--- title: Whitfield County Code of Ordinances, Sec. 14-78. Post-development stormwater management performance criteria collection: local-codes id: local-code:whitfield-county/code/14-78 cite_as: Whitfield County, Ga., Code of Ordinances § 14-78 canonical_url: https://georgiacommons.org/counties/whitfield/code/14-78 md_url: https://georgiacommons.org/counties/whitfield/code/14-78.md text_url: https://georgiacommons.org/counties/whitfield/code/14-78/text source_url: https://library.municode.com/ga/whitfield_county/codes/code_of_ordinances date: 2026-05-11 status: active jurisdiction: county:whitfield jurisdiction_name: Whitfield County county_fips: "13313" corpus_version: local-codes-whitfield-county-441d0d56c9e9 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/whitfield/code/~chapter-14/~article-vi.md previous: https://georgiacommons.org/counties/whitfield/code/14-77.md next: https://georgiacommons.org/counties/whitfield/code/14-79.md index: https://georgiacommons.org/counties/whitfield.md branch: code edition: As published by Municode, current through 2026-05-11 edition_date_kind: current_through source_publisher: Municode version_id: local-code:whitfield-county/code/14-78@2026-05-11-ffe518c82d --- # Whitfield County Code of Ordinances, Sec. 14-78. Post-development stormwater management performance criteria > As published by Municode, current through 2026-05-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 14 - SITE DESIGN / Article VI - STORMWATER MANAGEMENT The following performance criteria shall be applicable to all stormwater management plans, unless otherwise provided for in this article: (a) Stormwater runoff quality/Reduction. Stormwater runoff generated from a site shall be adequately treated before discharge. It will be presumed that a stormwater management system complies with this requirement if: (1) The system is designed to retain the first 1.0 inch of rainfall on site to the maximum extent practicable. The determination by the County that it is infeasible to apply the stormwater runoff quality/reduction standard, on part or all of a project, must be documented with the site plan review documents. If the first 1.0 inch of rainfall can be retained onsite using runoff reduction methods, then no additional water quality treatment is required. If the 1.0 inch cannot be retained onsite, the remaining runoff from a 1.2-inch rainfall event must be treated to remove at least 80 percent of the calculated average annual post-development total suspended solids (TSS) load or equivalent as defined in the LDM and GSMM; (2) Appropriate structural stormwater controls or nonstructural practices are selected, designed, constructed or preserved, and maintained in accordance with the specific criteria in the LDM; and, (3) Runoff from "hotspot" land uses and activities identified in the LDM are adequately treated and addressed through the use of appropriate structural stormwater controls, nonstructural practices and pollution prevention practices. (b) Stream channel protection. Protection of stream channels from bank and bed erosion and degradation shall be provided by using all of the following three approaches: (1) Preservation, restoration and/or reforestation (with native vegetation) of the applicable stream buffer; (2) Twenty-four hour extended detention storage of the one year, 24 hour return frequency storm event; and, (3) Erosion prevention measures such as energy dissipation and velocity control. All design and construction work that is undertaken proximate to stream channels (including the buffer areas) shall be in strict conformance with current local, state, and federal regulations. (c) Flood protection. Flood and public safety protection shall be provided by controlling and safely conveying storm events such that flooding is not exacerbated for the storm events specified in the LDM and in accordance with applicable requirements in article VI hereof. (d) Drainage system guidelines. A system emphasizing a natural as opposed to an engineered drainage strategy shall be encouraged. The applicability of a natural approach depends upon such factors as site storage capacity, open channel hydraulic capacity, maintenance needs/ resources and regulatory permitting factors. Stormwater conveyance facilities may include but are not limited to culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutters, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of public and private properties adjoining project sites. Stormwater conveyance facilities that are designed to carry stormwater runoff from more than one parcel, existing or proposed, shall meet the following additional requirements: (1) Methods to calculate stormwater flows shall be in accordance with the LDM; (2) All culverts, pipe systems and open channel flow systems shall be sized in accordance with the stormwater management plan using the methods included in the LDM; and, (3) Design and construction of stormwater conveyance facilities shall be in accordance with the criteria and specifications found in the LDM. ## History (Ord. of 12-01-06, §§ 2, 3; Ord. No. 2020-1214, § 4, 12-14-20)