--- title: Whitfield County Code of Ordinances, Sec. 5-39. Construction board of adjustment and appeals collection: local-codes id: local-code:whitfield-county/code/5-39 cite_as: Whitfield County, Ga., Code of Ordinances § 5-39 canonical_url: https://georgiacommons.org/counties/whitfield/code/5-39 md_url: https://georgiacommons.org/counties/whitfield/code/5-39.md text_url: https://georgiacommons.org/counties/whitfield/code/5-39/text source_url: https://library.municode.com/ga/whitfield_county/codes/code_of_ordinances date: 2026-05-11 status: active jurisdiction: county:whitfield jurisdiction_name: Whitfield County county_fips: "13313" corpus_version: local-codes-whitfield-county-441d0d56c9e9 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/whitfield/code/~chapter-5/~article-i/~division-4.md previous: https://georgiacommons.org/counties/whitfield/code/5-38.md next: https://georgiacommons.org/counties/whitfield/code/5-40.md index: https://georgiacommons.org/counties/whitfield.md branch: code edition: As published by Municode, current through 2026-05-11 edition_date_kind: current_through source_publisher: Municode version_id: local-code:whitfield-county/code/5-39@2026-05-11-6e320ee323 --- # Whitfield County Code of Ordinances, Sec. 5-39. Construction board of adjustment and appeals > As published by Municode, current through 2026-05-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 5 - BUILDINGS, CONSTRUCTION AND RELATED ACTIVITIES / Article I - BUILDING ORDINANCE / Division 4 - PROCEDURES FOR MINIMUM STANDARD CODES (1) Appointment. There is hereby established a board to be called the construction board of adjustment and appeals, which shall consist of five members. The board shall be appointed by the Whitfield County Board of Commissioners. (2) Membership and terms. (a) Membership. The construction board of adjustment and appeals should consist of five members. Such board members should be composed of individuals with knowledge and experience in the technical codes, such as design professional, contractors or building industry representatives; provided, however, at least two members shall be from the general public. A board member shall not act in a case in which he has a personal or financial interest. (b) Terms. The terms of office of the board member shall be staggered so no more than one-third of the board is appointed or replaced in any 12-month period. Vacancies shall be filed for an unexpired term in the manner in which original appointments are required to be made. Continued absence of any member from required meetings of the board shall, at the discretion of the Whitfield County Board of Commissioners, render any such member subject to immediate removal from office. (c) Quorum and voting. A simple majority of the board shall constitute a quorum. In varying any provision of this Code, the affirmative votes of the majority present shall be required. In modifying a decision of the building inspector, not less than two affirmative votes shall be required. (d) Secretary of board. The building inspector shall act as secretary of the board and shall make a detailed record of all its proceedings, which shall set forth the reasons for its decision, the vote of each member, the absence of a member and any failure of a member to vote. (3) Powers. The construction board of adjustment and appeals shall have the power, as further defined in subsection (4) to hear the appeals of decisions and interpretations of the building inspector and consider variances of the technical codes. (4) Appeals. (a) Decision of the building official. The owner of a building structure or service system, or his duly authorized agent, may appeal a decision of the building inspector to the construction board of adjustment and appeals whenever any one of the following conditions are claimed to exist: 1. The building inspector rejected or refused to approve the mode or manner of construction proposed to be followed of materials to be used in the installation or alteration of a building structure or service system. 2. The provisions of this Code do not apply to this specific case. 3. That an equally good or more desirable form of installation can be employed in any specific use. 4. The true intent and meaning of this Code or any of the regulations thereunder have been misconstrued or incorrectly interpreted. (b) Variances. The construction board of adjustment and appeals, when so appealed to and after a hearing, may vary the application of any provision of this Code to a particular case when, in its opinion, the enforcement thereof would do manifest injustice and would be contrary to the spirit and purpose of this Code or the technical codes or public interest, and also finds all of the following: 1. That special conditions and circumstances exist which are peculiar to the building, structure or service system involved and which are not applicable to others. 2. That the special conditions and circumstances do not result from the action inaction of the applicant. 3. That granting the variance requested will not confer on the applicant any special privilege that is denied by this Code to other buildings, structures or service system. 4. That the variance granted is the minimum variance that will make possible the reasonable use of the building, structure or service system. 5. The granting of the variance will be in harmony with the general intent and purpose of this Code and will not be detrimental to the public health, safety and general welfare. In granting the variance, the construction board of adjustment and appeals may prescribe a reasonable time limit within which the action for which the variance is required shall be commenced or completed or both. In addition, the construction board of adjustment and appeals may prescribe appropriate conditions and safeguards in conformity with this Code. Violation of the conditions of a variance shall be deemed a violation of this Code. (c) Notice of appeal. Notice of appeal shall be in writing, and filed within 30 calendar days after the decision is rendered by the building inspector. Appeals shall be in a form acceptable to the building inspector. (d) Unsafe or dangerous buildings or service systems. In the case of a building, structure, or service system which, in the opinion of the building inspector, in unsafe, unsanitary or dangerous, the building inspector may, in his order, limit the time for such notice of appeals to a shorter period. (5) Rules and regulations. (a) Procedures. The construction board of adjustment and appeals shall establish rules and regulations for its own procedures not inconsistent with the provisions of these procedures. The construction board of adjustment and appeals shall meet on call of the chairman. The construction board of adjustment and appeals shall meet within 30 calendar days after notice of appeal has been received. (b) Decisions. The construction board of adjustment and appeals shall, in every case, reach a decision without unreasonable or unnecessary delay. Each decision of the construction board of adjustment and appeals shall also include the reasons for the decision. If a decision of the construction board of adjustment and appeals reverses or modifies a refusal, order, or disallowance of the building inspector or varies the application of any provision of this Code, the building inspector shall immediately take action in accordance with such decision. Every decision shall be promptly filed in writing in the office of the building inspector and shall be open to public inspection. A certified copy of the decision shall be sent by mail or otherwise to the appellant and a copy shall be kept publicly posted in the office of the building inspector for two weeks after filing. Every decision of the board shall be final, subject however to such remedy as any aggrieved party might have at law or in equity. ## History (Res. of 5-14-07, § 2)