(a) The county administrator, director, public works director, or his or her designee, shall be responsible for determining whether a development is proceeding in accordance with the approved stormwater management plan. Periodic inspection of the development site shall be made by the director, or designee, to ensure that the stormwater management plan is properly implemented. (b) Upon completion of the construction phase on the project, and prior to approval of the final plat or issuance of a certificate of occupancy, the developer shall provide an as-built survey and an as-built design certification for each stormwater management facility. A certified record drawing of the facility shall be prepared based upon this as-built survey and certified by the design profession who prepared the stormwater management plan. Based on the actual parameters established on the record drawing, an addendum to the stormwater management plan shall be prepared which demonstrates that the facility, as constructed, complies with the requirements of the approved stormwater management plan. (c) Following final plat approval or issuance of a certificate of occupancy, the county administrator, director, public works director, or his or her designee, shall conduct periodic inspections of the stormwater facility upon a schedule established by the county. Inspection reports, including documented deficiencies and needed maintenance requirements, shall be included within the inspection reports and provided to the property owner to undertake appropriate action.