No mobile home nor manufactured home manufactured or built on or before June 15, 1976, shall be set up for living purposes within Whitfield County. (1) There shall be available to the manufactured home a sewer service line at least three inches in diameter, which shall be connected to receive the waste from the shower, bathtub, flush toilet, lavatory, and kitchen sink of the manufactured home meeting the minimum requirements of the county building and plumbing codes. The sewer service line shall be connected to discharge the waste into: a. The public sanitary sewer system; or b. A permanent septic tank or private sewer or disposal plant that meets the requirements of the county health department. (2) An adequate supply of pure water for drinking and domestic purposes shall be available for connection to such manufactured homes within the site boundaries that meet the requirements of the county health department. (3) The chassis of the manufactured home shall be supported on an adequate masonry foundation, as required by the building codes adopted by the county. (4) The manufactured home shall be appropriately anchored to meet minimum requirements of the county building code. (5) All manufactured homes, whether new, pre-owned, or moved from one location to another, shall be subject to the following inspections: (a) Pre-inspection. Prior to the issuance of a manufactured home permit by the building inspector, the applicant shall allow the home to be inspected by the building inspector, or his designee, to determine if minimum standards for condition and utilities are present. (i) New manufactured homes shall be exempt from pre-inspection. (b) Lot inspection. The site of the proposed location of the manufactured home shall be inspected for compliance with county codes, and the final site grade shall be inspected for adequate draining purposes. (c) Setup inspection. The anchoring and foundation of the manufactured home, and all utility connections underneath the home shall be inspected. (d) Power inspection. The electrical panel inside the manufactured home and the meter base outside the home shall be inspected prior to energizing the home. (e) Final inspection. The manufactured home shall be inspected for finished electrical, plumbing, heating, smoke detectors, underpinning, ingress/ egress, and other finished construction prior to the issuance of a certificate of occupancy.