Whitfield County · Code of Ordinances
Chapter 5 - BUILDINGS, CONSTRUCTION AND RELATED ACTIVITIES / Article III - FLOOD DAMAGE ORDINANCE / Division 2 - FLOOD DAMAGE CONTROL
Sec. 5-55. Duties and responsibilities of the county engineer.
About this text
- As published by Municode, current through 2026-05-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Duties of the county engineer shall include, but not be limited to the following:
(1) Review all development permits to assure that the permit requirements of this article have been satisfied.
(2) Advise permittees that additional federal or state permits may be required, and if specific federal or state permit requirements are known, require that copies of such permits be provided and maintained
on file with the development permits. A known requirement is section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334.
(3) Notify adjacent communities and the Georgia Department of Natural Resources, prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Emergency Management Agency.
(4) Submit engineering data and/or analysis within six months to the Federal Emergency Management Agency for any altered or relocated watercourse, to ensure the accuracy of the community flood map.
(5) Assure that maintenance is provided within the altered or relocated portion of the watercourse so that the flood-carrying capacity is not diminished.
(6) Verify and record the actual elevation (in relation to mean sea level) of the lowest floor (including basement) of all new or substantially improved buildings, in accordance with subsection (b)(2) of this section.
(7) Verify and record the actual elevation (in relation to mean sea level) to which the new or substantially improved buildings have been floodproofed, in accordance with subsection (b)(2) of this section.
(8) When floodproofing is utilized for a particular building, obtain certification from a registered professional engineer or architect.
(9) Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions), make the necessary interpretation.
The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article.
(10) When base flood elevation data or floodway data have not been provided in accordance with this article, obtain, review, and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source, in order to
administer the provisions of this article.
(11) Maintain all records pertaining to the provisions of this article in his office, which records shall be open for public inspection.
History
(Res. of 1-7-02, § 2-5)