Skip to content
Georgia Commons
Menu

Whitfield County · Code of Ordinances

Chapter 7 - COUNTY UTILITIES AND SERVICES / Article II - SEWERS / Division 3 - BUILDING SEWERS AND CONNECTIONS

Sec. 7-44. Separate building sewer for each building.

About this text

  • As published by Municode, current through 2026-05-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A separate and independent building sewer shall be provided for every building; except that where one building stands at the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, courtyard, or driveway, the building sewer from the front building may be extended to the rear building and the

whole considered as one building sewer if approved by the county engineer or his or her designee.

History

The history line the source prints at the end of the section.

(Ord. of 6-16-08, § 1)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:whitfield-county/code/7-44@2026-05-11-2e4e9268b0

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.