sewer laid within a public road shall be constructed along the centerline of the road at a depth of not less than five feet from the road surface to the top of the pipe. For curved streets, sewer shall be installed between gutter lines to avoid conflicts with other utilities. (2) Any structures, such as lift stations and manholes located in any 100-year flood plain shall be designed so as not to allow surface drainage inflow until flood elevations exceed one foot above the 100-year flood elevation. (3) Placement procedures of force main piping shall meet the same requirements as those procedures for the placement of water lines. ## History (Res. of 6-9-03, 5-4)