--- title: Whitfield County Code of Ordinances, Sec. 5-31. Development plan collection: local-codes id: local-code:whitfield-county/code/5-31 cite_as: Whitfield County, Ga., Code of Ordinances ยง 5-31 canonical_url: https://georgiacommons.org/counties/whitfield/code/5-31 md_url: https://georgiacommons.org/counties/whitfield/code/5-31.md text_url: https://georgiacommons.org/counties/whitfield/code/5-31/text source_url: https://library.municode.com/ga/whitfield_county/codes/code_of_ordinances date: 2026-05-11 status: active jurisdiction: county:whitfield jurisdiction_name: Whitfield County county_fips: "13313" corpus_version: local-codes-whitfield-county-441d0d56c9e9 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/whitfield/code/~chapter-5/~article-i/~division-3.md previous: https://georgiacommons.org/counties/whitfield/code/5-30.md next: https://georgiacommons.org/counties/whitfield/code/5-32.md index: https://georgiacommons.org/counties/whitfield.md branch: code edition: As published by Municode, current through 2026-05-11 edition_date_kind: current_through source_publisher: Municode version_id: local-code:whitfield-county/code/5-31@2026-05-11-969bfb4874 --- # Whitfield County Code of Ordinances, Sec. 5-31. Development plan > As published by Municode, current through 2026-05-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 5 - BUILDINGS, CONSTRUCTION AND RELATED ACTIVITIES / Article I - BUILDING ORDINANCE / Division 3 - FIRE HYDRANT AND WATER SUPPLY REQUIREMENTS Any person subject to section 5-30 hereinabove shall submit a development plan, showing the type of development, building spacing, general lot layout, the location of fire hydrants and the proposed flow requirements to the Whitfield County Fire Chief for the purposes of approval of the fire protection plan for such development. Following approval by the Whitfield County Fire Chief, a copy of such plan, showing general lot layout and the proposed location of fire hydrants and water mains and the proposed flow requirements for the fire hydrants shall be submitted to Dalton Utilities to determine whether or to what extent adequate water flow may be provided to meet the proposed flow requirements of the new development. The plan shall be sufficiently detailed, showing by metes and bounds the proposed locations of all fire hydrants and water mains thereto, the size and specifications of fire hydrants and water mains thereto, required fire flows for the type of development contemplated, and materials to be used, including, but not limited to, pipe, valves, and fittings. Prior to the commencement of any construction, such plan must receive approval from both the Whitfield County Fire Chief and from Dalton Utilities. ## History (Ord. of 11-28-05)