(a) Subdivision and mobile home park water supply. A public water supply shall be required if available within 1,000 feet of the proposed subdivision or mobile home park. (b) Subdivision and mobile home park percolation tests. Where required for planning purposes and determination of the general absorption capacity of soils, the number of percolation tests to be made shall be one per lot, in the area where absorption fields are to be located. Preparatory to construction of on-site sewage management systems, individual lots within the proposed development shall comply with section 32-21 for on-site sewage management systems. (c) Subdivision and mobile home park test borings. Where required for planning purposes, test borings to determine groundwater elevations and subsurface rock formations shall be made at locations, in numbers and at depths to be determined by the county board of health.