(1) Submit final plat. Any person seeking approval of a proposed minor subdivision plat shall submit directly to the Whitfield County Building, Zoning and Development Department a final plat which has been prepared in accordance with subsection (3) of this section, together with the prescribed fee. (2) Approval procedures. (a) Before submitting a proposed final plat to the Whitfield County Building, Zoning and Development Department, all applicable certificates of approval shall already be endorsed upon the plat by the appropriate department heads or officials, except for the certificate for approval of recording (minor subdivision), which is to be executed by an authorized representative of the Whitfield County Building, Zoning and Development Department after determining that all conditions have been met. (b) An authorized representative of the Whitfield County Building, Zoning and Development Department shall approve or deny such plat within five working days of its submittal after all other applicable certificates of approval have been executed. If no action is taken by the Whitfield County Building, Zoning, and Development Department, the plat shall stand approved. The developer/ subdivider may waive such time requirement and may consent to an extension of this period if both parties agree. (c) If a minor subdivision proposes access to a state highway, the Georgia Department of Transportation (GDOT) shall determine the feasibility of such access pursuant to O.C.G.A. § 32-6-151. The subdivider/ developer shall produce permits and/or written permission from the Georgia Department of Transportation (GDOT) for the proposed access. (3) Final plat. A developer/subdivider shall submit a final plat to the Whitfield County Building, Zoning and Development Department pursuant to the following sequence of submittal, review, and approval: (a) A minimum of five copies of the final plat shall be submitted. (b) If the developer/subdivider places restrictions upon any of the lots or parcels contained in the subdivision greater than those required by this chapter, such restrictions or reference thereto shall be identified upon the plat. (c) Approval procedures. Within five working days after submittal of the final plat and all supporting documentation, data, and certifications, the final plat shall be approved or disapproved by the Whitfield County Building, Zoning, and Development Department. If no action is taken within such period, the plat shall stand approved. The Whitfield County Building, Zoning and Development Department may disapprove any such final plat if any portion of the proposed subdivision is in violation of any applicable ordinance, law, rule, or regulation of any governmental unit having jurisdiction. (d) Completeness. If any of the specifications or facts required herein are omitted or misrepresented, the Whitfield County Building, Zoning, and Development Department may refuse to review such plat and may return such submittal to the developer/subdivider for completion or revision. (e) Final plat specifications. The final plat shall be prepared by a Georgia Registered Land Surveyor. If a professional engineer, licensed to practice in Georgia, shall contribute to the plat, then appropriate seals shall be shown. The plat shall be drawn at a scale appropriate to show details but no smaller than 200 feet to one inch. The plat shall be drawn in permanent ink on reproducible material upon a sheet or sheets not exceeding 17 by 22 inches, in compliance with Georgia law, and unless specifically waived, in whole or in part by the Whitfield County Building, Zoning, and Development Department, shall include: 1. The name of the subdivision and road names; 2. The name, address, and telephone number of the person to be notified of action; 3. The name, address, seal, and license number of the registered land surveyor; the original signature of the surveyor shall be across the seal for the plat to be valid; also, if a professional engineer participated in the development of the plat, the name, address, seal, and license number of such professional engineer shall be placed thereon; 4. The date of the plat drawing, graphic scale, north point, notation as to the reference of bearings to magnetic, true north, or grid north and indication whether bearings shown are calculated from angles turned or taken from compass readings; 5. The location of the parcel land district and land lot giving total acreage being subdivided, total number of lots created and total length of new roads within the development; 6. A general location map at a scale not less than one inch equals 1,000 feet, showing the relationship of the plat to other existing roads and properties in Whitfield County; 7. The index map where more than one sheet is required to present the plat; [Note: multiple sheets shall each be named to conform with the title sheet and designated for example: 1 of 3, 2 of 3, and 3 of 3]; 8. Identify the point of beginning (POB) tied to the nearest existing road intersection or nearest land lot line or district line; 9. Exact boundary lines and zoning classifications, of the parcel shall be in compliance with the Georgia Plat Act, O.C.G.A. § 15-6-67; 10. City, county or land lot lines accurately tied to the lines of the subdivision by distance and angles when such lines traverse the subdivision; 11. Road centerlines, showing angles of deflection and standard curve data of intersection, radii, length of tangents and arcs, and degree of curvature; 12. Lot lines with dimensions to the nearest one-hundredth foot, and bearings to the nearest minute, arcs, and chords and tangent to radii of rounded corners; 13. The location and dimension of all approved exempted access easements; 14. Front and rear structure or building setback lines; side setback lines may be noted upon the survey, but shall not be required to be shown upon each lot; 15. Lots or parcels numbered in numerical order or numbered in relationship to each phase of development; phase development lines; 16. Locations of monuments and markers to the degree of accuracy required of professional engineers and/or registered land surveyors pursuant to Georgia law; 17. The boundary and elevation of the 100-year floodplain as determined by F.I.R.M. and/or best available data, as determined by the Whitfield County Engineer; 18. Applicable certificates and statements as specified in this chapter; 19. If restrictions apply to the subdivision, then such restrictions shall be shown or noted on the final plat; 20. The location and dimension of all areas proposed to be set aside for recreational use, open space, green space, or other public use, with designation of the purpose thereof, and conditions, if any, of the dedication or reservation; 21. The Whitfield County Tax Assessor's map and existing parcel numbers for G.I.S. purposes. (f) Final plat certificates of approval. Each final plat submitted shall carry certificates of approval appropriate to the particular development and signed by the appropriate departmental authorities. The following certificates may apply; if not, then statements appropriate to the development may be prepared after consultation with the Whitfield County Building, Zoning and Development Department: 1. Final Accuracy and Design Certificate It is hereby certified that this plat is true and correct and was prepared from an actual survey of the property made by me or under my supervision: that all monuments shown hereon actually exist and their location, size, type, and material are correctly shown; and that all requirements of the Whitfield County Subdivision Regulations have been substantially complied with, and approval hereof does not relieve me of any liability associated with inaccuracies or improper design. By Registered Georgia Land Surveyor No. and Seal Date 2. Certificate of Approval for Public Water System I hereby certify that the water system serving the public roads on this final plat has been installed (or sufficient surety has been provided to install) in accordance with the requirements of Dalton Utilities. Dalton Utilities: Date: Certificate of Approval for Public Wastewater Collection System I hereby certify that the wastewater collection system serving the public roads on this final plat has been installed (or sufficient surety has been provided to install) in accordance with the requirements of Dalton Utilities. Dalton Utilities: Date: 3. Certificate of Approval for OnSite Sewage Management System Each lot shown hereon is suitable for the use of an existing septic system or for the installation of a new individual onsite sewage management system. Each new system installed will require a permit to be issued before construction begins, dependent upon the location of any structures and any limitations which could adversely affect the performance of an on-site sewage management system. General approval is hereby granted for one dwelling per lot for this subdivision site [with the exception of lot nos. , , ]. Date Whitfield County Environmental Specialist 4. Certificate of Approval for Recording [Minor Subdivision]. The Whitfield County Building, Zoning, and Development Department certifies that this plat complies with the minor subdivision provisions of the Whitfield County Subdivision Regulations, [with the exception of such variances, if any, as are noted upon the plat], and that it has been approved for recording in the Office of the Clerk of the Superior Court of Whitfield County, Georgia. Date Authorized Representative 5. Certificate of Approval for Fire Protection. I hereby certify that fire hydrants and water mains serving the lots on this final plat have been installed and flow requirements for the fire hydrants have been met in accordance with the requirements of the Whitfield County Building Code for Fire Hydrant and Water Supply Requirements. Whitfield County Fire Chief: Date: (4) Reliance upon recorded plat. A developer/ subdivider may rely upon the provisions set forth in any plat approved and recorded pursuant to this ordinance to the extent that any such conditions constitute vested rights pursuant to Georgia law.