In every mobile home park, the following street improvements and utilities shall be planned for and provided by the developer, by installation and/or payment prior to the approval of the mobile home park: (1) Generally. All streets shall be named and marked with signs in accordance with county-approved names and shall include street grading and street paving. a. Sanitary sewer lines, septic tanks, or other sewerage disposal system shall be in conformity with requirements of the county health department. b. All utilities, except power lines and telephone lines, shall be installed underground in the shoulders of the road. (2) Base and paving. Base and paving shall meet the requirements of the department of transportation for rural roads. (3) Mobile home park streets. Mobile home park street improvement width shall be 20 feet, unless a street serves 15 homes or less, then it may be 18 feet wide. (4) Linear street grades. Maximum and minimum linear street grades shall be as follows: a. Collector streets: not more than 12 percent. b. Subcollectors, lanes, and parking spaces: not more than 15 percent. c. No linear street grade shall be less than one half of one percent. (5) Storm drainage facilities. a. A registered engineer must certify that the proposed storm drainage improvements indicated on the mobile home park plan are adequate. b. If a storm drainage sewer system exists in the county area, then the proposed mobile home park must contain an underground storm drainage system which will be connected to the existing area system. Such system shall be indicated on the plat. c. If a storm drainage sewer system does not exist in the county, the adequate surface drainage facilities as certified by an engineer, shall be included in the mobile home park and so indicated on the plan. d. Where a proposed mobile home park is traversed by a watercourse, drainage way, channel, or stream, there shall be provided a stormwater easement or drainage right-of-way along each side of the channel or course for the purpose of widening, deepening, relocating, improving, or protecting such drainage easement. (6) Minimum requirements. All mobile home subdivisions shall be required to meet all the standards and provisions of the subdivision regulations of the county. (7) Compliance with applicable codes. All mobile home places erected or located in the county shall be required to meet the adopted building, heating, plumbing, electrical, fire, gas, mechanical, air conditioning, and all other codes, if any, adopted by the county. (8) Penalties to single-family mobile home owners. Failure by the owner of a mobile home to obtain and utilize tiedowns and anchors for his mobile home placed in the county after the effective date of the ordinance from which this article is derived shall constitute a misdemeanor.