(1) Land suitability. Land which is unsuitable for subdivision or development due to flooding, wetlands, improper drainage, steep slopes, rock formations, adverse earth formations or topography, utility easements, or other features which would be harmful to the safety, health, and general welfare of inhabitants of the land and/or the general public and surrounding areas shall not be subdivided or developed unless adequate methods are designed by the developer/subdivider to solve the problems created by the unstable land conditions. Said design methods shall include but not be limited to Georgia Department of Transportation Standard Manuals and Specifications for the Construction of Roads and Bridges and the Utility Accommodations Policy and Standards, current editions, and supplements thereto; American Association of State Highway and Transportation Officials (AASHTO) Manuals for Arterial Streets, Rural, Urban, and Interstate Highways, current editions; American Water Works Association (AWWA) standards, current editions, Georgia State Department of Natural Resources (DNR), Environmental Protection Division (EPD), Rules for Safe Drinking Water, Rules and Regulations for Water Quality Control, latest editions; American National Standards Institute (ANSI) Standards, latest editions; and American Society for Testing and Materials (ASTM) Standards, latest editions. Any such design(s) shall be subject to review and approval by the Whitfield County Engineer. The county engineer shall provide a written statement justifying the denial of the final plat based on land suitability. (2) Annexation. Subdivisions planned for future annexation by any city shall be developed to then-current city standards, if any such standard shall exceed that of Whitfield County, and shall be subject to the review and comment of such city.